Information

  • Installation Night

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Covid-19 Pre Install Checklist

  • Have all construction barriers been positioned to meet the Covid-19 guildlines set out by Sainsbury's

  • Have all Sanitiser stations been placed in reachable areas of the working area.

  • Do all trades onsite have correct Covid-19 PPE.

  • Please specify which company/person.

Signing In

  • Have all trades signed In and Out of the Store Visitors Book

  • Take Photograph

  • Have all trades signed In and Out of the ATL Site Register

  • Take Photograph

  • Have all contractors supplied their Donseed Numbers and have they been checked on the Donseed website

  • Have ISG completed their Permits To Work

  • Has the site board and barriers been set out

  • Take Photograph

  • Are all lifters fully charged and in full working order

Materials

  • Are all materials correct to pick list?

  • Are all materials undamaged

Cash Tube Pre Install Check

  • Is the Cashtube system in fully working order

  • Obtain Signature of Manager

  • Job Title

  • Name of manager

MAINBANK CHECKOUTS

  • Have all mainbank checkouts (as detailed on PreStart) been removed

  • Have all mainbank checkouts (as detailed on PreStart) been relocated

  • Take Photograph

  • Have all mainbank checkouts been renumbered to latest drawing (3 per till)

  • Take Photographs

  • Are mainbank checkout poles secure, level and free from damage

  • Are all dimensions correct to current drawing

  • State reasons for deviation.

Flooring Works

  • Has all flooring works been completed

  • Take Photographs

Self Service Checkouts

  • Have all SSC been delivered and staged

  • Take Photographs

  • Is all correct branding applied to self scan checkouts

  • Take Photographs

  • Are all SSC tri lights free from damage/scratches

  • Take Photographs

  • Have all SSC service poles been installed and free from damage

Workstations

  • Have all Workstations been installed/relocated, please state quantities

  • Have all workstation service poles been installed/relocated and free from damage

Hanging Signage

  • Has all hanging signage been installed/relocated to correct position

  • Take photo

Checkpoint Devices

  • Have checkpoint controller devices been removed from de-installed SCO and handed over

  • State QTY

  • State reason

  • Have checkpoint controller devices been removed from de-installed Manned Checkouts and handed over

  • State QTY

  • State reason

Covid-19 Post Installation Checklist

  • Have all welfare facilities used by contractors been sanitised

Signatures

  • Site Manager

  • Duty Manager

  • NCR Lead Engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.