Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

A. GENERAL

  • A1. Has a daily risk and hazard assessment been completed prior to starting work?

  • A2. Have all employees or visitors signed the daily risk and hazards assessment sheet?

  • A3. Has the daily risk and hazard sheet been completed correctly?

  • A4. Overhead hazards have been identified?

  • Why not?

  • A5. Traffic has been identified correctly?

  • Why not?

  • A6. Location has been accessed properly?

  • Why not?

  • A7. Are bush fire safety measures in place?

  • Why not?

  • A8. Site specific environmental issues identified?

  • Why not?

  • If reason is not listed please explain.

  • A9. Is there a controlled, approved and current copy of the safety management plan on site?

  • A10. Is there a controlled and current copy of Safe Work Method Statements on site?

  • A11. Have there been any issues raised on the site that have not been identified in the Safe Work Method Statement?

  • Provide more information:

  • A12. Are Material Safety Data Sheets on site?

  • A13. Are all personnel inducted to this contract?

  • Provide more information:

  • A14. Has the induction been registered into the passport book?

  • A15. Are personnel carrying identification tags which are in reasonable condition?

  • A16. Are first aid kits readily available and fully stocked?

  • A17. Is there a fire extinguisher on the vehicle and is it operational?

  • A18. Is the fire extinguisher within the tagged service date?

  • Provide more information:

  • A19. Is the security pin in the fire extinguisher secured?

  • A20. Is there suitable access to the extinguisher around the work site?

  • A21. Is there adequate lighting?

  • A22. Are hand tools in good condition?

  • A23. Are air hoses in good condition?

  • A24. Are the air hose connections secured with safety pins?

  • A25. Is there any hose running across the roadway?

  • A26. Is there a person monitoring the hose running across the roadway?

  • A27. Are fuel containers properly labelled?

  • A28. Are fuel containers stored in the appropriate container (150% of volume)?

  • A29. Are the fibreglass push rods in satisfactory condition?

B. Sub-Contractor

  • Are there any Sub-Contractors on site?

  • B1. Has the sub-contractor been approved to work on site?

  • B2. Has the client been notified via the the daily location sheet?

  • B3. Does the sub-contractor need an Authority To Work permit?

  • B4. Is the Authority To Work permit on site?

  • B5. What is the Authority To Work permit number?

C. Clothing (PPE)

  • C1. Regulation helmets worn correctly at all times and remain within their expiry period?

  • C2. Appropriate safety glasses or face shields worn when necessary?

  • C3. Are the appropriate respirators/filters being used when necessary?

  • C4. Are gloves worn when required?

  • C5. Is correct safety footwear worn?

  • C6. Are earmuffs or ear plugs worn when required?

  • C7. Are safety vests/high visibility shirts in good condition?

D. Confined spaces

  • D1. Have site required confined space procedures to be implemented?

  • D1.1. Has the gas monitor been response tested and recorded on the appropriate documentation?

  • D1.2. Serial number of gas monitor.

  • D1.3. Is gas monitor within calibration date?

  • D1.4. Calibration due date

  • D1.5. Has testing of maintenance hole been recorded on entry permit or the daily risk assessment sheet?

  • D1.6. Record names and Confined Space Certificate Number of all staff entering the confined space.

  • D1.7. Who is the nominated person for maintenance hole entry?

  • D1.8. Who is the nominated person for standby duties?

  • D1.9. Is the nominated standby person currently confined space trained?

  • D1.10. Are correct confined space procedures being followed?

  • D1.11. Has the confined space entry permit been filled out?

  • D1.12. Record the permit number

  • D1.13. Are the chemicals used in confined spaces nominated on the confined space entry permit?

  • D1.14. Are all applicable sections addressed by either a tick or N/A?

  • D1.15. Has the responsible person signed off where required?

  • D1.16. Is there an approved tripod on site?

  • D1.17. Is the tripod engraved with an ID number?

  • D1.18. Record the ID number.

  • D1.19. Is the tripod fully extended?

  • D1.20. Is there an Australian Standard approved harness on site?

  • D1.21. Is the harness in good condition?

  • D1.22. Record the serial number of the harness.

  • D1.23. Is there an air rescuer on site and within its 10 year date?

  • D1.24. Is there a grate covering unattended maintenance hole?

  • D1.25. Is there "Confined Space Entry by Permit Only" signage displayed?

E. Civils

  • E1. Is the current activity Civil Construction?

  • E1.1. Have the Safe Work Method Statements been identified for this process?

  • E1.2. Is there 'Dial Before You Dig' information on site?

  • E1.3. What is the job number on the 'Dial Before You Dig' job caller confirmation sheet?

  • E1.4. Has a dig/cut permit (QF 137) been completed?

  • E1.5. Have precautions been taken to positively identify and locate the position and lie of any underground services, before excavation has started?

  • E1.6. Has the work area been barricaded, bollards placed and sign posted to warn residents or pedestrians of potential hazards?

  • E1.7.1. Has the trench/excavation been identified as a confined space?

  • E1.7.2. Is there an escape/access route in place?

  • E1.7.3. Is there a gas monitor in position?

  • E1.7.4. Is the self rescuer within reach?

  • E1.8. If trenches 1.5m or more in depth correctly shored or battered?

  • E1.9. Is the edge of the trench clear of spoil (minimum 1000mm)

  • E1.10. Are correct techniques being used when lowering items into the trench?

  • E1.11. Are the persons in the trench clear when items are being lowered?

  • E1.12. Are ladders used adequate and in good condition?

  • E1.13. Are ladders secured correctly, at the right height and angle?

F. Ex Method

  • F1. Is the current activity Ex Lining?

  • F1.1. Have the Safe Work Method Statements been identified for this process?

  • F1.2. Have persons been instructed on the work instruction for this process?

  • F1.3. Has a hot work permit been completed to work Instruction (W1012)?

  • F1.4. Have employees been provided with appropriate P.P.E. for this process?

  • F1.4.1. Leather gloves

  • F1.4.2. Eye protection

  • F1.4.3. Leather Arm Guards

  • F1.4.4. Dust Mask or Respirator

  • F1.4.5. Are these being worn when required?

  • F1.5. Boiler Truck

  • F1.5.1. Is there a current boiler inspection certificate on the truck?

  • F1.5.2. Does the stand pipe have a backflow prevention device attached?

  • F1.5.3. Is there a current certificate for the backflow prevention device?

  • F1.5.4. Are steam hoses in satisfactory condition?

  • F1.6. Winch Truck

  • F1.6.1. Does the tray need to be degreased?

  • F1.6.2. Is the truck crane free of leaks?

G. Tiger Tees/Patching

  • G1. Is the current activity Tiger Tees/Patching?

  • G1.1. Have the Safe Work Method Statements been identified for this process?

  • G1.2. Have persons been instructed on the work instructions for this process?

  • G1.3. Are employees or the public protected from the winch when it is able to start?

  • G1.4. Have employees been provided with the appropriate P.P.E. for this process?

  • G1.4.1. Respirator mask

  • G1.4.2. Inorganic filters A!, B1, E1, and P3 survivor

  • G1.4.3. Full face shield

  • G1.4.4. Rubber apron

  • G1.5. Are resin containers correctly labelled?

  • G1.6. Is quality QF063 Camera Ipex, Equipment Gas recording register being completed?

H. CCTV/Jetting

  • H1. Is the current activity CCTV/Jetting?

  • H1.1. Have the Safe Work Method Statements been identified for this process?

  • H1.2.1. Have employees been instructed on Work Instruction WI034 High Pressure Water Jetting Mainlines?

  • H1.2.2. Have employees been instructed on Safe Work Method Statements WMS003 Clean and CCTV Sewer Conduit?

  • H1.3. Is the jetted hose in good condition?

  • H1.4. Is access to the vehicle acceptable?

  • H1.5. Is there a 110mm gap to prevent backflow from the jetted reservoir?

  • H1.6. Is there a backflow prevention device on the stand pipe?

  • H1.7. Is there a current certificate for the backflow prevention device?

  • H1.8. Is quality QF063 Camera Ipex, Equipment Gas recording register being completed?

I. Traffic Control

  • I1. Is traffic control required on this site?

  • I1.1. Is there an approved traffic control plan in use?

  • I1.2. What is the Traffic Control Plan Number?

  • I1.3. Are advisory signs as per Traffic Control Plan selected?

  • I1.4. Is there a requirement for traffic controllers?

  • I1.5. Does the traffic controller have a current Traffic Controllers Certificate?

  • I1.6. Provide the traffic controllers name and licence number.

  • I1.7. Is there a requirement for a certified Traffic Control Agency?

  • I1.7.1 Do they have a traffic management plan on site that has been approved by the appropriate authorities?

  • I1.7.2 Are advisory signs as per the Traffic Control Plan?

  • I1.7.3 Provide controllers name and licence number?

  • I1.7.4 Has a representative of Kembla Watertech sighted the traffic control plan?

  • I1.8. Is the access around the worksite safe for the public?

  • I1.9. Is there a current speed reduction in place?

  • I1.9.1. Provide the Speed Reduction Certificate Number.

  • I1.10. Is there a current Council Permit or written Authorisation on site?

  • I1.11. Is there a current approved Police Permit on site?

  • I1.12. Are there adequate spare signs on site if required?

  • I1.13. Is there a copy of QF006 Traffic Control Site Appraisal on site?

  • I1.14. Is there a copy of QF015 Onsite Daily Inspection Checklist on site?

  • I1.15. Is there a copy of QF030-1 Traffic Control Management HIDRA on site?

  • I1.16. Are all traffic controllers correctly situated?

  • I1.17. Is there a qualified relief person on site?

  • I1.18. Are traffic controllers wearing correct vest or night overalls?

  • I1.19. Is signage in good condition?

  • I1.20. Do traffic controllers have escape routes?

  • I1.21. Are there night wands on site if required?

  • I1.21. Are pedestrians and cyclists catered for at site?

  • I1.22. Are pedestrian managers required at site?

  • I1.23. Are beacons and arrow boards on Traffic Control vehicles functioning correctly?

J. Signage

  • J1. Are there 2 'Pedestrians Watch Your Step' signs?

  • J2. Are there 2 'Part Road Closed' signs?

  • J3. Are there 4 'Dig Man Ahead' signs?

  • J4. Are there 2 chevron signs 'Left and Right'?

  • J5. Is there a 'Clients Information' sign on site?

  • J6. Is there a 'Confined Space Entry' sign?

  • J7. Is the signage in good condition?

K. Plant

  • K1. Is the plant/vehicle operator licensed?

  • K1.1. What is the Driver/Operators name?

  • K1.2. What is the Class of Drivers License or Work Cover Ticket number?

  • K2. Provide vehicle registration number.

  • K3. Provide registration expiry date.

  • K4. Perform visual inspection of plant.

  • K4.1. Tyres

  • K4.2. Headlights

  • K4.3. Indicators

  • K4.4. Tail Lights

  • K4.5. Brake Lights

  • K4.6. Horn

  • K4.7. Windscreen

  • K4.8. Windows

  • K4.9. Bodywork

  • K4.10. Hydraulics

  • K4.11. Towing Mechanism secure

  • K5. Is the cabin in a neat and tidy manner?

  • K6. Is there a spare tyre and jack for this unit?

  • K7. Is the 'DANGER' notice attached and clearly visible to the operator?

  • K8. Is the 'CAUTION' notice attached and clearly visible to the operator?

  • K9. Is there safe access onto or into the vehicle?

  • K10. Has the log book for the Truck Mounted Crane been completed for that day?

  • K11. Is the work area of the vehicle clean and tidy and is the equipment stored correctly?

  • K12. Does this plant tow a compressor/trailer

  • K12.1. What is the registration number?

  • K12.2. What is the registration expiry date?

  • K12.3. Tyres

  • K12.4. Indicators

  • K12.5 Tail Lights

  • K12.6. Brake Lights

  • K12.7. Towing Mechanism Secure

L. Scaffolding

  • L1. Is scaffolding in use on site?

  • L1.1. Is the scaffold more than 4 metres high?

  • L1.2. Provide the name of the person who erected the scaffolding?

  • L1.3. Sight the certificate of the above named person and record their certificate number?

  • L1.4. Is the scaffold secure and stable?

  • L1.5. Are there the required top and mid handrails attached (after 1.8metres)?

  • L1.6. Is the working platform fully decked?

  • L1.7. Are toe boards fitted?

M. Electrical

  • M1. Are electrical leads, portable equipment and plant tested and tagged?

  • M1.1. Are tags within their expiry date?

  • M2. Are portable generators, extension leads/power tools protected with an earth leakage device?

  • M3. Is the earth lead being used?

  • M4. Is the electrical log book on site for this vehicle?

  • M5. Is the electrical log book completed correctly

N. Slings

  • N1. Persons slinging loads competent?

  • N2. Correct slings used and in good condition?

  • N3. Is a lead rope used to control loads where necessary?

O. Housekeeping

  • O1. Is the work area tidy and are materials stored properly?

  • O2. Are all steam hoses checked for leaks?

  • O3. Are noise requirements being adhered to?

  • O4. Is all rubbish and cigarette butts removed from site?

  • O5. Are bins being used?

  • O6. Are start times being adhered to (No work prior to 0700h)?

  • O7. Are the steel fittings covered to eliminate burns?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.