Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Previous Audit
-
1.1 - Has the last audit been reviewed?
-
1.2 - Are there no outstanding actions?
2.0 - Gateway Documentation
-
2.1 - Has the Critical Parts Checklist been completed? For ROV<br>
-
2.1.1 For TMS?
-
2.1.2 For Control Cabin?
-
2.2 - Has the Build Amendments Log been completed? For ROV
-
2.2.1 for TMS?
-
2.2.2 for Control Cabin
-
2.3 - Has the Movement Log been completed? For ROV?
-
2.3.1 for TMS?
-
2.3.2 for Control Cabin?
-
2.4 - Has the Serial number Log been completed? For ROV?
-
2.4.1 for TMS?
-
2.4.2 for Control Cabin?
-
2.5 - Have the NCR's been recorded? For ROV?
-
2.5.1 for TMS?
-
2.5.2 for Control Cabin?
-
2.6 - Have any other issues been recorded?
-
2.7 - Has the Final Inspection Log been completed? For ROV?
-
2.7.1 for TMS?
-
2.7.2 for Control Cabin?
-
2.8 - Have the Load Out Documents been completed? For ROV?
-
2.8.1 for TMS?
-
2.8.2 for Control Cabin?
-
2.9 Are all documents present?
3.0 - ROV Area
-
3.1 - Are Drawings available?
-
3.2 - Are the drawings the correct rev?
-
3.3 - Have any calibrated tools been used?
-
3.4 - Has the tool used been recorded? Where?
-
3.5 - are there any other issues? Use N/A if no
-
3.6. Have photographs been taken (front/right/left/back as a minimum)?<br>
4.0 - TMS Area
-
4.1 - Are Drawings available?
-
4.2 - Are the drawings the correct rev?
-
4.3 - Have any calibrated tools been used?
-
4.4 - Has the tool used been recorded? Where?
-
4.5 - are there any other issues? Use N/A if no.
-
4.6 Have photographs been taken (front/right/left/back as a minimum)?
5.0 - Control Cabin Area
-
5.1 - Are Drawings available?
-
5.2 - Are the drawings the correct rev?
-
5.3 - Have any calibrated tools been used?
-
5.4 - Has the tool used been recorded? Where?
-
5.5 - are there any other issues? Use N/A if no.
-
3.6. Have photographs been taken (front/right/left/back/internally as a minimum?
6.0 Commissioning Area
-
6.1 - Are Drawings available?
-
6.2 - Are the drawings the correct rev?
-
6.3 - Have any calibrated tools been used?
-
6.4 - Has the tool used been recorded? Where?
-
6.5 - are there any other issues? Use N/A if no.
-
6.6 Have photographs been taken?
7.0- NCR Vis Board
-
7.1 - Are the impact NCR's up to date?
-
7.2 - Are the Daily NCR's up to date?
-
7.3 - Are the month by month NCR's current?
-
7.4 - Are the week by week open and closed graphic current?
8.0 Quarantine Area
-
8.1 Are there any items in the Quarantine Area?
-
8.2 Has the correct procedure been followed for quarantine items?
Media Evidence
-
Have any areas have been photographed/filmed during this audit?
Staff consulted
-
Has any staff been consulted during this audit?
-
Auditor's signature