Information
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checlist
-
Customer name:
-
Contact number
-
Contact email:
-
Coordinates / address
Wireless Checklist
-
Is there line of sight to one of our network sites?
-
Take a photo of the line of sight
-
Identify where our antenna will need to be installed to get line of sight
-
Take a photo of the installation position
-
Is landlord approval required for the installation or not?
-
Confirm if there are any body corporate rules as to visibility of our equipment
-
Record coordinates of installation position
-
Confirm the speed / capacity required
-
Does the customer have existing lan / wifi? Do they want to change to our lan equipment? (If not, explain where our responsibility will end)
-
If they do want our lan, how many AP's would be required?
-
Provide a floorplan sketch to validate suggested AP quantity
-
Confirm all areas where customer requires coverage e.g., Braai area, garage, pool area, workshop, etc.
-
Is only a breakout link required or are there other buildings to be connected?
-
If there are other buildings, record coordinates and names of all buildings
-
Is there line of sight between the buildings?
-
If not, discuss the option of a private fiber network
Fibre Checklist
-
Co-ordinates of client
-
capacity required
-
Public IP or not
-
Private fibre network (will require a lot of additional information determined by survey)
-
Confirm a suitable date and time for survey if fibre network required
Hosting service checklist
-
3CX Cloud Hosting?
-
3CX annual license?
-
Porta hosted extensions?
-
Hosted Call Recording - call cabinet (for encrypted recording)?
-
3CX mobile app required
-
Handsets required? Quantity?
-
Ensure you have completed the PBX facilities / features tab in detail
-
Complete the Features and Facilities module
Firewall Checlist
-
Does the customer require a firewall?
-
Is the customers network being abused?
-
What sites need to be blocked?
-
What applications or social media needs to be blocked?