Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Client Name
1. Site Conditions
-
1.1 Adequate welfare facilities, clean, tidy and maintained?
- Safe
- Fair
- Poor- Improvement required
- At Risk - Accumulation of waste materials and all surplus to be cleared and removed from the site by the relevant contractor.
- N/A
-
1.2 Adequate safety signage in place ?
- Safe
- Fair
- Poor- Improvement required
- At Risk - Accumulation of waste materials and all surplus to be cleared and removed from the site by the relevant contractor.
- N/A
-
1.3 Location and description of workplace (Including any plant, equipment or materials) inspected:
- Independent Tied Access Scaffold
- Loading Bay
- Access Staircase
- Protection Gantry
- Birdcage Scaffold
- Gin Wheel and Rope
- Harness and Lanyard
- Edge Protection Guard Rail
- HAKI Access Staircase
- Other
2. Scaffold Surroundings
-
2.2 Has public protection been provided?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
2.3 Are scaffolds erected a safe distance away from trenches or excavations?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
2.4 Is there safe access and egress to every scaffold platform?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
undefined
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
3. Scaffolding Structure
-
3.0 Location and description of the workplace (Including any plant, equipment or materials) inspected:
-
Location and description of the workplace (Including any plant, equipment or materials) inspected:
-
3.1 Are all baseplates and sole boards present and compliant ?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
3.2 Scaffold square, straight, and plumb in all directions?
- Safe fit for purpose
- Scaffold Pass with observations
- Scaffold not to be used
- Unauthorised Scaffold Modifications by Third Parties
- Other
- Scaffold Erect in Progress- Incomplete Scaffold not to be used by other trades!
- Scaffold Dismantle in Progress- Incomplete Scaffold not to be used by other trades!
-
3.3 Are scaff-tags fitted at all access/egress points?
-
3.4 Are Handrail and toe boards fitted where there is a risk of persons or materials falling?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
3.5 Do any areas of scaffold exceed the maximum clearance of 225 mm from exterior of building under construction?
-
3.5 Are working platforms suitable for the trades?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
3.6 Are all inside boards secured to prevent movement?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
3.7 Are scaffold boards free from defects?
- Safe
- At Risk
- Some boards are showing signs of warping and splitting to be monitored
- Unautorised Scaffold Modification- At Risk Urgent Corrective Action Required
- Other
- N/A
-
3.8 Are the scaffold ties correctly positioned and fixed per the design drawings?
-
3.9 Are plan /ledger/sway(façade) bracing in place and correct fitting used ?
- Pass
- Fail
- Improvement Needed
- N/A
-
4.0 Scaffold build as per design?
4. Housekeeping
-
4.1 Are working areas free of trip hazards?
- Safe
- Fair
- Poor- Improvement required
- At Risk - Accumulation of waste materials and all surplus to be cleared and removed from the site by the relevant contractor.
- N/A
-
4.2 Are all the spare materials in a neat and tidy condition?
- Safe
- Fair
- Poor- Improvement required
- At Risk - Accumulation of waste materials and all surplus to be cleared and removed from the site by the relevant contractor.
- N/A
-
Waste materials stored in designated bins or skips provided?
- Safe
- Fair
- Poor- Improvement required
- At Risk - Accumulation of waste materials and all surplus to be cleared and removed from the site by the relevant contractor.
- N/A
5. Documentation
-
5.1 Are the task-specific risk assessment and method statement present on-site?
-
5.2 Is there a hand over certificate in place?
-
5.3 Has the previous audit report been closed out?
6. Sign Off
-
6.1 Name of person completing this report.
-
Scaffolding Structure
- Safe fit for purpose
- Scaffold Pass with observations
- Scaffold not to be used
- Unauthorised Scaffold Modifications by Third Parties
- Other
- Scaffold Erect in Progress- Incomplete Scaffold not to be used by other trades!
- Scaffold Dismantle in Progress- Incomplete Scaffold not to be used by other trades!
I confirm the contents of this report have been discussed with myself and I am aware of any issues highlighted in the body of this report.
7. Closure
-
7.1 I confirm all actions highlight in this report have been actioned on:
Name of the person closing this report.
-
Add signature