Title Page
-
Store Name.
-
Store Number.
-
PPM SOP Reference number(s).
- R1 ... Packs and condensing unit maintenance.
- R2 ... Gas condenser maintenance .
- R3 ... Counter
- R4 ... Remote Cabinets
- R5 ... Integral cabinets (excluding Williams
- R6 ... Williams Integral Cabinets
- R7 ... Cold Stores/ Cold Rooms
- R8 ... Refigeration Controllers
- R9 ... All Fixed Refrigerant Pipe Work And Insulation
- R10 ... Retarder Prover
- R11 ... Ice Machine
-
Metix Task Number(s).
-
Verisae Task Number(s).
-
Engineer
-
BEFORE STARTING WORK, RISK ASSESS YOUR WORKING AREA AND ENSURE YOU COMPLY WITH ALL HEALTH & SAFETY REGULATIONS.
-
This needs to be emailed to the following, DL_NOC-contractsupport-ppm@space-engineering.co.uk and c.c Darren.hogg@space-engineering.co.uk
-
Ensure you log on and off of Verisae in real time.
-
Pleas tick the relevant PPM task's and provide assets numbers for each task carried out.
- R1 ... Packs and condensing unit maintenance.
- R2 ... Gas condenser maintenance .
- R3 ... Counter
- R4 ... Remote Cabinets
- R5 ... Integral cabinets (excluding Williams
- R6 ... Williams Integral Cabinets
- R7 ... Cold Stores/ Cold Rooms
- R8 ... Refigeration Controllers
- R9 ... All Fixed Refrigerant Pipe Work And Insulation
- R10 ... Retarder Prover
- R11 ... Ice Machine
-
Do you need to arrange a return visit to complete the work?
-
If a return visit is required, please briefly explain why.
-
If a return visit is required, please call the PPM team/SME to arrange a date for a retun visit to complete the work once all spares are available.
-
Is the PPM complete?
-
Does any of the equipment need adding to the delapidation list?
-
Space for you to add any further information.
-
Store Managers Name and Signature.