Title Page

  • The purpose of the day’s inspections at the above listed sites was to ascertain if the scaffolds erected have been constructed in accordance with any bespoke designs available, BSEN12811 (TG20 – compliance sheets) and any manufacturer’s guidance where relevant.
    Other guidance used for this inspection is SG4 ‘Preventing Falls in Scaffolding’, TG4 ‘Anchorage Systems for Scaffolding’ and other relevant NASC guidance documentation. In addition, compliance with the Work at Height Regulations and The Health and Safety at Work Act 1974.

  • Client - Mattison Scaffolding LTD

  • Mattison Scaffolding Division

  • Site Name/Address

  • Location of Scaffolding

  • Location of Site Offices

  • Date and Time Inspection Report Created - (exact start time in photos)

  • Inspectors Name

  • Were Sub-Contractors on Site at the time of the Inspection

Site Specific Documents

  • Is a bespoke design configuration applicable to the scaffolds constructed on site?

  • Do all completed/handed over design scaffolds have a "Working Design"

  • Are all designed scaffolds erected in accordance with the supplied design drawings?

  • Is TG20 applicable to the scaffolds constructed on-site?

  • Have compliance sheets been issued to site?

  • Are all scaffold's erected in accordance with the supplied TG20 compliance sheets

  • Are any system scaffolds constructed on site?

  • Is the system scaffold erected in accordance with the system manufacturers instructions

  • Has Anchor Testing been undertaken in accordance with TG4 and certificates been completed?

  • Are 'Scafftags' in use on-site?

Scaffold Inspection

    Scaffold
  • Description of the Scaffold Being Inspected

  • Observations: -
  • Details of any matters identified that could give rise to a risk to the health or safety of any of person.

  • Action

  • Category Item Raised

  • Inspection Summary

Report Sign Off

  • All NASC Safety Guidance documents are available to download from here https://nasc.org.uk/shop/

  • If applicable and where design engineers confirmation has been requested, please store all relevant information (Engineers design confirmation) with the site file

  • Additional comments/notes (If Applicable)

  • Disclaimer - The inspector(s) believe the information contained within this report to be correct at the time of the visit. The report is based on matters which were observed or came to the attention of the inspector(s) during the assessment and should not be replied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

  • Inspection report completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.