Title Page
-
Site Name (Reservoir)
-
Conducted on
-
Prepared by
-
Task Number
1.0 General Information
-
NOTIFY CONTROL ROOM PRIOR TO MAINTENANCE ACTIVITY
-
Minor Repairs to be rectified during service
-
Major repairs to be documented on checklist and form forwarded to Water Infrastructure Services.
-
Site Overview
2.0 Switchboard Checks
Switchboard Checks
-
Check and Tighten all Electrical Connections
-
Correct Labelling
-
Check Continuity of Main Earth
Check Operation of Floats
-
Duty Start
-
Duty Stop
-
High Level
-
Overflow
Level Control Device
-
Scaling of Level Control Device
Telemetry
-
Telemetry Inputs
Cabinet Cleanliness / Vermin Control
-
Report on the cabinet cleanliness and vermin control
3.0 Completed and Future Work
-
Completed Work
-
Work to be Completed
Signature
-
Tradesman and Signature