Title Page

  • Conducted on

  • Prepared by

  • Select Program

  • Station name

  • Verify headers refer to current revision level

  • Verify core team members are correct in the header

  • Ensure any Stop Light and QH points are called out on the Control Plan

  • Note the items missing

  • Verify the Error Proofing Matrix (PR ENG SF 009) shows primary and secondary controls and matches the Control Plan

  • Provide details about the nonconformance

  • Verify the torque values in the Torque Matrix match the Control Plan

  • Note the discrepancies

  • Observe the station and note all failure modes for the operation

  • Compare the list of failure modes to the failure modes listed on the PFMEA, if any are missing add an action item and assign it to the Process Engineer for the program

  • Missing failure modes

  • Ensure customer quality issues from the past 6 months are addressed on both documents (I-Quality-Customer Performance-Customer Performance Sheet for Current Month - NCT Details Tab)

  • Ensure the occurrence rate is accurate for the issues in the previous question

  • Correct occurrence rate

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.