Information
-
Document No.
-
Main Contractor
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel - Number of Operatives and Name of Supervisor
-
Roof Area
-
Weather Conditions
-
Supporting Photos
Project Details
-
Project Status
-
Project Type
-
Specification/Manufacturer
- Soprema
- Siltec Felt
- Siltec Single Ply
- Flag
- Westwood
- IKO Hot Melt
- IKO Torch-on
- IKO Single Ply
- Soprema Liquid
- IKO Liquid
- Green Roof
- Silflex F1 Liquid
Membrane/System
-
Membrane/System
- Felt
- Duratech
- Duoflex
- Single Ply
- IKO Permatec
- Liquid
- Lifeline
-
Vapour Control
Insulation
-
Type
-
Thickness
-
Attachment
Inspection Checklist
Inspection Checklist
-
Toolbox Talk Completed (Photo Required)
-
Storage/Materials Condition
-
Comments/Action Required
-
Add media
-
Copy of Roof Design/Spec.
-
Comments/Action Required
-
Add media
-
Deck or Existing Roof Condition
-
Comments/Action Required
-
Add media
-
Vapour Barrier
-
Comments/Action Required
-
Add media
-
Insulation/Separation Layer
-
Comments/Action Required
-
Add media
-
Membrane Layout
-
Comments/Action Required
-
Add media
-
Fasteners
-
Comments/Action Required
-
Add media
-
Tooling Used
-
Comments/Action Required
-
Add media
-
Welding
-
Comments/Action Required
-
Add media
-
Test Log
-
Comments/Action Required
-
Add media
-
Perimeter Detailing
-
Comments/Action Required
-
Add media
-
Trims
-
Comments/Action Required
-
Add media
-
Edge Termination
-
Comments/Action Required
-
Add media
-
Rain Water Outlets
-
Comments/Action Required
-
Add media
-
Gutters
-
Comments/Action Required
-
Add media
-
Pipe Details
-
Comments/Action Required
-
Add media
-
Corners
-
Comments/Action Required
-
Add media
-
Roof Lights/Vents
-
Comments/Action Required
-
Add media
-
Expansion Joints
-
Comments/Action Required
-
Add media
-
Walkway
-
Comments/Action Required
-
Add media
-
Pavers/Ballast
-
Comments/Action Required
-
Add media
-
Lightening Clips
-
Comments/Action Required
-
Add media
-
Architectural Profiles
-
Comments/Action Required
-
Add media
-
Contamination
-
Comments/Action Required
-
Add media
-
Damage
-
Comments/Action Required
-
Add media
-
Roof Tidiness
-
Comments/Action Required
-
Add media
-
Lifeline/Ladders
-
Comments/Action Required
-
Add media
-
Sedum Matting Quality
-
Comments/Action Required
-
Add media
-
Perimeter Stone Borders
-
Comments/Action Required
-
Add media
-
MinK/Goetextile Fleece Layer
-
Comments/Action Required
-
Add media
-
Outlet Inspection Chambers
-
Comments/Action Required
-
Add media
-
Soil Thickness
-
Comments/Action Required
-
Add media
-
Roof to Acceptable Standards
-
Comments/Action Required
-
Add media
-
Are there any additional variations?
-
Please provide any pictures of area/variation
-
Please provide description of work (if V/O complete - please provide the materials/labour hours used).
Sign Off
Roofline Personnel are Responsible for carrying out a visual inspection of the Roofing System and to provide advice and technical support to the Main Contractor.
-
Signed