Title Page

  • Site Name (Reservoir)

  • Conducted on

  • Prepared by

  • Task Number

1.0 General Information

  • NOTIFY CONTROL ROOM PRIOR TO MAINTENANCE ACTIVITY

  • Minor Repairs to be rectified during service

  • Major repairs to be documented on checklist and form forwarded to Water Infrastructure Services.

  • Site Overview

2.0 Switchboard Checks

Switchboard Checks

  • Check and Tighten all Electrical Connections

  • Correct Labelling

  • Check Continuity of Main Earth

Check Operation of Floats

  • Duty Start

  • Duty Stop

  • High Level

  • Overflow

Level Control Device

  • Scaling of Level Control Device

Telemetry

  • Telemetry Inputs

Cabinet Cleanliness / Vermin Control

  • Report on the cabinet cleanliness and vermin control

3.0 Completed and Future Work

  • Completed Work

  • Work to be Completed

Signature

  • Tradesman and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.