Title Page
-
Conducted on
-
Prepared by
-
Location
Abrasive Grinding
-
Using safety guard
Access
-
Walkways clear
-
Adequate ladders
-
Runway access across large area
-
Proper use of stair tower
Air Circulation
-
Available fresh air
Air Tools
-
Safety shutoff (hose < 1/2")
-
Hose retainer at tool
-
Wire safety at hose connections
Attitude
-
Positive and safety focused
Bar Joists
-
Fully secured before accessing
Bolts
-
Proper site storage
-
2 bolts per connection during erection
Compressed Gas Cylinders
-
Proper rack storage (2+ bottles)
-
Caps on all cylinders
-
Cylinders are upright and secured
-
Fully operational regulators
-
Flashback arrestors at gauge & torch end
Cranes & Derricks
-
Load chart available
-
Cab glass in good condition
-
Minimum 10' distance from power lines
-
Protected swing radius
-
Properly installed mats in good condition
-
Outriggers used correctly
-
2 block system operational
Electrical
-
GFCI on all chords/AEGCP color code in use
-
Wires with damaged grounds out of service
-
Acceptable repairs
Equipment Operation
-
Safe operation observed
Eye/Face Protection
-
All employees wearing safety glasses
-
Burning goggles/glasses or shields in use
-
Welding hoods in use
Fall Protection - Personal
-
Proper static line use
-
Proper harness and belt operation
-
Proper D ring placement
-
2 lanyards for 100%
-
Max untied fall distance of 6 feet
-
5400lb tie-off capacity
-
Retractable reels - maintained and used
Fall Protection - Temp Floors
-
Tightly planked and secured openings
-
Removal of deficient planks/boards
-
Cable at 42" minimum height
-
Cable min 1/2" diameter
-
Static lines - min 3 cable clamps each end
Fire Protection
-
Proper amount of 10lb fire extinguishers
-
Proper placement of fire extinguishers
-
Current extinguisher tags
-
Empty extinguishers off-site
First Aid
-
Qualified individual on site
-
Emergency vehicle access
-
First aid kit readily available
Flaggers
-
Wearing reflective vests
-
Using proper equipment
Flame Cutting
-
Hot work permits obtained
-
Proper PPE
-
Protection of combustible materials
Flammable/Combustible Liquids
-
Approved containers in good condition
-
No smoking area sign
Forklift
-
Using seatbelts
-
Backup alarm operational
-
Horn operational
-
Proper rollover protection
Fumes, Dust, and Vapors
-
Avoid
-
Proper respirator if necessary
Hand Tools
-
Worker posses min. tool requirements
-
Bolt bags have no holes
-
Bull pins and drift pins not mushroomed
-
Beater handles not cracked or splintered
Hard Hats
-
All employees wearing hard hats
-
All hard hats in good condition
Hearing Protection
-
Worn properly as required
Hoists - Material
-
Proper use
Hoists - Personnel
-
Proper use
Hooks
-
All have safety latches
-
Correct size and capacity
-
Shakeout hooks in proper condition
Horseplay
-
Prohibited
Housekeeping
-
All site debris and scrap removed
-
Clean trailer/connex
Ladders
-
36" extension above landing
-
Proper climbing angle
-
Defected ladders removed from site
-
Both feet in tact and properly used
Lasers
-
Properly operating
-
Warning signs posted
Lifting - Personnel
-
Proper position using knees
Metal Deck Installation
-
Single span sheets properly welded
-
Cantilever sheets properly welded
-
Employees following leading edge procedure
-
Loose bundles tied down in wind
Motor Vehicles
-
Visually good condition
-
Backup alarm are operational
Openings - Permanent Floors
-
Proper safety cable, guardrails, & toe boards
-
Covers are clearly marked "HOLE"
Personal Protective Equipment
-
Proper safety footwear
-
Proper work pants and shirt
-
Proper work gloves
-
Ear Protection - if required
Powder Actuated Tools
-
Certified operator
-
Unattended tool unloaded
-
Proper clean-up of cartridges
Protection Of Civilians
-
Proper signage
-
Barricades, fences, lighting
Radioactive Materials
-
Avoid
Respiratory Protection
-
Training prior to use
-
Proper use
Scaffolding - General
-
Scaffold boards all cleated
-
Tightly planked for full width
-
Proper guardrails and toe boards
-
Tied off if above guardrail height
-
Screens if above traffic or pedestrians
-
Proper access to and from scaffold
Scaffolding - Mobile
-
Locked casters when stationary
-
Properly moved when required
Scaffolding - Swinging
-
Correctly ties off to structure
Shakeout
-
Dry and level area
-
Bar joists stacked less than 2 high
-
Deck bundles stacked less than 4-5 high
-
Personal not standing between iron
-
Beam centerlines clearly marked
Signs
-
Employees are aware and obey
Stairs
-
Handrails in place
-
Tread inserts in place
-
Stairs are clear from obstacles and debris
Storage
-
Not blocking access
Tag Lines
-
Proper size
-
Proper use
-
250lb min hook capacity
Welding
-
Leads in good condition
-
Properly grounded
-
Satisfactory cable and clamp repairs
-
No defects within 10 feet of electrode holder
Wire Chokers and Other Rigging
-
Rigging in good condition
-
Rigging properly stored when not in use
-
Cable clamps saddled correctly
-
Special rigging properly used & good condition
Recordable Information
-
OSHA 300 log for previous year
-
OSHA 300 log for current year
-
OSHA standards poster
-
GHS Program with SDS sheets
-
Emergency contacts
-
Emergency numbers
Documentation
-
Corporate safety plan
-
Corporate QA/QC manual
-
Corporate O.R.M. manual
-
Project specific safety plan
-
Project specific erection plan
-
Safety meeting minutes
-
First aid and CPR certification
-
Crane daily equipment inspection logs
-
Crane operator certification
-
Equipment usage forms
-
Equipment maintenance records
-
Safety orientation of new hires
-
WPS's are current and available
-
Copy of anchor rod survey
-
Bolt testing logs
-
Project specs or summary of specs
-
Current RFI log
-
Current revised drawing log
-
Copy of concrete compliance letter
-
Complete erection drawings available
-
Material certificates of conformance
Additional comments