Information
-
Site ID
-
Conducted on
-
Risk Assessment Lead
-
Team Members (limit of 4 additional employees)
- Hazard Analysis
-
Department
-
Process
-
Task
(1). Crushing/Pinching
-
Is there risk of the load (e.g., material/equipment/vehicle, etc.) falling, rolling, shifting or collapsing?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there the potential for lack of capacity/control for the load to be slowed, stopped or immobilized?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there the potential for the load come into uncontrolled contact with moving parts of the facility operations during testing, inspection, use, maintenance, cleaning or repair?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there potential for material/equipment or a individual to fall/be thrown off or under the load?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a potential for an individual to be trapped between the load and materials or fixed structures?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(2). Entanglement
-
Is there a risk of body parts, clothing, equipment, or other materials coming into contact with moving parts of the plant causing entanglement?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(3). Cutting, Stabbing and Puncturing
-
Is there a risk of an individual coming into contact with sharp or flying objects?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a risk of an individual coming into contact with moving parts of the load or other equipment/structures during testing, inspection, operation, maintenance, cleaning or repair during the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there risk of the load (e.g., material/equipment/vehicle, etc.) falling, rolling, shifting or collapsing?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(4). Shearing / Burning / Friction
-
Is there the risk of an individual's body or clothing to be abraded or burned while performing the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there risk of an individual's body or clothing to be cut or sheared in performing the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(5). Striking
-
Is there a risk of an individual being struck by uncontrolled or unexpected movement of the load or structure during performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(6). High Pressure Fluids/Gases
-
Is an individual at risk of coming into contact with high pressure fluids or gasses while performing the task?
-
Describe the hazard specific to the task
-
Who is at risk?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(7). Electrical
-
Does the risk exist that the load could contact live electrical conductors during performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there risk that an individual or the load will encounter electrical leads on the ground?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there risk of water to contact electrical equipment during performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there the risk of overloading of electrical circuits during performance of the task? <br>
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(8). Chemical
-
Is there a risk of an individual being exposed to hazardous gasses, vapors, liquids, solids, powders/dusts during performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
-
Is/are product Safety Data Sheet(s) available and immediately accessible?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(9). Slips, Trips or Falls
-
Is there a risk of an individual encountering uneven, cluttered, or slippery work surfaces during performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a risk of obstacles being placed in the proximity an individual driving a vehicle or managing a moving load as associated with this task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a risk of an individual performing this task working at height in an uncontrolled manner (e.g., no individual or systemic fall prevention/control devices or procedures in place)?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(10). Ergonomic
-
Does performance of the task or use of associated equipment involve repetitive or sustained postures?
-
Describe the hazards specific to the task?
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Does performance of the task or use of associated equipment involve high force or jerking actions?
-
Describe the hazards specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Has there been a report of musculoskeletal disorder associated with the task?
-
Describe the hazards specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Does this task require employees to be working with their hands above their shoulder?
-
Describe the hazards specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazards specific to the task
-
Who is at risk?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(11). Suffocation/Asphyxiation
-
Is there a risk of an individual encountering a suffocating or asphyxiating environment during routine performance of the task?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a risk to an individual performing the task of being exposed to a suffocating/asphyxiating environment due to a release of hazardous materials?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(12). Temperature
-
Is there a risk of an individual performing this task coming into contact with objects at temperatures high/low enough to cause discomfort or injury?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is there a risk of an individual performing this task entering an environment with temperatures high/low enough to cause discomfort or injury?
-
Describe the hazard specific to the task
-
Who is at risk?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other factors?
-
Describe the hazard specific to the task
-
Who is at risk?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(13). Light
-
Is the lighting in the area adequate for an individual to perform the task in a safe and efficient manner?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Is the lighting excessive or have complaints been made about the lighting in the task area being too bright?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(14). Noise
-
Has the noise in the area while performing the task been judged to be too loud, excessive, or painful?
-
Describe the hazard specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
-
What is the source of the noise?
-
Has a noise survey been performed in this area?
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
(15). Other Hazards
-
Are there hazardous conditions other than above mentioned categories including:
-
Is there a risk of fires or explosions due to flammable liquids or gasses associated with or on proximity to the area where the task is performed?
-
Describe the hazards specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
-
Other
-
Describe the hazards specific to the task
-
Who is at risk?
- Driver
- Technician
- Laborer
- Supervisor
- Visitor
RISK WEIGHTING/CONTROLS/CORRECTIVE MEASURES
CONSEQUENCE ANALYSIS
-
What is the most probable result of an incident involving this task hazard?
- major disruption of operations and/or fatalities
- minor disruption of operations and/or injuries/first aid
- disruption of process/task and/or near miss
-
How frequently are employees exposed to the hazard?
- Continuously
- Multiple times per day
- Once per day
- Once per week
- Once per month
- Rarely
-
Likelihood of occurrence
-
Risk Score
CONSEQUENCE X EXPOSURE X PROBABILITY = RISK SCORE
RISK SCORE DEFINITION ACTION
-
500 Very high risk Immediate action required. HIGH PRIORITY.
-
300- 499 High risk Management attention needed. Hazards NOT adequately controlled.
-
150- 299 Substantial risk Management attention needed. Hazards NOT adequately controlled.
-
60- 149 Moderate risk Hazard must be examined against current standards
-
0- 59 Low risk Manage by routine procedures.
RISK CONTROLS EVALUATION
Elimination
-
Is it possible to eliminate the risk?
-
Describe means to entirely eliminate the risk
Reduction
-
Is it possible to reduce the level of risk posed by the hazard using substitution?
- Yes
- No
-
Describe the means of risk reduction by substitution
-
Is it possible to reduce the level of risk posed by isolation?
-
Describe the means of risk reduction using isolation
-
Is it possible to reduce the level of risk posed by using engineering controls?
-
Describe the means of risk reduction using engineering controls
Administrative Controls
-
Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, requiring additional training, additional oversight/supervision, or providing information?
-
Describe the means of risk reduction using administrative controls
4. Personal Protection
-
Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment/clothing?
-
Describe the means of risk reduction using personal protective equipment
CORRECTIVE MEASURES
Risk Control Action Plan Risk 1
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 2
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 3
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 4
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 5
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 6
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 7
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 8
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 9
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Risk Control Action Plan Risk 10
-
Completed by date/time
-
Responsibility
- Health and Safety Department
- Maintenance
- Blending
- Production
- Warehouse
- Brewhouse
- Line Managers
- Manager
- Contractor,
-
Issue identified. Comment on progress/update for actions
Process Sign-off
Risk Assessment Team
-
Team Lead Signature
-
Team Member Signature
-
Team Member Signature
-
Team Member Signature
-
Team Member Signature
Facility Leadership
-
Facility Leader Signature