Title Page

  • Site conducted

  • Conducted on

  • Prepared by

Emergency Action Plan

Documentation

  • A current written program is in place for this topic.

  • All employees have been trained on this topic (New Hire and Refresher every 12 months).

Inspection

  • Emergency Action Plan (MAP) is posted, exit routes, location of portable fire extinguishers, and AT LEAST two (2) rally points identified.

  • Exits are clearly marked with signage and illuminated as required.

  • Exit doors are accessible and functioning as required.

  • Incident Reporting Procedures posted near each phone and common areas.

  • First Aid Kits clean and properly stocked with no out-of-date items. Bloodborne pathogens kit available (gloves, glasses, bio-hazard bags)

  • Eye Wash Stations installed correctly where required and functioning.

Confined Space

Documentation

  • A current written program is in place for this topic.

  • All Affected Employees have been trained on this topic (New Hire and Refresher every 12 months).

  • All Authorized Employees have been trained on this topic (Initial and Refresher every 12 months).

Inspection

  • It is clear to all employees who has been trained as and is authorized to be Entrants, Attendants and Entry Supervisors.

  • A Master List and procedures are available for each Confined Space.

  • All Confined Spaces numbered and identified with signage.

  • Confined Space entry permits are available and, if used, were completed correctly and are kept on file.

General Safety / Housekeeping

Documentation

  • A current written program is in place for this topic.

  • All employees have been trained on General Safety and Housekeeping requirements.

Inspection

  • Entry sign, traffic plan, and other safety signage in place at entrance to facility.

  • Grounds free of trash and debris, trash cans on site, dumpsters have lids & plugs. No empty drums, totes or tanks.

  • Hoses stored properly and are not a tripping hazard.

  • Lighting is adequate and operational.

  • Housekeeping acceptable - OFFICE (counters, floor, storage, bathroom).

  • Housekeeping acceptable - YARD (entrance, parking areas, roadways, etc.).

  • Housekeeping acceptable - SHOP / OTHER BUILDING (floor, parts room, etc.).

HAZCOM

Documentation

  • A current written program is in place for this topic.

  • All employees have been trained on HAZCOM requirements.

  • SDS updated and available for all applicable materials used on site. List of chemicals on site.

Inspection

  • All containers labeled correctly.

  • Flammable liquids stored in metal cans with self-closing lids.

Electrical Safety

Documentation

  • A current written program is in place for this topic.

  • All employees are trained and aware of the policy forbidding exposing themselves to live electrical and protections / procedures are in place to safely resolve issues.

Inspection

  • Electrical room is labeled, is clean, has clear access and can be closed. High voltage signs posted. Not used for storage.

  • Panels, breakers and switches are properly identified and labeled.

  • GFI's used for all outdoor or wet areas.

  • All conduit and wiring free from damage.

  • All extension power cords and plugs free from damage and NOT used for permanent applications (3+ days is considered permanent).

  • All panels, switches, receptacles, junction boxes are provided with appropriate covers (i.e. there is no exposure to live electrical parts).

Energy Isolation / Lockout, Tagout, Tryout (LOTOTO)

Documentation

  • A current written program is in place for this topic.

  • It is clear who is trained as an Authorized and Affected Individual.

  • LOTOTO procedures available for each piece of equipment.

Inspection

  • LOTOTO station mounted with standardized RED locks and tags and only ONE (1) unique key per lock.

  • LOTOTO devices are used properly and ONLY for Energy Isolation processes.

  • A Continuous Log and Periodic Inspection is completed for procedures executed.

Personal Protective Equipment (PPE)

Documentation

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

  • Current PPE Selection sheets are available describing the requirements by job title.

  • Task specific PPE identified and available (hearing protection, full face shields and rubber gloves for truck wash area, leather gloves, Arc Flash kit, etc).

Inspection

  • PPE requirements posted.

  • "Basic 5" available and observed being worn (Hard Hats, Glasses, Hi-Viz, Safety Boots, Gloves ready for use).

  • Extra PPE available for employees as needed and for visitors.

Mixer Trucks

Documentation

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

Working At Height (WAH)

Documentation

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

  • WAH procedures, risk assessments, and permits implemented, used, and filed.

  • Personal Fall Protection Systems are inspected before use and an annual inspection is documented as required.

Inspection

  • Elevated work platforms and cat walks clear of trip hazards and debris.

  • All work platforms that are elevated four (4) feet or more have handrail (42"), midrail (21"), and toe board (4" tall).

  • All stairs with four (4) or more steps have standard hand rails.

  • There are NO aluminum ladders on site. Portable ladders and scaffolding in good condition, labeled, properly used, secured and stored when not in use.

  • Fixed ladders in good condition, secure, and cages on ladders over 20' starting at 7' and provided with cages/wells or landing platforms.

  • Beginning Nov. 2018, any NEW fixed ladder installations over 20' equiped with safety cable and connecting device.

  • Swing Gates are installed according to OSHA requirements (see guide).

  • Personal Fall Protection Systems are appropriate and being used properly by trained employees (full body harness and lanyard, connecting devices, etc.).

Conveyor Safety

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

Fire Safety / Hot Work

Documentation

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

Inspection

  • Fire Extinguishers mounted as required and checked every month for service life, pin secured, & mounted and accessible.

  • Oxygen / acetylene tanks in compliance (all gauges working properly, chained in proper manner to carts or walls, capped and stored at least 20 feet apart or from other combustibles when not in use, valves closed while not in use, equipped with a safety cap over the valves when in use)

  • All welding equipment is in good working order.

  • All portable welding equipment trailers equipped with fire extinguishers.

  • All torch hoses are in good condition with no unauthorized repairs and torch heads equipped with back-flow preventers.

  • All fuel storage containers have labels and required placards (Diesel Fuel, LP Gas, etc.).

  • Fuel storage emergency shutoff is marked, spill kit is on site, & fire extinguisher in operating condition & accessible.

  • No leaks in Fuel plumbing system, or outside containment area, fill pipes are capped, spill bucket has lid, tank monitoring system is operable.

  • Flammable and No Smoking signs present in all required areas (fueling area, etc.)

  • If amounts of flammable products exceed 25 gallons, they are stored in fire proof cabinets.

Front-End Loader AND Powered Industrial Trucks (PIT) / Forklift Safety

Documentation

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

  • Operator trained (documentation available including annual observation) and is observed operating safely (seat belt, speed, looks before backing, etc.) during this inspection.

Inspection

  • There is designated parking for Front-End Loader, Powered Industrial Trucks (PIT), Forklifts, etc.

  • Pre-use inspections are completed.

  • INTERIOR inspected and compliant (Operator's Manual available, Fire Extinguisher, Seatbelt, Cab free of debris, etc.).

  • EXTERIOR inspected and compliant (Backup alarm working, All lights working, Tire/Wheel condition, Ladder, Hand-holds, Steps, Frame/Structural, etc.).

  • Site hazards for equipment are controlled (blind corners, slopes/drop-offs with proper berm, protocol in place for other vehicles, etc.).

  • If a PIT / Forklift / Moffett is on site, the Site-Specific Hazard Identification Forms are completed as required.

Untitled Page

MISCELLANEOUS

  • A current written program is in place for this topic.

  • All employees are appropriately trained on this topic and the training is documented.

  • Lifting / Rigging Devices are compliant (tagged, safety latches, in good working order, stored properly, etc.)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.