General Safety/Health/ Environmental Controls

  • Postings: 300 log, Posters, Emergency Phone Numbers, Emergency Action Plan.<br>

  • Programs: Safety Policy, SDS's, HAZCOM, Bracing Plan, Training, Erosion Control Plan: SWPPP, ONE CALL, Confined Space Permit

  • First Aid: F/A Kit, BBP Kit, Eyewash Station Available.

  • Housekeeping/Sanitation/Ventilation: Potable Water, Washing Facility, Vermin Control, Toilets Acceptable, Dust buildup, Hazardous Gasses; CO, Lead, Asbestos.

  • Illumination: Proper lighting egress routes.

  • Signs, Signals and Barricades, Site Security.<br>

  • Proper PPE, Hardhat, Safety glasses, Dust Mask, Gloves, Boots, etc.

Subpart F Fire Protection

  • Fire Ext. General Conditions, Fire Ext. Hot Work, Hot Work Permit, Flammable Liquids, Fuel Gas Storage, ILSM, Temporary Heating.

Subpart H Material Handling/Storage

  • Storage of Material, Disposal of Material, Material Handling

Supbart I Tools

  • Hand Tools, Power Tools, Pneumatic hose secured, Guards in place

Subpart J Welding and Cutting

  • Guages, Hoses and Tanks acceptable and secured, Fire Prevention, Weld Cables,

Subpart K Electrical

  • LOTO, Temp Light, Cords and conductors acceptable, Panels Labeled and secure, Wiring Methods, Guarding of live parts

Subpart L Scaffold

  • Scaffold: Mudsill, Base plate, Wheels Locked, Level, Braced, Fully Decked, Access @2', Guardrail @10', Secured from displacement, Loaded properly

  • Scissors Lift, Chain Secure, Feet on Platform, Inspected<br>Aerial Lift, Feet on Platform, Fall Protection

Subpart M Fall Protection

  • Fall Prevention: Guardrails 42", Midrail 21", Toeboard. Hole Covers, Safety Nets, Warning Line, CAZ, Limited access Zone

  • Fall Arrest/Positioning Systems: Proper Anchorage, Harness, Lanyard, Retractable, Rope Grab, ETC.

Subpart N/CCC Cranes, Derricks, Hoists, Elevators

  • Operator Certified, Annual and Daily Inspection, Stable Foundation, Swing Radius Barricaded, Signal Person and Rigger Qualified

  • Rigging, Critical Lift Plan, Assembly, Disassembly Plan, Overhead Power, Traffic Control and Public Protection, Hoisting Personnal

Subpart O Motor Vehicles and Equipment

  • Training Card, Seat Belt, ROPS, Backup Alarm, Signage, Inspection

Subpart P Excavation

  • Protective Systems ie. Benching/Sloping/Shielding 4', Access/Egress at 4', Inspection of Trench, One Call?, Barricade, Traffic Control, High Vis. Clothing, Spoil Pile/ Falling loads, Adjacent Structure

Subpart Q Concrete and Masonry

  • Bracing Plan, Post Tension, Shoring/Reshoring Plan, Impalement Protection, Pump Truck Safety,

Subpart R Steel Erection

  • Fall Protection/CDZ, Erection Plan/Bracing Plan, Hoisting and Rigging, Steel Assembly, Anchor Bolts, Overhead Protection, Falling Object Protection

Subpart T Demolition

  • Demo Plan, Asbestos/Lead Survey/PCB Survey, Engineering Survey, Shoring/Bracing, Dust Control, Material Removal

Subpart X Stairway and Ladder

  • Extension Ladder secured/extended 36" above landing, Proper ladder use, Inspection.

  • Stairways, pans filled, handrail, Landing Guardrail, No storage in Stairway.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.