Information
-
Conducted on
-
Job Name / Job Number
-
Superintendent
"ALL IN"
-
Is this Project Team "ALL IN"? Score must be consistent with an "A" grade (No significant safety culture issues). If No, provide action plan to Office Leader & Safety.
Housekeeping
-
Project work areas are free or excess trash, debris
-
Walkways and passageways clear
-
Project materials stored safely and on dunnage
-
Electrical cords, hoses, welding leads routed safely out of walkways
-
Scrap material free of protruding nails or any other puncture hazards
-
Trash receptacles and water near work areas
-
Barricades installed and maintained
-
Rebar is protected
GENERAL SAFETY
-
Safety Planning (pre-con meetings, safety plan, JSA, morning huddles, pre-task plans)
-
Postings (State, Federal, Emergency #'s, Incident Reporting & Crisis Management)
-
Material Safety Data Sheets (3E MSDS on Demand Posting & Subcontractor MSDS's)
-
First Aid Kit / Eyewash Replenished
-
Sanitation (1 toilet per 20 workers)
-
Motorized Equipment (qualified operator identified, backup alarms, seat belts, equipment condition acceptable)
-
Date Corrected:
Personal Protective Equipment
-
Proper Attire (shirts 4" sleeves, pants, boots, hard hat)
-
Date Corrected:
-
Eye protection required and worn in proper manner (glasses, goggles, face shield)
-
Date Corrected:
-
Other (hearing, gloves, respirators, chemical protection, metatarsal guards)
-
Date Corrected:
-
Face shield or goggles worn as required( pumping or vibrating concrete )
-
Date Corrected:
-
Gloves match task being performed (cut resistant, chemical, hot work)
-
Hearing protection is used when required
-
Safety toed boots worn
Fall Protection System
-
Guardrails (200#, 42" +/- 3", toeboards, wire rope flagged every 6')
-
Date Corrected:
-
Holes (guarded, covered, secured, labeled)
-
Date Corrected:
-
Correct fall protection system being used and anchored properly
-
Date Corrected:
-
Other (falling object protection, safety nets, warning lines minimum of 15' from edge)
-
Date Corrected:
-
Fall protection maintained and has current inspection color code
-
Fall protection equipment only used for fall protection
Fire Protection/Prevention
-
Flammable a stored properly
-
Date Corrected:
-
Fuel Storage (location, container, extinguisher, traffic protection)
-
Date Corrected:
-
Hot Work (fire watch, fire blankets, permit, extinguisher present, debris clear)
-
Date Corrected:
-
Compressed gas cylinders properly maintained
-
Date Corrected:
-
Containers labeled as to content
-
Date Corrected:
-
Fire extinguishers properly located and inspected
-
Gauges/Flash arresters installed properly
Permits/JHA's
-
Applicable permits posted (excavations, confined space, hot work)
-
JHA's complete, signed off by crew and supervisor
Cranes/Hoisting/Lifting Equipment
-
Daily Lift Plan (Qualified Operator, Signal Person, Rigger, Daily, Periodic and Annual Inspections)
-
Date Corrected:
-
Set-Up (barricaded, level, powerlines 20' minimum clearance)
-
Date Corrected:
-
Outriggers (extended, pads adequate & level per Daily Lift Plan)
-
Date Corrected:
-
Operation (load path, taglines, signal person)
-
Date Corrected:
-
Capacity (charts available, critical lift plan, object weights identified)
-
Date Corrected:
-
Sling Condition (wire rope, synthetic, hardware)
-
Date Corrected:
Vehicles/Mobile Equipment
-
Pre-Job inspection complete and available
-
Seat belts provided and used with roll over protection
-
Manufacturer manual present
-
Licenses or certifications as required for forklift, crane, aerial lifts
Tools and Equipment
-
Electrical cords-condition inspected(color coded)
-
Tools are maintained and in good condition
-
Tools are carried and stored properly
-
Pneumatic/hydraulic hose connections properly secured (whiplash connectors, cotter pins)
-
Proper tool for job
-
All handles and guards on
-
Other
Access Equipment
-
Extension Ladders (4V:1H, secured at top and base, 3' above landing, 3 points of contact)
-
Date Corrected:
-
Step Ladders (stable, proper use, inspected, non-conductive)
-
Date Corrected:
-
Stairs (metal pan treads filled, uniform w/in 1/4", rails @ 36", unobstucted, illuminated)
-
Date Corrected:
-
Aerial & Scissor Lifts (proper use, fall protection, condition, rails, operator training)
-
Date Corrected:
Electricity
-
Panels (covers in place, circuits identified, weatherproof, secured, breakers/holes filled)
-
Date Corrected:
-
GFCI (@ breakers, outlets, pigtails, electrician weekly testing log)
-
Date Corrected:
-
Electrical Cords (ground, strain relieve, condition, protected from traffic, proper use)
-
Date Corrected:
-
Lighting (adequate- 5 ft candles, protected, secured, sockets filled, separate circuit)
-
Date Corrected:
Excavation
-
Daily Dig Permit (Competent Person Inspection, utilities located, cracks, spalling, water accumulation, changed conditions)
-
Date Corrected:
-
Access/Egress @ 4' (ladder, ramp, stairs within 25' of travel)
-
Date Corrected:
-
Open excavations barricaded
-
Date Corrected:
-
Protection @ 5' (slope, bench, shield, shore)
-
Date Corrected:
-
Other (spoils 2' back, vibration, hazardous atmosphere potential)
-
Date Corrected:
Scaffolding
-
Base (sills/plates/jacks/casters, secured, level, locked)
-
Date Corrected:
-
Braces (installed, secured, condition)
-
Date Corrected:
-
Frames (compatible, pinned, condition)
-
Date Corrected:
-
Platform (fully planked, overhang 6"-12" or cleated, plank condition)
-
Date Corrected:
-
Access (integral frame - 16 3/4" rung spacing, ladder w/ gate, stairtower)
-
Date Corrected:
-
Other (secured @ 4V:1H, level, tagged, competent person inspected, tarp/debris net engineer approval)
-
Date Corrected:
Miscellaneous (Items not captured in categories listed above)
-
-
Date Corrected:
Positive Observations
Inspector Signature
-
Add signature
Project Superintendent Signature
-
Add signature