Title Page
-
Automaticly Generated Document No.
-
Cabinet No.
-
Conducted on
-
Prepared by
-
Personnel
-
Location
Battery Test
-
1. Discharge test battery for 10 minutes
-
2. Check for corrosion
-
Battery Test Completion Photo
Devices: RCB RM Activities: Enclosure, RCB base, Cleaning, Labels
-
1. Inspect and confirm suitable Site Access.
-
3. Inspect enclosure (RCB/ PMC) condition. Check Decal condition, paintwork condition, frame condition, presence<br>of graffiti or physical damage. Remove all bill posters, cobwebs, road grime, adhesives, chewing gum etc.
-
4.Inspect and ensure that the interior of cabinet is clean and free from ingress of rodents, insects or other pests or<br>foreign materials and apply pesticides.
-
5. Inspect base of the cabinet. Check for resin seal defects and other defects.
-
6. Inspect enclosure doors/locks. Ensure enclosure is secure and waterproof, locks and hinges lubricated and<br>operational.
Device: Fibre Optic Network RM Activities: Check all patch cables, pigtails, patch panels, connectors and termination boxes.
-
1. Inspect for loose connections on all accessible terminals, re‐terminate and tighten if required. <br>Make sure that all cables are in clean and tidy condition.<br><br>
-
2. Ensure all termination boxes are free of dust and moisture. <br>Manufacturers’ IP rate must be maintained under any circumstances.
-
3. Inspect and ensure all fibre optic harnesses are well supported and are not kinked or bent.
Device: Cables RM Activities: Check Copper Cables
-
1.Check and ensure all data cables have strain relief and are secure to equipment.
-
2. Check and ensure all power and data cables have no corrosion, are securely fastened in terminal blocks.<br> Inspect and ensure all connectors are firmly in sockets and all wires are firmly in each connector.
-
4. Check and ensure asset and cable labels are in place.
Device Ramp Signaling Contreoller
-
1. Inspect the device and mounting.
-
2. Inspect the mains connection (Power supply)
-
3. Check and ensure cable labels are in place.
Device Power Over Ethernet
-
1. Inspect for damage, corrosion, cable management and loose wiring connections.
-
2. Inspect the device and mounting.
-
3. Inspect the mains connection (Power supply)
-
4. Check and ensure cable labels are in place.
Device: Media converters
-
1. Inspect for damage, corrosion, cable management and loose wiring connections.
-
2. Inspect the device and mounting.
-
3. Inspect the mains connection (Power supply)
-
4. Check and ensure cable labels are in place.
Device: Field Processor and Sign Controllers RM Activities: Check the mounting and connections
-
1. Inspect for damaged and loose wiring connections.
-
2. Inspect the FP and Controllers mounting.<br>
-
3. Inspect the mains connection ( Power supply)
-
8. Inspect and ensure all labels are in place and secure i.e cabinet label, cable identification label.
Device: ASW Cisco IE3000 and expansion modules. RM Activity: Check the mounting and connections
-
1. Inspect for damage, corrosion, cable management and loose wiring connections.
-
2. Inspect the device and mounting.
-
3. Inspect the mains connection (Power supply)
Device: CCTV Encoder RM Activities: Check the mounting and connections
-
1. Inspect for damaged and loose wiring connections.<br><br>
-
2. Inspect the encoder mounting.
-
3. Inspect the mains connection ( Power supply)
-
2. Check earth connections and make sure it has the required impedance (O.5ohm or less), not loose and in good condition.<br>Note: Internal Switchboard check requires qualfied A Grade electican
-
7. Perform Electrical checks. Check and test RCDs as per AS 3760 (only if there is a spare GPO).<br>Note: Ensure testing equipment is calibrated
RCB PMC Power
-
3. Check and ensure all 240 volt power cables are Secured in place.
-
4. Check and ensure cable labels are in place.
-
9. Inspect and ensure that all Hazard Labels are in place and secure.
-
Add signature
-
Select date
-
QA Completion Photo