Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Risk Matrix

    IMG_3980.jpeg.jpg

Site Risk Assessment

  • Does team have all required PPEs to complete Job safely?

  • Does team have relevant training ticket and qualification to carry out the job? (Streetwork / PIA trainings)

  • Is team is fully equipped with required tools?

  • Is there stud detector available on with team?

  • Do you have enough gate guards to guard worksite / pole / chamber properly?

Overhead work

  • Have you checked pole label and conducted hammer test?

  • Is ladder tied with pole properly?

  • Harness and lanyards are in good condition? Without any wear and tear/ damage?

COSHH Assessment

  • Is there fully stocked first aid box available on site ?

  • Portable fire extinguisher available ?

  • Is Working GDU available for Hazardous gas testing before operating in BT Chamber ?

  • Are there SDS (Safety Data Sheets available on site) ? For fibre cleaning chemical.

  • Does team have fibre bin available to ensure safe disposal of fiber shards?

  • Have you taken pedestrians and road users safety into account?

  • Have you assessed all potential hazards and have adequate safety control measures in place to complete the job safely?

  • Sign and submit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.