Title Page
-
Site conducted
-
Conducted on
-
Client- Clients have a major role to play in the promotion of a systematic approach to the management of health and safety in construction. It is vital that sufficient time and resources are allowed to enable the CDM duty holders to carry out their responsibilities safely.
- Engie
- Galliford Try
- HG Construction
- 21st Century
- ARJ Construction
- Real
- Barratt
- McLaren
- Diamond Build
- Potter Raper
- Wates
- 4sq Services
- Other
- Beale Halai
-
The purpose of the Health,Safety Leadership Tour (HSLT) is to ensure the project inspected is safe and remains in a safe condition. The results of any inspection will be notified to the person operating the work (i.e, site manager) within 24 hours of completing the inspection.
-
Location
-
Weather Condition
- Sunny
- Sunny with Light Clouds
- Cloudy
- Light Rain
- Heavy Rain Showers
- Sleet Showers
-
Roofing Supervisor/ Charge Hand - Full Name
-
Type of Work
- Pitched Roofs
- Flat Roofs
- Felt, slate, tiles, liquid
- Cold Roof
- Worm Roof
- Green, Blue, Brown Roof
- Single ply
- Hot melt
- Soffits, Fascia, Gutter/Rainwater pipes
- Paving and decking
- Other
1. Site Conditions
-
Adequate welfare facilities, clean, tidy and maintained?
-
Safe Access and Egress to work areas ?
Embassy Site Supervisor/ Lead Roofer
-
Skillset /CSCS Card
- CSCS- Gold Card -(Advanced)
- CSCS Blue Card-(Skilled Worker)
- CSCS Red Trainee Operative
- CSCS Green Labourer
- Other
-
Client Site Induction records available ?
- Yes
- No
- Client to address highlighted issue with relevant contractor to prevent reoccurrence
- N/A
-
Team on Site
2. Work Environment
-
Has public protection been provided?
-
Adequate segregation and warning safety signage in place ?
-
Is the team working to safety ?
Work at Height- Access and Egress
-
Scaffold structure and access and egress fit for purpose?
- Yes
- No
- Scaffold Erect in Progress- No to be used by other trades
- Scaffold Dismantle in Progress-No to be used by other trades
- Incomplete Scaffolding Structure - Not to be used
-
Scaff Tag fixed by Access Point ?
-
Ladder Access points - ladder guards ,trap doors, access gates in place and fit for purpose ?
-
The ladders fastened correctly ?
-
Edge protection guard rail and toe boards in place?
-
Internal-Edge Protection Guard Rail
-
Sky Lights Roof's-Edge Protection Guard Rail in place ?
-
Leading edge guard rail
4. Housekeeping
-
Are all the spare materials in a neat and tidy condition?
-
Is any ESS waste lying around ?
-
Is the work area is well maintained by its users ?
- Yes
- No
- Client to address highlighted issue with relevant contractor to prevent reoccurrence
- N/A
-
Waste been cleared and removed from site/work areas?
-
Manual Handling/ Lifting Operations Safe System of Work in place ?
5. Documentation
-
5.1 Are the task-specific risk assessment and method statement present on-site?
-
All staff signed our RAMS ?
-
RAMS Staff involvement - Any revisions required by workforce/site team ?
-
Daily Task Briefing done ?
-
Manufactures stage inspections and reports?
-
5.2 Is there a handover certificate/ITP report in place?
-
5.3 Has the previous audit report been closed out?
PPE Compliance
-
Personal Protective Equipment(PPE)- Respiratory Protective Equipment(RPE) being worn by workforce?
Equipment
-
Gin/Wheel/Rope fixed in fit for purpose?
-
Training received for equipment in use ?
- Yes
- No
- Training records available on request
- N/A
-
Hand held and Cordless Power Tools fit for purpose?
6. Sign Off
-
6.1 Name of person completing this report.
-
6.2 Name of the site person receiving this report- I confirm the contents of this report have been discussed with myself and I am aware of any issues highlighted in the body of this report.
Customer Survey
-
Quality of our work ?House
-
ESS staff approach?
-
Housekeeping and waste management?
-
SHEQ compliance ?
-
Any complaint, issues or improvements ?
-
Name and position of the person completing survey
7. Closure
-
7.1 I confirm all actions highlight in this report have been actioned on:
Name of the person closing this report.
-
Add signature