Title Page
-
Start Date
-
Site Set Up (SLG, Safety Zone, Permit Board)
-
Prepared by
-
Location
Digging
-
Are Services Correctly Marked?
-
Any Hazards Regarding Utilities , E.G Within 10 Metres of Mains Services
-
Explain
Photographic Evidence
-
Photos Of Initial Dig
-
Photo Of Blockage Located
-
Photos Of Repair
-
Photo Of Sub Base
-
Photo Of Sand And Marker Tape
-
Bitumen (not needed if in verge)
-
Photos Of Surface Area (Tarmac , Verge etc)
-
Reinstatement
Blockage 2 (If Needed)
-
Photos Of Initial Dig
-
Photo Of Blockage Located
-
Photos Of Repair
-
Photo Of Sub Base
-
Photo Of Sand And Marker Tape
-
Bitumen (not needed if in verge)
-
Photos Of Surface Area (Tarmac , Verge etc)
-
Reinstatement
Blockage 3 (If Needed)
-
Photos Of Initial Dig
-
Photo Of Blockage Located
-
Photos Of Repair
-
Photo Of Sub Base
-
Photo Of Sand And Marker Tape
-
Bitumen (not needed if in verge)
-
Photos Of Surface Area (Tarmac , Verge etc)
-
Reinstatement
Blockage 4 (If Needed)
-
Photos Of Initial Dig
-
Photo Of Blockage Located
-
Photos Of Repair
-
Photo Of Sub Base
-
Photo Of Sand And Marker Tape
-
Bitumen (not needed if in verge)
-
Photos Of Surface Area (Tarmac , Verge etc)
-
Reinstatement
Blockage 5 (If Needed)
-
Photos Of Initial Dig
-
Photo Of Blockage Located
-
Photos Of Repair
-
Photo Of Sub Base
-
Photo Of Sand And Marker Tape
-
Bitumen (not needed if in verge)
-
Photos Of Surface Area (Tarmac , Verge etc)
-
Reinstatement
Registration
-
Reinstatement Measurements ( Length x Width x Depth )
-
Photos Of Site Clearance
-
Coordinates of blockage (Eastings & Northings)
-
Finish Time And Date