Information

  • Conducted on

  • Job Name / Job Number

  • Superintendent

"ALL IN"

  • Is this Project Team "ALL IN"? Score must be consistent with an "A" grade (No significant safety culture issues). If No, provide action plan to Office Leader & Safety.

Housekeeping

  • Project work areas are free or excess trash, debris

  • Walkways and passageways clear

  • Project materials stored safely and on dunnage

  • Electrical cords, hoses, welding leads routed safely out of walkways

  • Scrap material free of protruding nails or any other puncture hazards

  • Trash receptacles and water near work areas

  • Barricades installed and maintained

  • Rebar is protected

GENERAL SAFETY

  • Safety Planning (pre-con meetings, safety plan, JSA, morning huddles, pre-task plans)

  • Postings (State, Federal, Emergency #'s, Incident Reporting & Crisis Management)

  • Material Safety Data Sheets (3E MSDS on Demand Posting & Subcontractor MSDS's)

  • First Aid Kit / Eyewash Replenished

  • Sanitation (1 toilet per 20 workers)

  • Motorized Equipment (qualified operator identified, backup alarms, seat belts, equipment condition acceptable)

  • Date Corrected:

Personal Protective Equipment

  • Proper Attire (shirts 4" sleeves, pants, boots, hard hat)

  • Date Corrected:

  • Eye protection required and worn in proper manner (glasses, goggles, face shield)

  • Date Corrected:

  • Other (hearing, gloves, respirators, chemical protection, metatarsal guards)

  • Date Corrected:

  • Face shield or goggles worn as required( pumping or vibrating concrete )

  • Date Corrected:

  • Gloves match task being performed (cut resistant, chemical, hot work)

  • Hearing protection is used when required

  • Safety toed boots worn

Fall Protection System

  • Guardrails (200#, 42" +/- 3", toeboards, wire rope flagged every 6')

  • Date Corrected:

  • Holes (guarded, covered, secured, labeled)

  • Date Corrected:

  • Correct fall protection system being used and anchored properly

  • Date Corrected:

  • Other (falling object protection, safety nets, warning lines minimum of 15' from edge)

  • Date Corrected:

  • Fall protection maintained and has current inspection color code

  • Fall protection equipment only used for fall protection

Fire Protection/Prevention

  • Flammable a stored properly

  • Date Corrected:

  • Fuel Storage (location, container, extinguisher, traffic protection)

  • Date Corrected:

  • Hot Work (fire watch, fire blankets, permit, extinguisher present, debris clear)

  • Date Corrected:

  • Compressed gas cylinders properly maintained

  • Date Corrected:

  • Containers labeled as to content

  • Date Corrected:

  • Fire extinguishers properly located and inspected

  • Gauges/Flash arresters installed properly

Permits/JHA's

  • Applicable permits posted (excavations, confined space, hot work)

  • JHA's complete, signed off by crew and supervisor

Cranes/Hoisting/Lifting Equipment

  • Daily Lift Plan (Qualified Operator, Signal Person, Rigger, Daily, Periodic and Annual Inspections)

  • Date Corrected:

  • Set-Up (barricaded, level, powerlines 20' minimum clearance)

  • Date Corrected:

  • Outriggers (extended, pads adequate & level per Daily Lift Plan)

  • Date Corrected:

  • Operation (load path, taglines, signal person)

  • Date Corrected:

  • Capacity (charts available, critical lift plan, object weights identified)

  • Date Corrected:

  • Sling Condition (wire rope, synthetic, hardware)

  • Date Corrected:

Vehicles/Mobile Equipment

  • Pre-Job inspection complete and available

  • Seat belts provided and used with roll over protection

  • Manufacturer manual present

  • Licenses or certifications as required for forklift, crane, aerial lifts

Tools and Equipment

  • Electrical cords-condition inspected(color coded)

  • Tools are maintained and in good condition

  • Tools are carried and stored properly

  • Pneumatic/hydraulic hose connections properly secured (whiplash connectors, cotter pins)

  • Proper tool for job

  • All handles and guards on

  • Other

Access Equipment

  • Extension Ladders (4V:1H, secured at top and base, 3' above landing, 3 points of contact)

  • Date Corrected:

  • Step Ladders (stable, proper use, inspected, non-conductive)

  • Date Corrected:

  • Stairs (metal pan treads filled, uniform w/in 1/4", rails @ 36", unobstucted, illuminated)

  • Date Corrected:

  • Aerial & Scissor Lifts (proper use, fall protection, condition, rails, operator training)

  • Date Corrected:

Electricity

  • Panels (covers in place, circuits identified, weatherproof, secured, breakers/holes filled)

  • Date Corrected:

  • GFCI (@ breakers, outlets, pigtails, electrician weekly testing log)

  • Date Corrected:

  • Electrical Cords (ground, strain relieve, condition, protected from traffic, proper use)

  • Date Corrected:

  • Lighting (adequate- 5 ft candles, protected, secured, sockets filled, separate circuit)

  • Date Corrected:

Excavation

  • Daily Dig Permit (Competent Person Inspection, utilities located, cracks, spalling, water accumulation, changed conditions)

  • Date Corrected:

  • Access/Egress @ 4' (ladder, ramp, stairs within 25' of travel)

  • Date Corrected:

  • Open excavations barricaded

  • Date Corrected:

  • Protection @ 5' (slope, bench, shield, shore)

  • Date Corrected:

  • Other (spoils 2' back, vibration, hazardous atmosphere potential)

  • Date Corrected:

Scaffolding

  • Base (sills/plates/jacks/casters, secured, level, locked)

  • Date Corrected:

  • Braces (installed, secured, condition)

  • Date Corrected:

  • Frames (compatible, pinned, condition)

  • Date Corrected:

  • Platform (fully planked, overhang 6"-12" or cleated, plank condition)

  • Date Corrected:

  • Access (integral frame - 16 3/4" rung spacing, ladder w/ gate, stairtower)

  • Date Corrected:

  • Other (secured @ 4V:1H, level, tagged, competent person inspected, tarp/debris net engineer approval)

  • Date Corrected:

Miscellaneous (Items not captured in categories listed above)

  • Date Corrected:

Positive Observations

Inspector Signature

  • Add signature

Project Superintendent Signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.