Title Page

  • Company

  • Main contractor

  • Project name

  • Project status

  • Conducted on

  • Prepared by

  • Location
  • Number of personnel on site

  • Name(s) of operative/supervisor

  • Weather conditions

Site Specification

  • Waterproofing specification (select multiple if applicable)

  • Manufacturer

  • Project type

  • Name of waterproofing system

Inspection Checklist

  • Are there multiple roof areas?

  • Name of first roof area(s)

  • Vapour control

  • Type of insulation system

  • Thickness of insulation

  • Toolbox talk completed (photo required)

  • Storage/Materials condition

  • Copy of roof design/specification

  • Deck or existing roof condition

  • Vapour barrier

  • Is the surface clear of debris before priming?

  • Insulation/Seperation layer

  • Membrane layout

  • Fasteners

  • Tooling used

  • Welding

  • Test log

  • Perimeter detailing

  • Trims

  • Edge termination

  • Rainwater outlets

  • Gutters

  • Pipe details

  • Corners

  • Roof lights/vents

  • Expansion joints

  • Walkway

  • Paving/ballast

  • Lightning clips

  • Architectural profiles

  • Contamination

  • Damage

  • Roof tidiness

  • Lifeline/Ladders

  • Sedum matting quality

  • Perimeter stone borders

  • MinK/Geotextile fleece layer

  • Inspection chambers

  • Soil thickness

  • Any other items to note?

  • Is the roof to acceptable standards?

  • Name of second roof area(s)

  • Vapour control

  • Type of insulation system

  • Thickness of insulation

  • Toolbox talk completed (photo required)

  • Storage/Materials condition

  • Copy of roof design/specification

  • Deck or existing roof condition

  • Vapour barrier

  • Is the surface clear of debris before priming?

  • Insulation/Seperation layer

  • Membrane layout

  • Fasteners

  • Tooling used

  • Welding

  • Test log

  • Perimeter detailing

  • Trims

  • Edge termination

  • Rainwater outlets

  • Gutters

  • Pipe details

  • Corners

  • Roof lights/vents

  • Expansion joints

  • Walkway

  • Paving/ballast

  • Lightning clips

  • Architectural profiles

  • Contamination

  • Damage

  • Roof tidiness

  • Lifeline/Ladders

  • Sedum matting quality

  • Perimeter stone borders

  • MinK/Geotextile fleece layer

  • Inspection chambers

  • Soil thickness

  • Is the roof to acceptable standards?

  • is there another roof area?

  • Vapour control

  • Type of insulation system

  • Thickness of insulation

  • Toolbox talk completed (photo required)

  • Storage/Materials condition

  • Copy of roof design/specification

  • Deck or existing roof condition

  • Vapour barrier

  • Is the surface clear of debris before priming?

  • Insulation/Seperation layer

  • Membrane layout

  • Fasteners

  • Tooling used

  • Welding

  • Test log

  • Perimeter detailing

  • Trims

  • Edge termination

  • Rainwater outlets

  • Gutters

  • Pipe details

  • Corners

  • Roof lights/vents

  • Expansion joints

  • Walkway

  • Paving/ballast

  • Lightning clips

  • Architectural profiles

  • Contamination

  • Damage

  • Roof tidiness

  • Lifeline/Ladders

  • Sedum matting quality

  • Perimeter stone borders

  • MinK/Geotextile fleece layer

  • Inspection chambers

  • Soil thickness

  • Is the roof to acceptable standards?

  • Vapour control

  • Type of insulation system

  • Thickness of insulation

  • Toolbox talk completed (photo required)

  • Storage/Materials condition

  • Copy of roof design/specification

  • Deck or existing roof condition

  • Vapour barrier

  • Is the surface clear of debris before priming?

  • Insulation/Seperation layer

  • Membrane layout

  • Fasteners

  • Tooling used

  • Welding

  • Test log

  • Perimeter detailing

  • Trims

  • Edge termination

  • Rainwater outlets

  • Gutters

  • Pipe details

  • Corners

  • Roof lights/vents

  • Expansion joints

  • Walkway

  • Paving/ballast

  • Lightning clips

  • Architectural profiles

  • Contamination

  • Damage

  • Roof tidiness

  • Lifeline/Ladders

  • Sedum matting quality

  • Perimeter stone borders

  • MinK/Geotextile fleece layer

  • Inspection chambers

  • Soil thickness

  • Is the roof to acceptable standards?

Variations

  • Are there any variations being worked on?

  • Brief description of the work

  • Has a site instruction been recieved?

  • Supporting documentation (photographs/timesheets)

Materials on site

  • Are there any materials being stored on site?

Final Sign Off

  • Has the roof area(s) been installed to the manufacturers recomendations?

  • Has the roof area(s) been installed to Roofline's standards?

Roofline Personnel are Responsible for carrying out a visual inspection of the Roofing System and to provide advice and technical support to the Main Contractor.

  • Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.