Title Page
-
Site
-
Apartment Number
-
Work Completed By
- Pete Joyce
- Branden Clarke
- Chris Pennington
- Gareth Morris
- Ryan Scythe
- Brad Heywood
- Craig Sunter
- Dom Cotton
-
Conducted on
-
Prepared by
-
Comments / Issues
-
RNM Supervisor Signature
Clashes & Issues
-
Any Clashes or Issues
-
Issues Detailed
-
Photo Evidence
2nd Fix Checklist
-
All circuits fully 2nd fixed, nothing missing & checked with drawing.
-
All appliances connected
-
Smoke & heat alarm interconnection tested
-
All lights switching correctly ie: 2-ways & correct arrangements
-
Fan working & boosting from every applicable point (Boost only)
-
All lamps, lights fitted and flush with ceiling
-
All blanks fitted & labelled where necessary
-
All accessories level & flush
-
Heater and tower rads securely fixed
-
Consumer unit labelled up correctly
-
Apartment Drawings
-
Apartment Photos