Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General Information

  • Project #

  • Pour# & Location

  • Scheduled Pour Date

  • Date Checked

Concrete Specifications

  • Mix #

  • PSI

  • Slump

  • Finish Type

  • Curing Method

  • Method of Placement

Formwork

  • Are forms on proper location (grade and alignment)?

  • Date Corrected (If No)

  • Have Forms been braced and installed with any acceptable shop plans?

  • Date Corrected (If No)

  • Are forms clean and free of derby?

  • Date Corrected (If No)

Reinforcing

  • Is all reinforcing steel clean (free of rust scale, reals in epoxy or galvanized coating)?

  • Date Corrected (If No)

  • Has the reinforcing steel been placed as per contract documents?

  • Date Corrected (If No)

  • Is there proper clearance, as specified in contract documents, between reinforcing steel and formwork?

  • Date Corrected (If No)

  • Has reinforcing steel been tied and supported (chairs) as per contract documents?

  • Date Corrected (If No)

Post-Tension

  • Have all the exposed strands been properly taped and protected?

  • Date Corrected (If No)

  • Has all post-tension been placed correctly as per approved shop drawings (group count, color,drape)?

  • Date corrected (If No)

  • Does all post-tension meet the specified cover?

  • Date Corrected (If No)

  • Is post-tension properly supported as called out in approved shop drawings (reinforcing, chairs, tendon)?

  • Date Corrected (If No)

  • Have all post-tension heads been properly nailed to formwork (flush to prevent concrete from seeping in)?

  • Date Corrected (If No)

Set-Ins

  • Have all embed plates been installed correctly as per contract documents (type, location, elevation)?

  • Have all dowel bars been installed correctly as per contract documents (bar size, location)?

  • Have all sleeves been installed correctly as per contract documents (drains, pipe sleeves)?

Set up Verification - Have the follow personnel been set up

  • Lab Engineer

  • Concrete supplier

  • Concrete Pumping Company

  • Finishers

  • City Inspector

Sign-offs - Have the following personnel inspected and approved the pour

  • Testing Lab

  • Engineer of Record

  • R-O Superintendent

  • R-O Quality Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.