Title Page
-
Document Number
-
Client / Site
-
Sub-Contarctor
-
Conducted on (Date and Time)
-
Prepared by
-
Location
-
Area inspected
GENERAL CHECKLIST & MATERIAL STATUS
-
Are all the sufficient scaffold components in place and without any defects?
-
Are the base plates in firm contact with mud sills and the frame of the scaffold?
-
Are all scaffold legs braced and braces properly attached to the scaffold?
-
Is the scaffold secured to the structure to prevent movement?
-
Are brackets, ledger, tubes, planks & accessories properly placed with wedges tightened?
-
Is a toe board properly installed when necessary?
-
Are all scaffold components and planking in an acceptable condition?
-
Are all planks correctly graded?
-
Is a qualified, competent person in charge of the erection/inspection?
-
Is the whole scaffold level and plumb?
-
Were screw jacks/ props used to level and plumb the scaffold whenever required?
-
Has the area around the scaffold been secured and safety signs installed?
-
Are all necessary guard rails in place on all open sides and ends?
-
Has there been a visual check to verify clamps are secured in place?
-
Is there proper access to get on and off the scaffold/deck?
-
Has "Don't Use" tag been placed at all access points where inspection failed?
-
Has the scaffold control tag been signed and approved for this particular use?
-
Do all planks/sole plates have a minimum of 233mm width and extend 300 beyond supports?
-
Is the ladder secured and in place?
SOFFIT SUPPORT
-
Are head jacks fit and at the correct runouts?
-
Main beams are double or spliced accordingly?
-
Are all beams without defect and fit for use?
-
Are all plywood without defects?
-
All plywood sufficiently secured?
-
Handrails and Holder in place?
-
Are all stopends in and secured correctly?
-
Are flying shutters in and secured correctly?
STATUS OF ENGINEERING
-
Has the drawing been supplied to site?
-
Is the design sufficient for required work?
-
Was is designed by a competent individual?
-
Was the design followed?
-
Was the structure erected by a competent team?
COMPLETION
-
Diviations
To be rectified
-
Add media
-
Recommendations
-
Formwork Supervisor
-
Full Name and Signature of the Inspector