Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Information
-
Project #
-
Pour# & Location
-
Scheduled Pour Date
-
Date Checked
Concrete Specifications
-
Mix #
-
PSI
-
Slump
-
Finish Type
-
Curing Method
-
Method of Placement
Formwork
-
Are forms on proper location (grade and alignment)?
-
Date Corrected (If No)
-
Have Forms been braced and installed with any acceptable shop plans?
-
Date Corrected (If No)
-
Are forms clean and free of derby?
-
Date Corrected (If No)
Reinforcing
-
Is all reinforcing steel clean (free of rust scale, reals in epoxy or galvanized coating)?
-
Date Corrected (If No)
-
Has the reinforcing steel been placed as per contract documents?
-
Date Corrected (If No)
-
Is there proper clearance, as specified in contract documents, between reinforcing steel and formwork?
-
Date Corrected (If No)
-
Has reinforcing steel been tied and supported (chairs) as per contract documents?
-
Date Corrected (If No)
Post-Tension
-
Have all the exposed strands been properly taped and protected?
-
Date Corrected (If No)
-
Has all post-tension been placed correctly as per approved shop drawings (group count, color,drape)?
-
Date corrected (If No)
-
Does all post-tension meet the specified cover?
-
Date Corrected (If No)
-
Is post-tension properly supported as called out in approved shop drawings (reinforcing, chairs, tendon)?
-
Date Corrected (If No)
-
Have all post-tension heads been properly nailed to formwork (flush to prevent concrete from seeping in)?
-
Date Corrected (If No)
Set-Ins
-
Have all embed plates been installed correctly as per contract documents (type, location, elevation)?
-
Have all dowel bars been installed correctly as per contract documents (bar size, location)?
-
Have all sleeves been installed correctly as per contract documents (drains, pipe sleeves)?
Set up Verification - Have the follow personnel been set up
-
Lab Engineer
-
Concrete supplier
-
Concrete Pumping Company
-
Finishers
-
City Inspector
Sign-offs - Have the following personnel inspected and approved the pour
-
Testing Lab
-
Engineer of Record
-
R-O Superintendent
-
R-O Quality Manager