Title Page

  • Conducted on

  • Prepared by

  • Location

Abrasive Grinding

  • Using safety guard

Access

  • Walkways clear

  • Adequate ladders

  • Runway access across large area

  • Proper use of stair tower

Air Circulation

  • Available fresh air

Air Tools

  • Safety shutoff (hose < 1/2")

  • Hose retainer at tool

  • Wire safety at hose connections

Attitude

  • Positive and safety focused

Bar Joists

  • Fully secured before accessing

Bolts

  • Proper site storage

  • 2 bolts per connection during erection

Compressed Gas Cylinders

  • Proper rack storage (2+ bottles)

  • Caps on all cylinders

  • Cylinders are upright and secured

  • Fully operational regulators

  • Flashback arrestors at gauge & torch end

Cranes & Derricks

  • Load chart available

  • Cab glass in good condition

  • Minimum 10' distance from power lines

  • Protected swing radius

  • Properly installed mats in good condition

  • Outriggers used correctly

  • 2 block system operational

Electrical

  • GFCI on all chords/AEGCP color code in use

  • Wires with damaged grounds out of service

  • Acceptable repairs

Equipment Operation

  • Safe operation observed

Eye/Face Protection

  • All employees wearing safety glasses

  • Burning goggles/glasses or shields in use

  • Welding hoods in use

Fall Protection - Personal

  • Proper static line use

  • Proper harness and belt operation

  • Proper D ring placement

  • 2 lanyards for 100%

  • Max untied fall distance of 6 feet

  • 5400lb tie-off capacity

  • Retractable reels - maintained and used

Fall Protection - Temp Floors

  • Tightly planked and secured openings

  • Removal of deficient planks/boards

  • Cable at 42" minimum height

  • Cable min 1/2" diameter

  • Static lines - min 3 cable clamps each end

Fire Protection

  • Proper amount of 10lb fire extinguishers

  • Proper placement of fire extinguishers

  • Current extinguisher tags

  • Empty extinguishers off-site

First Aid

  • Qualified individual on site

  • Emergency vehicle access

  • First aid kit readily available

Flaggers

  • Wearing reflective vests

  • Using proper equipment

Flame Cutting

  • Hot work permits obtained

  • Proper PPE

  • Protection of combustible materials

Flammable/Combustible Liquids

  • Approved containers in good condition

  • No smoking area sign

Forklift

  • Using seatbelts

  • Backup alarm operational

  • Horn operational

  • Proper rollover protection

Fumes, Dust, and Vapors

  • Avoid

  • Proper respirator if necessary

Hand Tools

  • Worker posses min. tool requirements

  • Bolt bags have no holes

  • Bull pins and drift pins not mushroomed

  • Beater handles not cracked or splintered

Hard Hats

  • All employees wearing hard hats

  • All hard hats in good condition

Hearing Protection

  • Worn properly as required

Hoists - Material

  • Proper use

Hoists - Personnel

  • Proper use

Hooks

  • All have safety latches

  • Correct size and capacity

  • Shakeout hooks in proper condition

Horseplay

  • Prohibited

Housekeeping

  • All site debris and scrap removed

  • Clean trailer/connex

Ladders

  • 36" extension above landing

  • Proper climbing angle

  • Defected ladders removed from site

  • Both feet in tact and properly used

Lasers

  • Properly operating

  • Warning signs posted

Lifting - Personnel

  • Proper position using knees

Metal Deck Installation

  • Single span sheets properly welded

  • Cantilever sheets properly welded

  • Employees following leading edge procedure

  • Loose bundles tied down in wind

Motor Vehicles

  • Visually good condition

  • Backup alarm are operational

Openings - Permanent Floors

  • Proper safety cable, guardrails, & toe boards

  • Covers are clearly marked "HOLE"

Personal Protective Equipment

  • Proper safety footwear

  • Proper work pants and shirt

  • Proper work gloves

  • Ear Protection - if required

Powder Actuated Tools

  • Certified operator

  • Unattended tool unloaded

  • Proper clean-up of cartridges

Protection Of Civilians

  • Proper signage

  • Barricades, fences, lighting

Radioactive Materials

  • Avoid

Respiratory Protection

  • Training prior to use

  • Proper use

Scaffolding - General

  • Scaffold boards all cleated

  • Tightly planked for full width

  • Proper guardrails and toe boards

  • Tied off if above guardrail height

  • Screens if above traffic or pedestrians

  • Proper access to and from scaffold

Scaffolding - Mobile

  • Locked casters when stationary

  • Properly moved when required

Scaffolding - Swinging

  • Correctly ties off to structure

Shakeout

  • Dry and level area

  • Bar joists stacked less than 2 high

  • Deck bundles stacked less than 4-5 high

  • Personal not standing between iron

  • Beam centerlines clearly marked

Signs

  • Employees are aware and obey

Stairs

  • Handrails in place

  • Tread inserts in place

  • Stairs are clear from obstacles and debris

Storage

  • Not blocking access

Tag Lines

  • Proper size

  • Proper use

  • 250lb min hook capacity

Welding

  • Leads in good condition

  • Properly grounded

  • Satisfactory cable and clamp repairs

  • No defects within 10 feet of electrode holder

Wire Chokers and Other Rigging

  • Rigging in good condition

  • Rigging properly stored when not in use

  • Cable clamps saddled correctly

  • Special rigging properly used & good condition

Recordable Information

  • OSHA 300 log for previous year

  • OSHA 300 log for current year

  • OSHA standards poster

  • GHS Program with SDS sheets

  • Emergency contacts

  • Emergency numbers

Documentation

  • Corporate safety plan

  • Corporate QA/QC manual

  • Corporate O.R.M. manual

  • Project specific safety plan

  • Project specific erection plan

  • Safety meeting minutes

  • First aid and CPR certification

  • Crane daily equipment inspection logs

  • Crane operator certification

  • Equipment usage forms

  • Equipment maintenance records

  • Safety orientation of new hires

  • WPS's are current and available

  • Copy of anchor rod survey

  • Bolt testing logs

  • Project specs or summary of specs

  • Current RFI log

  • Current revised drawing log

  • Copy of concrete compliance letter

  • Complete erection drawings available

  • Material certificates of conformance

Additional comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.