Title Page
-
Project Name
-
Main Contractor
-
Operatives Present
-
Conducted on
-
Prepared by
-
Have the RAMS been issued?
-
Have the operatives on site been inducted?
-
Is there safe access to the roof?
-
Is the main guard rail at least 950mm above the edge? (INDG284)
-
Is the intermediate guard rail no more than 470mm?
-
Are there a sufficient amount of fire extinguishers?
-
Does the scaffold conform with TG20:13 and has it been inspected at regular intervals not exceeding 7 days?
-
What COSHH substances are being used and have they WEL been exceeded?
-
Are there sufficient welfare and first aid facilities present?
-
If there are roof openings has a crash deck or netting been installed to prevent falls?
-
Is access and ingress around the site/roof area safe for operatives?
-
Are toe boards in place?
-
Is a pot being used?
-
Does the pot have a thermostat installed and is it being used correctly?
-
Is plant machinery being stored safety and not disrupting designated walking routes?
-
Are cranes and lifting materials being used safely?
-
Have hand tools been inspected to ensure they are fit for purpose?
-
Is adequate lighting present whilst navigating the site?
-
Is the site housekeeping up to an appropriate standard?
-
Are operatives aware of the correct manual handling procedures?
-
If hand tools are being used, are they 110V or Battery?
-
Are gas bottles being stored safely on site?
-
Are operatives wearing the correct PPE for the task they are completing? (e.g. boiler suits for Structural Hot Melt).
-
Are work practices being carried out safely?
-
Are emergency procedures in place & are Roofline operatives aware of them?
-
If applicable; has a hot works permit been issued?
-
Has the permit covered the principles of hazard evaluation, precaution planning and instructing the supervisor?
-
Have suitable Tool Box Talk’s (TBT’s) been completed?
-
Is a crane being used to lift Roofline materials?
-
Is the crane being operated safely?
-
Comments regarding site visit.
-
Scoring system implemented below.
Scores are as follows:
1-3 = Works stopped
4-6 = Satisfactory, room for improvement
7-9 = Good
10 = Excellent -
Roofline Housekeeping
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Housekeeping on site
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
PPE
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Access around site
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Access to roof level(s)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Welfare facilities
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Control of permits
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Emergency procedures displayed and understood
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Roofline safety performance
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Site safety
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
30% or below = Works stopped
31-69% Room for improvement
70-99% Good
100% Excellent
OVERALL % SCORE DISPLAYED ON FRONT SHEET OF AUDIT