Satellite Inspection

  • Brighton Blades

  • Conducted on

  • Conducted by

  • Brighton Blades Facility

Shimoda

Shimoda 14 (hardener waste, machine flush)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Shimoda 15 (resin waste, RCRA M/T, hardener waste, machine flush)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Root Spar (epoxy clean & h2o, RCRA M/T, resin waste, hardener waste, aerosol cans)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Tank Farm (hardener waste, resin waste)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Shells (hardener waste)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

PPG (resin waste, epoxy clean &h2o, hardener waste, RCRA M/T)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Finish (RCRA M/T F15, porefiller waste F17, resin waste F02, hardener waste F02, resin waste F14 hardener waste F14, epoxy clean & h2o F14)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

PrePaint (paint and porefiller waste)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Spray Booth (paint mix waste E, paint mix waste W)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Flash Off (paint and porefiller waste)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

Final Assembly (paint and porefiller waste, hardener waste)

  • <55 gallons?

  • No equipment or materials?

  • Waste container labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Full containers moved to 90 day storage immediately?

90 Day Storage

  • Materials stored properly?

  • Waste containers labelled?

  • Has waste label (hardener waste, aerosols, pore filler waste)?

  • Container in good condition and not leaking?

  • Container closed and sealed?

  • Both container and contents stored to prevent rupture?

  • Waste is compatible with container type?

  • Incompatible waste types separated?

  • Adequate aisle space? Container not blocked?

  • Accumulation start date marked when full?

  • Materials moved to 90 Day Storage immediately?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.