Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Cafe
Electronic Equipment - Sign-offs (Confirm checks have been done by team)
-
Have registers been reconciled with cash draws cleared and cash floats prepared for the following day's trade?
-
Has electronic point of sale equipment been reconciled and logged out of?
Equipment
Coffee Machines
-
Clean coffee machine including brew heads and milk frothing spouts
-
Turn off all café machines and equipment
-
Temperature of Milk refrigeration is 1-4'C
-
Milk supplies ordered for the next day including Full Cream, Half and Half, Skim, Oat, Almond and Soy Milk?
-
Regular espresso and decaf espresso coffee orders made if required?
-
Flavour Syrup
-
Are display fridges turned are stocked?
-
Temperature of Milk refrigeration is 1-4'C
Food and Beverage - Sign-offs (Confirmed by the individual who did the checks)
Seating Area - Sign-offs (Confirmed by the individual who did the checks)
Indoor Areas
-
All tables are wiped down and chairs stacked on tables?
-
Are all floors swept/vacuumed and mopped ready for the next day
-
All surfaces are clean and tidy.
Outdoor areas
-
Is there an outdoor seating area?
-
All seat cushions and chairs secured?
-
Are umbrellas secured?
-
All surfaces are clean and tidy.
-
Is there any other damaged to report?
-
What has been damaged?
On Departure
-
Have all doors and windows been secured?
-
Has the trash and other waste been appropriately disposed off and bins out for collection?
-
Has the alarm been activated on departure?
-
Manager/staff member signature