Information
-
AUDITOR
-
GANG
-
CONTRACT
-
Audit date
-
Location
SLG / SAFETY / CERTIFICATION
-
SLG & site layout as per Codes Of Practice
-
Do gang have correct accreditation ?NRSWA Unit7 Hot bituminous materials
-
Stop gang from working and contact your project manager
-
Permit board displayed / completed / appropriate
-
POWRA COMPLETED ?
-
Do gang have fire extinguisher ?
-
Do gang have first aid kit and in date ?
-
Do gang have spill kit .?
-
Is water bottle being used / available ?
-
Vehicle, plant, tools & materials fit for purpose / stored safely
-
Has team got correct ID cards/tickets to be on site
- Yes
- No
- N/A
-
Correct compaction equipment for surface type? Read notes....
-
Site condition / Environmental considerations acceptable
-
PPE Appropriate & in use
REINSTATEMENT METHODS / MATERIALS
-
Road type / construction known & applied
-
Backfill materials suitable
-
Compaction of backfill correct / appropriate
-
Has grab brushed up and made sure there was no rubble is left on site?
-
Watering can fitted with a rose ?
-
Bituminous materials within correct temperature range / suitable
-
Edge sealant used / appropriate
-
Compaction of bituminous correct / appropriate
QUALITY & PERFORMANCE
-
Cut back / proximity to SROH
-
Profile / trips / edge depression within tolerance to SROH
-
Damaged modules / slabs replaced
-
Road markings replaced permanent or temporary with appropriate material
MEASUREMENT AUDIT
-
type1 materials /backfill appropriate and correct levels (photo with depth gauge )
-
Surface and wearing course to correct thickness (photo with depth gauge)
SUMMARY
-
Please provide any other info not covered and feedback from yourself or gang
SIGNATURES
-
Auditor(s) signature
-
Discuss your findings with the team. Encourage them to give you feedback. Help identify where we can all improve safety, quality and welfare.