Front Page
-
Site:
-
Date:
-
Auditor:
-
Location:
Safety & Wellbeing Assurance Check
-
The purpose of this document is to outline items to be considered for the updated S&W assurance check to replace the SMP Implementation Tracker.
-
Risk Compliance checks* = 70% overall score, score 290
Preventative Management-General
-
1. Legal Obligations understood – Team meetings with standing HSE agenda– What is the standard for minimum frequency of meetings? How often are your meetings held?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
2. Progress Notes – Evidence of consistency and quality re details. (Sample – previous week – eg. 3 progress notes per day per 24/7 site) (Have the notes been checked by a manager?)
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
3. Progress notes review policy (HM, DSL and ROM) - What is the review process? Are progress notes reviewed by a manager daily for early identification of issues.
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
4. Written Shift Handover – What is the house policy?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
5. Is there effective communication systems in place? Eg Duress Alarm/Staysafe App/Mobile Phone/Teams Chat (If applicable) – If so, what are the instructions? Has the policy been communicated to staff? (Risk Assessment)
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
6. Lone Worker Policy/Procedure – What policy or controls are in place?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
7. Environmental scan – observations for hazards and non-compliant standards (eg. Broken window, mould, interaction dynamics between staff and client).
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
8. Are the HM and DSL aware of the CNSP and HRRP risk resolution process? Are the terms of reference accessible in the HSE folder or online?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
9. When was the last time a manager visited the home
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
Occupational Violence- Client Related ( Mental Stress)
-
10. Has the client got a PBSP and/ or ICSP & date of expiry – Is it up to date? Does it reflect current client behaviours? (Verbal discussion during audit)
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
11. Reflective practice/Incident debrief policy – What is the process for conducting these? Frequency and understanding of debriefs.
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
12. De-escalation (DMH- Needs basis according to PBSP) / TCI training (CYF)
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
13. Training in clients PBSP (DMH-CPE) - Recorded on tracker and available.
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
MTS- Muscular Stress/Manual Handling
-
14. MTS - Has the client got a TRAM Plan? In date?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
15. Practical manual handling training (?) Where is this located? How do we obtain records?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
16. MTS - Has the client got equipment suitable for their needs?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
17. MTS - Is the client equipment on a register and equipment serviced?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
18. MTS - Can staff on site (this could mean 1 or 2 staff on shift during audit) (verbal discussion rather than physical demonstration – client dignity and human rights) demonstrate competence and compliance to the TRAM Plan, work instructions and equipment. (Are they trained? Training records?)
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
Slip, Trips and falls
-
19. Following a visual inspection are any slip, trip or fall hazards present?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
20. Do staff have the correct footwear?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
21. Is the lighting adequate?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
Mental Health – Self care (do staff use the plan?) /work life balance/non-client related
-
22. Has a psychosocial risk assessment been completed?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
23. Do you know about the Mental Health First Aider Network? Do you know where to find a support person?
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
24. Proactive use of Converge – Eg: group or individual counselling – Is the process known and understood? Has the EAP Toolbox Talk been conducted.
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
*In the final audit document these will need to be asked for each client N/A will remove the question from total and scoring
Training Compliance checks
-
Training Compliance checks = 10% overall score* Score 80
Training Compliance checks
-
1. Safety Induction
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
2. My Learning Emergency management
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
3. My Learning Intro to MTS
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
4. My Learning Occupational Violence
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
Safety Management Plan Compliance checks
-
Safety Management Plan Compliance checks = 20% overall score, Score 120
Item no. 6 to be sourced from RRU
Items no. 7-12 from Property Folder
Safety Management Plan Compliance checks
-
1. Site Famil Induction+ Emergency Response Plan
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
2. First Aid Kit
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
3. Site Risk Register
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
4. Hazardous Substance Register
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
5. Quarterly Workplace inspection
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
6. Extreme Weather Event Plan
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
7. Evacuation Diagram
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
8. Asbestos Register
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
9. Electrical test and tag
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
10. Fixed RCD testing
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
11. Fire servicing
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
-
12. TMV installed and serviced
-
Prompts:
-
Evidence Required:
-
Corrective Actions:
-
Responsible:
Sign Off
-
Signature: