Information

  • Asset ID

  • Conducted on

  • Audit conducted by

  • Name

  • Locality

  • Address
  • Control

  • Conditions

  • Weather

  • Date/Time of last rainfall

1.0 Pre-audit

  • Photo of entire asset & surroundings

  • Asset function

  • Asset Function: (a general description)
    - location
    - catchment
    - key features eg, concrete apron to assist in sediment removal
    - predominant plant species (if present)
    - depth
    - current condition

  • Type of catchment

  • Type of catchment:
    eg. pavement only, grassed, garden beds, residential, industrial, other

  • Previous inspections

3.0 Structural

3.1 Inlet

  • Can the inlet be located?

  • Include number of inlets, and photographs of each one

  • Is the structure obstructed or blocked?

  • Input photos and free text details. If multiple inlets are present, record % blockage of worst case.

  • % blockage (100% = completely blocked)

3.2 Outlet

  • Can the outlet be located?

  • Description of outlet (Is outlet pipe submerged? What style of flow control is used? Is the outlet accessible?)

  • Is the structure obstructed or blocked?

  • Input photos and details

  • % blockage

  • Is an underdrain visible?

  • Input details and photos of underdrain

3.3 Overflow

  • Can the overflow/bypass be located?

  • Include overflow description and design/maintenance observations

  • Is the structure obstructed or blocked?

  • Input photos and free text details

  • % blockage

3.4 Access

  • Is vehicle access clearly available to the asset and structures?

3.5 Other Structures

  • Other structures to record?

  • Input component name under details

  • is the structure obstructed or blocked?

  • Input photos and free text details

  • % blockage

4.0 Basin

4.1 Surface Conditions

  • Gross pollutants

  • Add description of pollutants

  • Gross pollutants per m2

4.2 Erosion

  • Erosion of batter slope?

  • Is there erosion near civil structures?

  • Erosion of base? (eg. preferential flows)

4.3 Vegetation

  • Are there any plants/trees present on embankment?

  • Include details of plants and locations

  • % coverage

  • Are there plants/trees present on base?

  • Include details of plants and locations

  • % coverage

  • Does the grass show signs of maintenance?

  • - turf cover >90%
    - grass has been mowed

5.0 Rapid Assessment

5.1 Initial assessment

  • Health and Safety issues

  • Are there any elements or issues that the assessors consider to be a risk to health and safety? Please provide a full description

  • Planned maintenance tasks

  • Corrective maintenance tasks

  • Initial outcome

5.2 Final notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.