Title Page
-
Conducted on
-
Location
-
Prepared by
-
Personnel on Site
Does your work involve any of the following Safe Work Method Statements (SWMS)?
-
Confined Spaces Entry
-
Complete HS-FRM-006 Confined Spaces Entry Permit
-
Is isolation (lockout/tagout) required?
-
Complete HS-FRM-021 Electrical Hazard Preventative Actions Checklist
-
Trenching and Excavation
-
Complete HS-FRM-003 Permit To Excavate
-
Working Near Live Services
-
Complete HS-FRM-011 Overhead Wire Assessment and Dial Before You Dig plans are on site and understood
-
Working at Heights Greater than 2m
-
Complete Working At Heights Permit Ect
-
Movement of Powered Mobile Plant
-
Complete Vehicle movement Plan
-
Working On or Adjacent to Roads
-
Ensure Traffic Management Plan is in place Ect
-
Demolition
-
Complete HS-FRM-018 Demolition Safety Checklist
-
Working On or Adjacent to Rail
-
Ensure rail permit is completed and adhered to
-
Working In, Over ar Adjacent to Water
-
Complete HS-FRM-013 Working In, On, Over or Adjacent to Water Checklist
-
Non Friable Asbestos Removal
-
Complete HS-FRM-020 - Asbestos Removal Control Plan Template
-
Working Near Energised Electrical Installations
-
Complete HS-FRM-021 Electrical Hazard Preventative Actions Checklist
Are any of the following supplementary safety requirements needed?
-
Is work being conducted near Overhead Powerlines/Communications assets?
-
Complete HS-FRM-011 Overhead Wire Assessment
-
Hot Work Permit
-
Complete HS-FRM-024 Hot Work Permit
-
Lifting Operations by Mechanical Means
-
Complete HS-FRM-014 Lifting Operations Checklist
Site Specific Photos
-
Photos of site
-
Task Supervisor
-
Team Member
-
Complete JSEA
-
Complete JSEA