Re-Power Generator Refurbishment
-
Client NextEra Energy
-
Conducted on
-
Site Callahan Divide
-
Prepared by
-
Personnel
Generator Information
-
Generator Type
-
Serial
-
Pad #
-
Nameplate Photo
Disassembly Information
Repair Information/Tolerances DE and NDE Bearing Journal VEM 159 (+0.040/-0.015) Hitachi 149 (+0.040/-0.015) DE and NDE Bearing Housing VEM 340 (+0.036/-0) Hitachi 320 (+0.036/-0) DE Coupling Shaft Area 120mm (+0/-0.022) Collector Ring Total Indicated Runout (TIR) +/- 5mils Collector Ring Groove Depth Phase <1.00mm Ground <2.00mm
-
Generator Interior/Exterior
-
Noted Anomalies of Interior/Exterior
-
Brush Box Condition
-
Collector Ring Condition
-
Collector Ring Insulation Resistance Measurements Phase to Ground
-
Collector Ring Runout Pass/Fail Record numbers if failed
-
Collector Ring Groove Depth Pass/Fail Record numbers if failed
-
NDE Condition
-
NDE Bearing Journal Pass/Fail Record numbers if failed
-
NDE Bearing Housing Pass/Fail Record numbers if failed
-
NDE Additional Findings
-
DE Condition
-
Coupler Shaft Diameter Pass/Fail Record numbers if failed
-
DE Bearing Journal Pass/Fail Record numbers if failed
-
Bearing Housing Pass/Fail Record numbers if failed
-
DE Additional Findings
-
Interior of Rotor and Stator Boxes
Assembly Information
-
NDE Bearing Greased and Installed
-
NDE End bell Installed
-
Brush Box Cleaned and Installed
-
Collector Ring Installed
-
Cleaned Collector Ring Insulation Resistance Readings/Phase to Ground
-
DE Bearing Greased and Installed
-
DE End Bell Installed
-
GEN Coupler Installed
-
Completed Unit
-
Upper Fan (If Applicable) Motor Function Test Results Pass/Fail
-
Heat Exchanger Fan Motor Function