Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
A. GENERAL
-
A1. Has a daily risk and hazard assessment been completed prior to starting work?
-
A2. Have all employees or visitors signed the daily risk and hazards assessment sheet?
-
A3. Has the daily risk and hazard sheet been completed correctly?
-
A4. Overhead hazards have been identified?
-
Why not?
-
A5. Traffic has been identified correctly?
-
Why not?
-
A6. Location has been accessed properly?
-
Why not?
-
A7. Are bush fire safety measures in place?
-
Why not?
-
A8. Site specific environmental issues identified?
-
Why not?
-
If reason is not listed please explain.
-
A9. Is there a controlled, approved and current copy of the safety management plan on site?
-
A10. Is there a controlled and current copy of Safe Work Method Statements on site?
-
A11. Have there been any issues raised on the site that have not been identified in the Safe Work Method Statement?
-
Provide more information:
-
A12. Are Material Safety Data Sheets on site?
-
A13. Are all personnel inducted to this contract?
-
Provide more information:
-
A14. Has the induction been registered into the passport book?
-
A15. Are personnel carrying identification tags which are in reasonable condition?
-
A16. Are first aid kits readily available and fully stocked?
-
A17. Is there a fire extinguisher on the vehicle and is it operational?
-
A18. Is the fire extinguisher within the tagged service date?
-
Provide more information:
-
A19. Is the security pin in the fire extinguisher secured?
-
A20. Is there suitable access to the extinguisher around the work site?
-
A21. Is there adequate lighting?
-
A22. Are hand tools in good condition?
-
A23. Are air hoses in good condition?
-
A24. Are the air hose connections secured with safety pins?
-
A25. Is there any hose running across the roadway?
-
A26. Is there a person monitoring the hose running across the roadway?
-
A27. Are fuel containers properly labelled?
-
A28. Are fuel containers stored in the appropriate container (150% of volume)?
-
A29. Are the fibreglass push rods in satisfactory condition?
B. Sub-Contractor
-
Are there any Sub-Contractors on site?
-
B1. Has the sub-contractor been approved to work on site?
-
B2. Has the client been notified via the the daily location sheet?
-
B3. Does the sub-contractor need an Authority To Work permit?
-
B4. Is the Authority To Work permit on site?
-
B5. What is the Authority To Work permit number?
C. Clothing (PPE)
-
C1. Regulation helmets worn correctly at all times and remain within their expiry period?
-
C2. Appropriate safety glasses or face shields worn when necessary?
-
C3. Are the appropriate respirators/filters being used when necessary?
-
C4. Are gloves worn when required?
-
C5. Is correct safety footwear worn?
-
C6. Are earmuffs or ear plugs worn when required?
-
C7. Are safety vests/high visibility shirts in good condition?
D. Confined spaces
-
D1. Have site required confined space procedures to be implemented?
-
D1.1. Has the gas monitor been response tested and recorded on the appropriate documentation?
-
D1.2. Serial number of gas monitor.
-
D1.3. Is gas monitor within calibration date?
-
D1.4. Calibration due date
-
D1.5. Has testing of maintenance hole been recorded on entry permit or the daily risk assessment sheet?
-
D1.6. Record names and Confined Space Certificate Number of all staff entering the confined space.
-
D1.7. Who is the nominated person for maintenance hole entry?
-
D1.8. Who is the nominated person for standby duties?
-
D1.9. Is the nominated standby person currently confined space trained?
-
D1.10. Are correct confined space procedures being followed?
-
D1.11. Has the confined space entry permit been filled out?
-
D1.12. Record the permit number
-
D1.13. Are the chemicals used in confined spaces nominated on the confined space entry permit?
-
D1.14. Are all applicable sections addressed by either a tick or N/A?
-
D1.15. Has the responsible person signed off where required?
-
D1.16. Is there an approved tripod on site?
-
D1.17. Is the tripod engraved with an ID number?
-
D1.18. Record the ID number.
-
D1.19. Is the tripod fully extended?
-
D1.20. Is there an Australian Standard approved harness on site?
-
D1.21. Is the harness in good condition?
-
D1.22. Record the serial number of the harness.
-
D1.23. Is there an air rescuer on site and within its 10 year date?
-
D1.24. Is there a grate covering unattended maintenance hole?
-
D1.25. Is there "Confined Space Entry by Permit Only" signage displayed?
E. Civils
-
E1. Is the current activity Civil Construction?
-
E1.1. Have the Safe Work Method Statements been identified for this process?
-
E1.2. Is there 'Dial Before You Dig' information on site?
-
E1.3. What is the job number on the 'Dial Before You Dig' job caller confirmation sheet?
-
E1.4. Has a dig/cut permit (QF 137) been completed?
-
E1.5. Have precautions been taken to positively identify and locate the position and lie of any underground services, before excavation has started?
-
E1.6. Has the work area been barricaded, bollards placed and sign posted to warn residents or pedestrians of potential hazards?
-
E1.7.1. Has the trench/excavation been identified as a confined space?
-
E1.7.2. Is there an escape/access route in place?
-
E1.7.3. Is there a gas monitor in position?
-
E1.7.4. Is the self rescuer within reach?
-
E1.8. If trenches 1.5m or more in depth correctly shored or battered?
-
E1.9. Is the edge of the trench clear of spoil (minimum 1000mm)
-
E1.10. Are correct techniques being used when lowering items into the trench?
-
E1.11. Are the persons in the trench clear when items are being lowered?
-
E1.12. Are ladders used adequate and in good condition?
-
E1.13. Are ladders secured correctly, at the right height and angle?
F. Ex Method
-
F1. Is the current activity Ex Lining?
-
F1.1. Have the Safe Work Method Statements been identified for this process?
-
F1.2. Have persons been instructed on the work instruction for this process?
-
F1.3. Has a hot work permit been completed to work Instruction (W1012)?
-
F1.4. Have employees been provided with appropriate P.P.E. for this process?
-
F1.4.1. Leather gloves
-
F1.4.2. Eye protection
-
F1.4.3. Leather Arm Guards
-
F1.4.4. Dust Mask or Respirator
-
F1.4.5. Are these being worn when required?
-
F1.5. Boiler Truck
-
F1.5.1. Is there a current boiler inspection certificate on the truck?
-
F1.5.2. Does the stand pipe have a backflow prevention device attached?
-
F1.5.3. Is there a current certificate for the backflow prevention device?
-
F1.5.4. Are steam hoses in satisfactory condition?
-
F1.6. Winch Truck
-
F1.6.1. Does the tray need to be degreased?
-
F1.6.2. Is the truck crane free of leaks?
G. Tiger Tees/Patching
-
G1. Is the current activity Tiger Tees/Patching?
-
G1.1. Have the Safe Work Method Statements been identified for this process?
-
G1.2. Have persons been instructed on the work instructions for this process?
-
G1.3. Are employees or the public protected from the winch when it is able to start?
-
G1.4. Have employees been provided with the appropriate P.P.E. for this process?
-
G1.4.1. Respirator mask
-
G1.4.2. Inorganic filters A!, B1, E1, and P3 survivor
-
G1.4.3. Full face shield
-
G1.4.4. Rubber apron
-
G1.5. Are resin containers correctly labelled?
-
G1.6. Is quality QF063 Camera Ipex, Equipment Gas recording register being completed?
H. CCTV/Jetting
-
H1. Is the current activity CCTV/Jetting?
-
H1.1. Have the Safe Work Method Statements been identified for this process?
-
H1.2.1. Have employees been instructed on Work Instruction WI034 High Pressure Water Jetting Mainlines?
-
H1.2.2. Have employees been instructed on Safe Work Method Statements WMS003 Clean and CCTV Sewer Conduit?
-
H1.3. Is the jetted hose in good condition?
-
H1.4. Is access to the vehicle acceptable?
-
H1.5. Is there a 110mm gap to prevent backflow from the jetted reservoir?
-
H1.6. Is there a backflow prevention device on the stand pipe?
-
H1.7. Is there a current certificate for the backflow prevention device?
-
H1.8. Is quality QF063 Camera Ipex, Equipment Gas recording register being completed?
I. Traffic Control
-
I1. Is traffic control required on this site?
-
I1.1. Is there an approved traffic control plan in use?
-
I1.2. What is the Traffic Control Plan Number?
-
I1.3. Are advisory signs as per Traffic Control Plan selected?
-
I1.4. Is there a requirement for traffic controllers?
-
I1.5. Does the traffic controller have a current Traffic Controllers Certificate?
-
I1.6. Provide the traffic controllers name and licence number.
-
I1.7. Is there a requirement for a certified Traffic Control Agency?
-
I1.7.1 Do they have a traffic management plan on site that has been approved by the appropriate authorities?
-
I1.7.2 Are advisory signs as per the Traffic Control Plan?
-
I1.7.3 Provide controllers name and licence number?
-
I1.7.4 Has a representative of Kembla Watertech sighted the traffic control plan?
-
I1.8. Is the access around the worksite safe for the public?
-
I1.9. Is there a current speed reduction in place?
-
I1.9.1. Provide the Speed Reduction Certificate Number.
-
I1.10. Is there a current Council Permit or written Authorisation on site?
-
I1.11. Is there a current approved Police Permit on site?
-
I1.12. Are there adequate spare signs on site if required?
-
I1.13. Is there a copy of QF006 Traffic Control Site Appraisal on site?
-
I1.14. Is there a copy of QF015 Onsite Daily Inspection Checklist on site?
-
I1.15. Is there a copy of QF030-1 Traffic Control Management HIDRA on site?
-
I1.16. Are all traffic controllers correctly situated?
-
I1.17. Is there a qualified relief person on site?
-
I1.18. Are traffic controllers wearing correct vest or night overalls?
-
I1.19. Is signage in good condition?
-
I1.20. Do traffic controllers have escape routes?
-
I1.21. Are there night wands on site if required?
-
I1.21. Are pedestrians and cyclists catered for at site?
-
I1.22. Are pedestrian managers required at site?
-
I1.23. Are beacons and arrow boards on Traffic Control vehicles functioning correctly?
J. Signage
-
J1. Are there 2 'Pedestrians Watch Your Step' signs?
-
J2. Are there 2 'Part Road Closed' signs?
-
J3. Are there 4 'Dig Man Ahead' signs?
-
J4. Are there 2 chevron signs 'Left and Right'?
-
J5. Is there a 'Clients Information' sign on site?
-
J6. Is there a 'Confined Space Entry' sign?
-
J7. Is the signage in good condition?
K. Plant
-
K1. Is the plant/vehicle operator licensed?
-
K1.1. What is the Driver/Operators name?
-
K1.2. What is the Class of Drivers License or Work Cover Ticket number?
-
K2. Provide vehicle registration number.
-
K3. Provide registration expiry date.
-
K4. Perform visual inspection of plant.
-
K4.1. Tyres
-
K4.2. Headlights
-
K4.3. Indicators
-
K4.4. Tail Lights
-
K4.5. Brake Lights
-
K4.6. Horn
-
K4.7. Windscreen
-
K4.8. Windows
-
K4.9. Bodywork
-
K4.10. Hydraulics
-
K4.11. Towing Mechanism secure
-
K5. Is the cabin in a neat and tidy manner?
-
K6. Is there a spare tyre and jack for this unit?
-
K7. Is the 'DANGER' notice attached and clearly visible to the operator?
-
K8. Is the 'CAUTION' notice attached and clearly visible to the operator?
-
K9. Is there safe access onto or into the vehicle?
-
K10. Has the log book for the Truck Mounted Crane been completed for that day?
-
K11. Is the work area of the vehicle clean and tidy and is the equipment stored correctly?
-
K12. Does this plant tow a compressor/trailer
-
K12.1. What is the registration number?
-
K12.2. What is the registration expiry date?
-
K12.3. Tyres
-
K12.4. Indicators
-
K12.5 Tail Lights
-
K12.6. Brake Lights
-
K12.7. Towing Mechanism Secure
L. Scaffolding
-
L1. Is scaffolding in use on site?
-
L1.1. Is the scaffold more than 4 metres high?
-
L1.2. Provide the name of the person who erected the scaffolding?
-
L1.3. Sight the certificate of the above named person and record their certificate number?
-
L1.4. Is the scaffold secure and stable?
-
L1.5. Are there the required top and mid handrails attached (after 1.8metres)?
-
L1.6. Is the working platform fully decked?
-
L1.7. Are toe boards fitted?
M. Electrical
-
M1. Are electrical leads, portable equipment and plant tested and tagged?
-
M1.1. Are tags within their expiry date?
-
M2. Are portable generators, extension leads/power tools protected with an earth leakage device?
-
M3. Is the earth lead being used?
-
M4. Is the electrical log book on site for this vehicle?
-
M5. Is the electrical log book completed correctly
N. Slings
-
N1. Persons slinging loads competent?
-
N2. Correct slings used and in good condition?
-
N3. Is a lead rope used to control loads where necessary?
O. Housekeeping
-
O1. Is the work area tidy and are materials stored properly?
-
O2. Are all steam hoses checked for leaks?
-
O3. Are noise requirements being adhered to?
-
O4. Is all rubbish and cigarette butts removed from site?
-
O5. Are bins being used?
-
O6. Are start times being adhered to (No work prior to 0700h)?
-
O7. Are the steel fittings covered to eliminate burns?