Title Page
-
Conducted on:
-
Client Name
-
Site / Plot No:
-
Quality checked by:
- Andrew Brown
- Joanne Danielsen
- Paul Nolan
- John Newman
- Vaughn Thomas
- Matt Panks
- RichieTeagle
-
Site Location:
-
House Type:
First Fix Inspection
-
Works being inspected:
-
Installer's Name:
- Arron Butler
- Alex Sweet
- Vaughn Thomas
- Harry Hall
- Thomas Drake
- Chris Stadden
- Garin Jenkins
- Harrison Trinder
- Abbi Powell
- Callum Griffiths
- Luke Owen
- Mike Jones
- Rhys James
- Lewis Price
- Shane Dyer
- Jay Rees
- Richie Teagle
- Ioan Medcraft
- Peter Merridew
- James Fox-Mabe
- George Rauch
- Raki Islam
- Jonathan Maslen
- Matt Phillips
- Matt Panks
- Jarrad Birch
- Sean Forward
- Vikki Jones
- Brad & Simon
- Dean Lewis
- Sharif
-
First Fix Status:
-
Whats Left to install on this First Fix?
-
Is the System installed to Design:
-
Has an as installed Design been completed?
-
Are all the sprinkler heads within rule and giving sufficient cover?
-
In What areas are the Sprinklers out of rule?
- Hallway
- Living Room
- Kitchen
- Utility Room
- Dining Room
- Downstairs Bathroom
- Landing Area
- Master Bedroom
- Bedroom 2
- Bedroom 3
- Bedroom 4
- Bedroom 5
- Upstairs Bathroom
- Attic Bedroom
-
Does all Pipework Looked Professionally Installed?
-
What are the areas of concern?
-
Do all visible Joints looked glued and signed?
-
Are all brackets in place and correctly spaced?
-
Has Foil Tape & Safe Plates been installed?
-
Has engineer been notified to return to site & fit?
-
Has all pipework been lagged that touch other trades pipes / cables?
-
Areas of concern that haven't been lagged?
-
Has Resiriser been installed correctly?
-
issues found with Resiriser?
-
Has the Alkathene been connected to the Resiriser?
-
Have all Joist been drilled in the appropriate locations?
-
Photo:
-
Is the System currently Live?
-
Has the Plot been tested to 10 Bar?
-
Has a pressure test cert been handed in by the engineer?
-
Have all waste materials been removed from the plot?
-
Have the engineers been notified materials were left in the plot?
-
Has there been any Damaged caused to the plot by an RSP Engineer?
-
What Damage was caused?
-
Are there any Remedial works to be carried out?
-
What works need to be carried out:
-
Are there any Health and Safety concerns?
-
Has H & S Manager been informed?
-
FIRST FIX ( PASS / FAIL )
-
Signed By RSP Supervisor / Manager