Title Page

  • Automaticly Generated Document No.

  • Cabinet No.

  • Conducted on

  • Prepared by

  • Personnel

  • Location

Battery Test

  • 1. Discharge test battery for 10 minutes

  • 2. Check for corrosion

  • Battery Test Completion Photo

Devices: RCB RM Activities: Enclosure, RCB base, Cleaning, Labels

  • 1. Inspect and confirm suitable Site Access.

  • 3. Inspect enclosure (RCB/ PMC) condition. Check Decal condition, paintwork condition, frame condition, presence<br>of graffiti or physical damage. Remove all bill posters, cobwebs, road grime, adhesives, chewing gum etc.

  • 4.Inspect and ensure that the interior of cabinet is clean and free from ingress of rodents, insects or other pests or<br>foreign materials and apply pesticides.

  • 5. Inspect base of the cabinet. Check for resin seal defects and other defects.

  • 6. Inspect enclosure doors/locks. Ensure enclosure is secure and waterproof, locks and hinges lubricated and<br>operational.

Device: Fibre Optic Network RM Activities: Check all patch cables, pigtails, patch panels, connectors and termination boxes.

  • 1. Inspect for loose connections on all accessible terminals, re‐terminate and tighten if required. <br>Make sure that all cables are in clean and tidy condition.<br><br>

  • 2. Ensure all termination boxes are free of dust and moisture. <br>Manufacturers’ IP rate must be maintained under any circumstances.

  • 3. Inspect and ensure all fibre optic harnesses are well supported and are not kinked or bent.

Device: Cables RM Activities: Check Copper Cables

  • 1.Check and ensure all data cables have strain relief and are secure to equipment.

  • 2. Check and ensure all power and data cables have no corrosion, are securely fastened in terminal blocks.<br> Inspect and ensure all connectors are firmly in sockets and all wires are firmly in each connector.

  • 4. Check and ensure asset and cable labels are in place.

Device Ramp Signaling Contreoller

  • 1. Inspect the device and mounting.

  • 2. Inspect the mains connection (Power supply)

  • 3. Check and ensure cable labels are in place.

Device Power Over Ethernet

  • 1. Inspect for damage, corrosion, cable management and loose wiring connections.

  • 2. Inspect the device and mounting.

  • 3. Inspect the mains connection (Power supply)

  • 4. Check and ensure cable labels are in place.

Device: Media converters

  • 1. Inspect for damage, corrosion, cable management and loose wiring connections.

  • 2. Inspect the device and mounting.

  • 3. Inspect the mains connection (Power supply)

  • 4. Check and ensure cable labels are in place.

Device: Field Processor and Sign Controllers RM Activities: Check the mounting and connections

  • 1. Inspect for damaged and loose wiring connections.

  • 2. Inspect the FP and Controllers mounting.<br>

  • 3. Inspect the mains connection ( Power supply)

  • 8. Inspect and ensure all labels are in place and secure i.e cabinet label, cable identification label.

Device: ASW Cisco IE3000 and expansion modules. RM Activity: Check the mounting and connections

  • 1. Inspect for damage, corrosion, cable management and loose wiring connections.

  • 2. Inspect the device and mounting.

  • 3. Inspect the mains connection (Power supply)

Device: CCTV Encoder RM Activities: Check the mounting and connections

  • 1. Inspect for damaged and loose wiring connections.<br><br>

  • 2. Inspect the encoder mounting.

  • 3. Inspect the mains connection ( Power supply)

  • 2. Check earth connections and make sure it has the required impedance (O.5ohm or less), not loose and in good condition.<br>Note: Internal Switchboard check requires qualfied A Grade electican

  • 7. Perform Electrical checks. Check and test RCDs as per AS 3760 (only if there is a spare GPO).<br>Note: Ensure testing equipment is calibrated

RCB PMC Power

  • 3. Check and ensure all 240 volt power cables are Secured in place.

  • 4. Check and ensure cable labels are in place.

  • 9. Inspect and ensure that all Hazard Labels are in place and secure.

  • Add signature

  • Select date

  • QA Completion Photo

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.