Information
-
SAFETY FROM THE SYSTEM OHL
-
SITE/ROUTE
-
SCHEME TITLE
-
Principle contractor
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Access / Egress
-
1.1 - Check safe access/egress to and from site is being maintained
-
1.2 - Check site security is being maintained, eg HV compound gates locked, substation keys only used by authorised contractors
-
Findings
-
Add media
2.0 - CDM DEMARCATION ZONE
-
2.1 - Check standard and effectiveness
-
2.2 - Examine Hazard plan
-
2.3 - Examine arrangements schedule (see UKBP/TP137A)
-
2.4 - Examine standard or security arrangements
-
Findings
-
Add media
3.0 - NOTICE BOARD DISPLAY (Check the following is displayed)
-
3.1 - National grid safety rules poster
-
3.2 - National grid policy statement for public safety
-
3.3 - F10 form
-
3.4 - Appendix K
-
Findings
-
Add media
4.0 - SAFETY RULE DOCUMENTATION
-
4.1 - Ensure work undertaken has appropriate safety documentation issued
-
4.2 - Check work enacted in accordance with safety documentation issued
-
4.3 - Ensure safety rule demarcation for relevant safety documents complies with NSI6
-
4.4 - Ensure all work within HV compound complies with NSI6
-
Findings
-
Add media
5.0 - RAMS AND SUPPLEMENTRY DOCUMENTATION
-
5.1 - Examine that RAMS associated with safety from the system are being worked to correctly
-
5.2 - Examine working party register is correct
-
Findings
-
Add media
6.0 - COMPETENCY
-
6.1 - Persons/BESC training
-
6.2 - Competent persons/BESC training
-
Findings
-
Add media
7.0 - Final overview and findings
-
Add media
Sign Off
-
On site representative
-
Auditor's signature