Information

  • Document No.

  • Main Contractor

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel - Number of Operatives and Name of Supervisor

  • Roof Area

  • Percentage Complete

  • Weather Conditions

  • Supporting Photos

Project Details

  • Project Status

  • Project Type

  • Specification/Manufacturer

Membrane/System

  • Membrane/System

  • Vapour Control

Insulation

  • Type

  • Thickness

  • Attachment

Inspection Checklist

Inspection Checklist

  • Storage/Materials Condition

  • Comments/Action Required

  • Add media

  • Copy of Roof Design/Spec.

  • Comments/Action Required

  • Add media

  • Deck or Existing Roof Condition

  • Comments/Action Required

  • Add media

  • Vapour Barrier

  • Comments/Action Required

  • Add media

  • Insulation/Separation Layer

  • Comments/Action Required

  • Add media

  • Membrane Layout

  • Comments/Action Required

  • Add media

  • Fasteners

  • Comments/Action Required

  • Add media

  • Tooling Used

  • Comments/Action Required

  • Add media

  • Welding

  • Comments/Action Required

  • Add media

  • Test Log

  • Comments/Action Required

  • Add media

  • Perimeter Detailing

  • Comments/Action Required

  • Add media

  • Trims

  • Comments/Action Required

  • Add media

  • Edge Termination

  • Comments/Action Required

  • Add media

  • Rain Water Outlets

  • Comments/Action Required

  • Add media

  • Gutters

  • Comments/Action Required

  • Add media

  • Pipe Details

  • Comments/Action Required

  • Add media

  • Corners

  • Comments/Action Required

  • Add media

  • Roof Lights/Vents

  • Comments/Action Required

  • Add media

  • Expansion Joints

  • Comments/Action Required

  • Add media

  • Walkway

  • Comments/Action Required

  • Add media

  • Pavers/Ballast

  • Comments/Action Required

  • Add media

  • Lightening Clips

  • Comments/Action Required

  • Add media

  • Architectural Profiles

  • Comments/Action Required

  • Add media

  • Contamination

  • Comments/Action Required

  • Add media

  • Damage

  • Comments/Action Required

  • Add media

  • Roof Tidiness

  • Comments/Action Required

  • Add media

  • Lifeline/Ladders

  • Comments/Action Required

  • Add media

  • Sedum Matting Quality

  • Comments/Action Required

  • Add media

  • Perimeter Stone Borders

  • Comments/Action Required

  • Add media

  • MinK/Goetextile Fleece Layer

  • Comments/Action Required

  • Add media

  • Outlet Inspection Chambers

  • Comments/Action Required

  • Add media

  • Soil Thickness

  • Comments/Action Required

  • Add media

  • Roof to Acceptable Standards

  • Comments/Action Required

  • Add media

Sign Off

Roofline Personnel are Responsible for carrying out a visual inspection of the Roofing System and to provide advice and technical support to the Main Contractor.

  • Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.