Information
-
Site Address
-
Postcode:
-
Job Reference:
-
Walk Off by:
-
Date of Walk Off:
Site Information
Site Information
-
Number of Dwellings
-
Number of Floors
-
Photo of building / block
-
Has the job pack design been followed?
-
Has the RAMS sign off form been submitted?
-
Has the site been left clean and tidy?
Fire regulations site info
-
Please note that when installing Fire Clips in trunking you are expected to install then at 300mm up to 1m either side of the door/opening. At a change in direction or in a corner a clip shall be fitted within 150mm from the corner in either direction. On continuous long runs the maximum spacing of 1m shall not be exceeded.
-
Have you had to install trunking on this job?
-
Please provide pictures of the trunking installed.
-
Quantity of trunking (metres)?
-
Have you installed fire clips on the trunking or cable above any doors or fire exits?
-
Please provide photos of fire clips
-
Have you installed ceiling hatches?
-
Please provide photographs
-
Quantity of hatches?
-
Have you run drop cables internally or externally?
-
Please provide photographs of cable routes
-
Did you have to install cables on the external walls of the building across door and fire exits ?
-
Please provide pictures of the fire clips installed above any doors or fire exits.
-
Have you had to carry out any fire stopping?
-
Has the fire audit been completed accurately?
-
Quantity of drill holes in brick / concrete?
-
Quantity of drill holes in plaster board / fire board?
DP Information
-
Number of DP's
-
DP number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP Location
-
Serves properties
-
Photographs of DP
-
Photographs of cables within DP
-
Notes
-
Additional DP's
-
DP number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP Location
-
Serves properties
-
Photographs of DP
-
Photographs of cable
-
Notes
-
Additional DP
-
DP number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP Location
-
Serves properties
-
Photographs of DP
-
Photographs of cable
-
Notes
-
Additional DP
-
DP number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP Location
-
Serves properties
-
Photographs of DP
-
Photographs of cable
-
Notes
-
Additional DP
-
DP number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP Location
-
Serves properties
-
Photographs of DP
-
Photographs of cable
-
Notes
-
Additional DP
Network Readiness
-
Is the City Fibre network ready?
-
Is the SN / Street Cabinet Built?
-
Photograph of Street Cabinet
-
Toby / Incoming duct / BFT visible?
-
Has all build work been completed in preparation for splicing?
-
What work is required prior to splicing?
Sign Off
Sign Off
-
Were there any issues onsite?
-
Is there any unfinished build work left to do at this site?
-
Name
-
Completed Sign Off