Title Page

  • Conducted on

  • Prepared by

  • Location

Previous Project Inspection

  • Has the last site inspection been reviewed in preparation for this inspection?

  • Are there any outstanding corrective action to be taken?

Number of operative on site

  • How many operatives on site at time of inspection?

General conditions

  • Perimeter fence in good condition?

  • Electrical safety controls in place, LOTO system in place?

  • Project signage in place?

  • Adequate toilet facilities in place?

Housekeeping

  • Appearance of site, neat and orderly?

  • Passageways clear and free from grease, oils and obstructions

Power and Hand tools

  • Have PUWER check sheet been completed for equipment in use

  • HAV assessments been recorded?

  • P.A.T completed?

  • Tools and cords in safe working condition?

  • Tools safety stored?

  • Designated charging points being used?

  • Suitable tools used for their intended purpose?

Fall protection

  • Edge protection installed and maintained in good condition?

  • Fall arrest equipment check sheet completed?

  • Fall arrest equipment being used correctly?

  • Floor openings/holes guarded and marked?

Scaffolding, including mobile towers

  • Guardrails being used?

  • Access ladders in place, and secured?

  • Scafftag in place, and in date?

Fire Prevention and Protection

  • Fire extinguishers in place for general conditions and hot works?

  • Monthly and annual inspections completed?

  • Safe storage of hazardous substances and fuels?

Cranes and Rigging

  • Is a lift plan in place?

  • Crane set up as per lift plan?

  • Lift supervisor, slingers, signaler etc.. in place?

  • LOLER inspection available?

  • Is the crane a suitable distance from power lines or have power lines isolated to allow for works?

  • Full exclusion zone set around the crane?

PPE

  • PPE in line with RAMS and Task?

  • PPE in good condition?

Welding and cutting

  • Fire extinguisher at site of welding/cutting?

  • Fire look out in place?

  • Inspection of cutting disc carried out?

  • Abrasive wheel training in place?

Stairways

  • Treads and landings acceptable?

  • Handrails installed?

  • Temp lighting in stairways acceptable?

  • Housekeeping in good condition?

Temporary Works

  • Permit in place?

  • Do works appear in safe condition?

MEWP

  • Operators trained, records on site?

  • Gates and guard rails being used?

  • MEWP being used correctly?

  • Daily inspection of MEWP completed?

  • Statutory inspection certification in place?

Material handling

  • Are materials stored safely with segregation in place?

Administration

  • Inductions completed for all operatives?

  • Method statements and risk assessments signed by all operatives and issued to main contractor?

  • Training records maintained and on site?

  • First aid kits available and maintained on site?

  • MSDS/COSHH assessments available for review?

Any other Observations

  • Site manager/supervisor

  • Person conducting audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.