Information

  • Site Address:

  • Contact Name:

  • Site Reference Number:

  • Walk Off by:

  • Date of Visit:

Network Cabling Installed

  • Site Code Identifier:

  • PSTN Number:

  • BT Smart Hub (Router) Location:

  • BT Smart Hub (Router) Photo

  • Number of AP's Installed?

  • AP1 Location

  • AP1

  • AP1 Speed Test Result

  • AP1 Data Cabling length (m)

  • AP1 MAC Address

  • AP1 MAC Address

  • AP1 Serial Number

  • AP1 Serial Number

  • Additional AP

  • AP2 Location

  • AP2

  • AP2 Speed Test Result

  • AP2 Data Cabling length (m)

  • AP2 MAC Address

  • AP2 MAC Address

  • AP2 Serial Number

  • AP2 Serial Number

  • Additional AP

  • AP3 Location

  • AP3

  • AP3 Speed Test Result

  • AP3 Data Cabling length (m)

  • AP3 MAC Address

  • AP3 MAC Address

  • AP3 Serial Number

  • AP3 Serial Number

  • RJ45 Boots installed on Data cabling

  • NEW EE 4G Hub Connected?

  • NEW EE 4G Hub photograph

  • New Shelf installed

  • Photograph of Shelf and Equipment

  • Reason for not installing new shelf / Location of Equipment

  • Photo of Equipment

  • NEW 6 Way PDU (power distribution unit) Installed

  • Photo

  • NEW Switch Installed

  • Photo

  • NEW POE's Installed

  • NEW POE's Installed (Photos)

  • NEW Patch cables installed

  • Photo

  • NEW Do Not Turn off Stickers installed on 6 way Mains plug

  • Photo

  • All Cabling Neat and Tidy

  • Any Additional Materials/ Equipment Supplied i.e Trunking etc

  • Any Additional Materials/ Equipment Supplied i.e Trunking etc

  • If Plastic Trunking has been installed - cabling all supported with metal fixings

  • Photo (sections before lid replaced)

  • Images of all installed APs sent to BT (SCR) venue.wi-fi@bt.com

  • Images of speed test and landing page sent to BT (SCR) venue.wi-fi@bt.com

  • Images of MAC address of Each AP sent to BT (SCR) venue.wi-fi@bt.com

  • Image of Hub Management screen sent to BT (SCR) venue.wi-fi@bt.com

  • Photo

  • BT sign off completed (pg. 16 of Installer Instruction Issue 3.3) and returned to email address? venue.wi-fi@bt.com

  • Copy of SCR Sent to SCCI BTWiFi@sccialphatrack.co.uk

Snagging

  • Any outstanding issues / snagging

  • Please outline and provide details

  • Photos of outstanding remdial work

  • Generic system design if different from standard spec?

  • Provide details

  • Photographs

System Design

  • Generic System Design

    Costa Coffee.JPG
  • Any additional photographs

Sign Off

Sign Off

  • Customer Name

  • Customer Job Title

  • Date

  • Is the customer happy to score the work?

  • Please rate the work (1 = Poor, 3 = Average, 5 = Excellent)

  • SCCI Engineer

  • Completed Sign Off

  • SCCI Clearcode (required for Invoice Please acquire clearcode before you leave site)

  • Time left home/office

  • Time arrived on site

  • Time completed on site

  • Time arrived at Home/Office

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.