Title Page

  • Document No.

  • RIC Roof Inspection

  • Client / Site

  • Conducted on

  • Location
  • Inspection By

  • Report Prepared by

  • Building Reference
  • Is Building Accessible to Inspect Roof

Audit Information

  • Roof is free of loose material

  • All Access points from roof are complete?

  • All openings from roof into building are sealed against water

  • All roof cladding panels are secured against wind

  • All Scaffolding Boards are secured against wind

  • Is there complete edge protection on roof to protect against wind

  • The roof is free from other light rubbish or debris

  • General Construction Waste

  • Plastic Waste

  • Wood Waste

  • General Rubbish

Closeout

  • Building roof appears to be complete

  • The roof is safe

  • Fire Stairwells at roof level are complete, (No Evidence of Daylight)

  • Picture 1

  • Picture 2

  • Picture 3

  • Picture 4

  • Picture 5

  • Picture 6

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.