Information

  • Construction Stage

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Framing Carpenter

External Checks

  • Site Sign in place

  • Check external for frame overhang

  • Check cyclone strap installation

  • Front and rear steel post install including bolts top and bottom

  • Check all window flashings intact and ready for brickwork

Internal Checks

  • Front door frame installed to A&L detail including external clips and locks fitted

  • Garage door reveal linings installed and detailed at base for concrete profile

  • Are windows packed, fixed, level, plumb and operating correctly?

  • Are all bulkheads and reveals straight, level and plumb where square set.

  • Are top plates level & straight? Attention to long rooms.

  • Are corner blocks fitted and fixed correctly?

  • Have compression blocks blocks been installed under high load areas if required.

  • Has all bracing been installed in accordance with bracing plan?

  • Check transfer blocks have been installed as required.

  • Has structural steel or engineered beams been installed as per working drawings/engineering?

  • Are roof trusses installed as per manufacturers specs-true to line, <br>level and plumb and anchored correctly to top plates?

  • Are girder brackets installed correctly and not hanging below bottom chord?

  • Have anti-skid blocks been fitted to saddle trusses?

  • Are all trimming noggings installed for fixing of plaster, towel rails toilet paper holders, garage door and operator

  • Have plaster trimmers been installed at 600mm centres at change of direction?

  • Are tails on trusses set at the correct distance from the wall frame?

  • Has manhole trimming been complete?

  • Ensure tight lintel fit in stud check out so no sag when roof is loaded.

  • Check room sizes, including kitchen and bathrooms to ensure design compliance.

  • Ensure site is left in a neat condition and rubbish placed in bin or cage extra timber and fixings neatly stacked away from entry and walkways, toilet and power supply

Site Issues

  • Check frame inspection is booked or has been completed and no outstanding issues

  • Check site is ready for fascia gutter and roof installation and there are no safety issues or obstructions likely to cause delay

  • Photograph frame including lock numbers and submit frame claim

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.