Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Document No.

1.0 - Site File Compliance

  • 1.1 - Is the pre start checklist in place ?

  • 1.1.1 - Has the Pre Start Checklist been filled in ?

  • 1.2 - Is the Method Statement & Risk Assessment in place ?

  • 1.2.1 - Has the Method Statement & Risk Assessment been signed by all operatives

  • 1.2.2 - Have the Method Statement & Risk Assessment been reviewed within the last 6 Months and or still adequate and task/risk specific? <br>

  • 1.3 - Have the Sign in sheets been filled in by all operatives on a daily basis ?

  • 1.4 - Are Daily Diaries being completed on a daily basis ?

  • 1.5 - Are tool box talks being carried out each week ?

  • 1.5.1 - Are tool box talks being recorded to a sufficient level?

  • 1.6 - Have All scaffolds been inspected in the past 7 days ?

  • 1.6.1 - Are Scaffold Inspection sheets kept in the site file ?

  • 1.7 - Have all Harness inspections been carried out in the last 7 days ?

  • 1.7.1 - Are harness inspection records being maintained in the safety file ?

  • 1.8 - Are time sheets being kept in the site file ?

  • 1.9 - Are Previous site safety audits being stored in the site file?

  • 1.10 - Are Anchor tests reports being stored in the site file?

  • 1.11 - Are Training records being updated and stored in the site file?

  • 1.12 - Is the Accident / Incident / Near miss paperwork up to date ? <br>

  • 1.12.1 - Has their been any Accident on the project since last visit?

  • 1.13 Has the LOLER register been maintained?

  • 1.14 - Has the HAVS register Been maintained?

  • 1.15 - Has the PPE register been maintained ?

  • 1.16 - Are Emergency Procedures & First Aid Arrangements in place ?

  • 1.17 - Are the company Policies and procedures in the site file ?

  • 1.17.1 - Is their an up to date copy of Insurance in the site file ?

  • 1.18 - Has PAT testing been carried out in the last 3 months ?

  • 1.19 - Are the most recent revision of drawings onsite ?

  • 1.19.1 - Has the Temporary works register been maintained?

  • 1.20 - Is the overall site file to an acceptable standard?

2.0 - Foundations

  • 2.1 - Ground conditions can take the weight of the scaffolding

  • 2.2 - No evidence of sinkage

  • 2.3 - Scaffolding not erected on manhole covers

  • 2.4 - Scaffolding not erected over excavations

  • 2.5 - scaffolding not erected near trenches

3.0 - Footings ( Base Plate & Sole Boards )

  • 3.1 - Are sole boards he correct dimensions

  • 3.2 - Are base plates fitted correctly

  • 3.3 - The footings are not damaged

4.0 - Standards

  • 4.1 Are standards correctly spaced ( as per design or TG20 )

  • 4.2 - Are couplers ( sleeves ; joints ) staggered ?

5.0 - Ledgers

  • 5.1 - Are he ledgers Horizontal ?

  • 5.2 - Are joints staggered ?

6.0 - Transoms

  • 6.1 - Are Transoms horizontal?

  • 6.2 - Have right angle couplers used (as required) ?

  • 6.3 - Are transom spacing correct for support of the board and as per design ?

  • 6.4 - tubes are at least 50mm pass the coupler?

  • 6.5 - is the working platform wide enough and to design ?

7.0 - Edge Protection & General Protection

  • 7.1 - top Handrail fitted at correct height?

  • 7.2 - Intermediate rails fitted at the correct height?

  • 7.3 - toe boards fitted to all elevations including haki staircases

  • 7.4 - Gates and operable?

  • 7.5 - Edge protection secured and undamaged. <br>

  • 7.6 - Trapdoors fitted in platforms were applicable?

8.0 - Boards

  • 8.1 are boards free from all defects?

  • 8.2 - Are all boards still in the correct position and not be tampered by others on site ?

  • 8.3 - are boards secured where applicable?

  • 8.4 - Are boards correctly supported by the Transoms?

  • 8.5 - Are boards placed so they don't cause slips , trips and falls ?

9.0 - Bracing

  • 9.1 Facade bracing been fitted correctly?

  • 9.2 - Ledger bracing been fitted correctly?

  • 9.3 - Plan bracing fitted where applicable

  • 9.4 - Are correct couplers fitted?

10.0 - Ladders

  • 10.1 - Are the ladders adequate length and raise above the platform 1.00mtrs?

  • 10.2 - Are ladders correctly secured?

  • 10.3 - Are all ladders undamaged?

  • 10.4 - have ladders been inspected within the last three months?

  • 10.5 - Are all ladders set at the correct angle i.e 1 to 4

11.0 - Security and Protection

  • 11.1 - is public protection adequate?

  • 11.2 - is the means to prevent public access adequate ?

  • 11.3 - safe passage available to the public

  • 10.4 Signage adequate and fixed into place?

12.0 Ties

  • 12.1 - Are ties fitted to right angle couplers ,

  • 12.2 - is pull testing up-to date as per company policy ( 10 percent) ?.

  • 12.3 - Is he tie certification in the site health and safety folder?

  • 12.4 - Have ties been fitted as per scaffolding design ?

13.0 Miscellaneous

  • 13.2 scaffolding structure has been designed and erected to the specification ?

  • 13.3 - SWL of scaffolding has not been exceeded?

  • 13.4 - monarflex / debris netting fitted correctly and tidy ?

Quality Inspection Check sheet

  • Are Exclusion zones being maintained ?

  • Have all Actions been closed out from the previous visit , if not detail those outstanding!

  • Have all personnel completed Alandale Plant & Scaffolding induction?

  • Does the site have adequate cover on site when Alandale Site Supervisor is off?

  • Are harness been worn correctly by operatives ?

  • Does the lorry have a lifting plan when on site , does he require one ?

  • Is house keeping on site to a good standard ?

  • Is the welfare facilities on site to a good standard and conform to the HSAW act ?

  • Warning signs have been erected i.e locations and elevations.

  • Are all scaffolding operatives been issued with tether tools ?

14.0 - Details of issues arising from this scaffolding inspection

  • 14.1. Recommendations/Personal Responsible /Target Date

15.0 - details of actions to be taken.

  • 15.1 - Details of actions taken by competent persons to rectify issues/ date / completed

Sign Off

  • Site Score

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.