Is there a valid Letter of Good Standing on file?
-
Notification of Construction Work been done and send to DOL?
-
Is there a Health and Safety Specification available and on file?
-
Is the relevant Mandatories in place and been signed? 37.2 /5.1
HEALTH AND SAFETY PLAN
-
Is there a site specific Health and Safety Plan on file? Is it communicated ?
-
Health and Safety Policy signed and communicated?
-
HSE Reviewed monthly?
APPOINTMENTS (HAS THE FOLLOWING BEEN APPOINTED)
-
16.1 Declaration
-
Competent Person 16.2?
-
Construction manager 8.1?
-
Sub Ordinate Construction Work Supervisor 8.7?
-
Risk Assessor?
-
Fall Protection Plan Developer?
-
Emergency Evacuation Controller?
-
Incident Investigator?
-
First Aider?
-
Fire Equipment Inspector?
-
Hand Tool Inspector?
-
Portable Electrical Tool Inspector?
-
Ladder Inspector?
-
Stacking and Storage Supervisor?
-
Excavation Supervisor?
-
Temporary works Supervisor?
-
Scaffold Erector?
-
Scaffold Supervisor?
-
Scaffold Inspector?
INCIDENT AND ACCIDENT INVESTIGATION
-
Relevant documentation on file for investigation? Sec 24
-
Accident reporting forms WCL 2 / WCL1
EMERGENCY PLAN AND PREPAREDNESS
-
Is there a site specific Emergency Evacuation Plan on file?
-
Is Emergency Contact Numbers available and are they displayed?
RISK ASSESSMENT
-
Is there a site specific and relevant Risk Assessment on file?
-
Risk Assessment reviewed monthly?
-
Has the Risk Assessment been communicated to all workers and proof on file?
Annex 3 Medicals
-
All staff annex 3 Medicals available?
-
Are they valid/ current?
-
Done by Competent person?
FALL PROTECTION PLAN
-
Is there a site specific and relevant Fall Protection Plan on file?
-
Fall Protection Plan been reviewed monthly?
-
Has the Fall Protection Plan been communicated to all workers and proof on file?
-
Is there equipment available for all workers according to the Fall Protection Plan (Safety Harnesses and other related equipment)?
INDUCTION TRAINING
-
Has all workers been inducted an proof on file?
-
Has all visitors been inducted and proof on file?
TOOLBOX TALKS/Dsti
-
Has Toolbox Talks been done weekly with all workers and proof available on file?
-
Is the Toolbox Talks done relevant to the work being done?
-
Dsti available for current tasks ?
REGISTERS AND CHECKLISTS (ARE THEY FILLED IN AND KEPT UP TO DATE)
-
Fire Fighting Equipment/
-
First Aid Box?
-
Hand Tools?
-
Portable Electrical Tools?
-
Ladders?
-
Fall Protection Equipment?
-
Personal Protective Equipment (PPE)?
-
Construction Vehicles / Plant?
-
Excavations?
-
Formwork and Support Work?
-
Scaffolding?
PERSONAL PROTECTIVE EQUIPMENT (PPE)
-
Has the relevant PPE been issued to all workers and proof that they signed for it available?
-
Training been given with regards to PPE according to the Risk Assessment and Fall Protection Plan?
SAFE GUARDING OF SITE AND / OR WORKING AREA
-
Barricading Affective?
-
Traffic Control Affective?
EXCAVATIONS
-
Correctly sloped and shored as per RA?
-
Correctly barricaded ?
-
Excess soil removed from sides?
-
Ladders used for entry and exit of deep excavation?
-
Inspection register.
HOUSEKEEPING AND STACKING AND STORAGE
-
Stacking and Storage done as per Safety Plan and RA?
-
No Tripping Hazards?
-
Walkways Unobstructed?
-
Effective Waste Removal?
PPE COMPLIANCE ON SITE (ARE THE FOLLOWING BEEN USED)
-
Workers - Safety Boots?
-
Workers - overalls ?
-
Workers - Hard Hats?
-
Workers - Fall Protection Equipment?
EMERGENCY EQUIPMENT
-
First Aid Box available on site?
-
Adequate Fire Fighting Equipment available on site?
SIGNAGE
-
Site signage (multi board , ect)
ABLUTION FACILITIES
-
1 x Toilet for every 30 Workers?
-
Seperate Male and Female Toilets?
-
Toilet Paper Available?
-
Water and Soap available to wash hands?
-
Is the Toilets Hygienic and Clean?
-
Site Supervisor / Manager
-