Information

  • Goals: 1) Place equipment & ingredients within arm's reach of the employee primarily responsible for the work content. 2) Reduce the amount of cross-over & footsteps taken in order for an employee to perform their work content. 3) Place higher usage items in the easiest to reach location with a POU.

  • JIB#:

  • Conducted on

  • Prepared by

  • Location
  • PIC Name:

Grill

Grill- Equipment placement in order of priority: Efficient ( Y/N )

  • POU freezers at grill workstation for storing frozen proteins

  • POU refrigerator or side door access to the walk in cooler at grill workstation for storing refrigerated proteins

  • PHC, ideally placed where employees do not have to bend or reach up for access to drawers. If in the same area as toasters, place closer to grill to minimize crossover with position 5.

  • If grill cook is responsible for assembly setups: <br>Microwave and Rice cooker should be close to the set up <br>Refrigerator.

Assembly

Assembly - Equipment placement in order of priority: Efficient ( Y/N )

  • PHC, ideally placed where employees do not have to bend or reach up for access to drawers.<br>If in the same area as toasters, place closer to grill to minimize crossover with position #2.

  • Contact toaster, there needs to be enough space to allow for a bag of jumbo and regular buns by the toaster. Dual contact toasters is an alternate option.

  • PFW/AHU adjacent to position 4 and 5 so they have easy /quick access. AHU is preferred to PFW because better quality and longer hold times.

  • Sourdough Bread Griller, with a place for an opened bag of bread. For kitchens with good adjacencies for a single toaster, the new dual contact toaster is even more beneficial,is space saving and cooks sourdough bread faster.

  • POU refrigerator allowing position 5 to access

Set ups : Efficient ( Y/N )

  • If assembly position is responsible for assembly setups, Microwave and Rice cooker should be close to the setup refrigerator

  • Batch Toaster with corresponding bread storage

Fryer

Fryer Workstation - Equipment placement in order of priority: Efficient ( Y/N )

  • Fry bin adjacent to fry fryer

  • POU freezer under fry bin

  • Dual temp POU refrigerator /freezer adjacent to fryer for product storage

  • Taco assembly adjacent to taco fryer

  • PFW/AHU adjacent to positions 4 and 5 so they have easy/ quick access. AHU is preferred to PFW because better quality and longer hold times.

Drive-thru

Drive-thru & Front counter workstation -equipment placement in order of priority: Efficient ( Y/N )

  • Appropriate amount of coffee brewers, airports, and iced tea urns.

  • Adequate POU refrigeration at both stations to accommodate the menu.

  • Drive -thru: OJ, Milk, Desserts, sauces, Creamers, etc.

  • Front Counters: same as DT, plus salads

  • Smoothies / Shakes

  • Order handout directly across from pass-thru or fry bin, with POS system closer to dinning room/ kitchen door, reducing footsteps for positions 6 & 8

Manager Signature & References

  • Manager Signature

References :


  • POU planograms, can be utilized by most Mark styles, as they are designed for specific POU's.
    You may access all planograms via the portal:
    Restaurant Portal>Resources>Job Aids>search TDC 1286

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.