Title Page

  • Store Name

  • Store No.

  • Conducted on

  • Prepared by

  • Location

Contractor Information

  • Name of current Refrigeration contractor?

  • Name of new Refrigeration contractor?

  • Name of representatives from each contractor and position

Plant

  • Are any compressors valved or switched off?

  • Any compressors isolated in software?

  • Any compressors electrically disconnected in panels?

  • Oil levels healthy?

  • Are all high and low transducers reading correctly?

  • Are any alarm relays pulled?

  • Are PRV's tagged correctly, and in date?

  • Any Dates or evidence present showing - 1. Driers changed 2. Strainers clean or replaced 3. Oil test sample kits available for inspection <br><br>

  • Are refrigerant levels good?

  • Is drawing present and up to date?<br>

  • Is integral list present?<br>

  • Additional information or comments

  • Photo's

Condensers

  • Any fans switched off or removed?

  • Any fans electrically disconnected in panels?

  • Any fans switched off or removed?

  • External humidity sensor operational?

  • Do any condensers need replacing?

  • Additional information or comments

  • Photo's

Refrigerant

  • What Leak Detection is fitted?

  • Leak detection operating

  • Real zero valve caps used

  • Entrained volume information present?

  • Are 2016 F-Gas sheets present?

  • Additional comments

  • Photo's

Cold Storage

  • Any evaporators iced up?

  • Any evidence of drain leaks?

  • Any evaporator fan motors faulty?

  • Do any evaporators need cleaning?

  • All coldstore lighting operational?

  • Additional information

  • Photo's

Salesfloor Area

  • Any equipment not operational on visit?

  • Any kick-plates not fitted correctly?

  • Any lighting not operational?

  • Are ice machine filters date tagged and in date?

  • Are there any empty cylinders on site which require removing?<br>A

  • Photo's

  • Additional information

Miscellaneous

  • Additional items

  • Photo's

MML Outstanding Items

  • 1. Any items which are listed in this section will require supporting paper trail sending separately.
    2. All items will be reviewed separately
    3. Decision will be made on where this work is to be completed before handover

  • Photo's

  • List items

Sign Off

  • 1. All items identified on Audit which form part of current service providers contract will require completing before store handover.
    2. All identified items will require completing within 14days.
    3. New service provider will verify all items are completed, and they are happy to except store.
    4. Any additional contract items found after start date will come under new service provider
    5. Any not contract spend will be agreed with Refrigeration manager who covers store.
    6. Any items identified on Audit and not completed by handover date, will be charged to past service provider.

  • WMS Engineer

  • Current service provider

  • New service provider

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.