Information
-
Site Address:
-
Contact Name:
-
Site Reference Number:
-
Walk Off by:
-
Date of Visit:
Network Cabling Installed
-
Site Code Identifier:
-
PSTN Number:
-
Data Cabling to Supply, install
- AP1
- AP2
- AP3
-
BT Smart Hub (Router) Location:
-
BT Smart Hub (Router) Photo
-
AP1 Location
-
AP1
-
AP2 Location
-
AP2
-
AP3 Location
-
AP3
-
NEW 4 Way PDU (power distribution unit) Installed
-
Please state reason
-
NEW 4 Way PDU (power distribution unit) Installed
-
NEW Switch Installed
-
Please state reason
-
NEW Switch Installed
-
BT sign off completed (pg. 16 of Installer Instruction Issue 3.2) and returned to email address? venue.wi-fi@bt.com
-
Images of all installed APs sent to BT? venue.wi-fi@bt.com
-
Images of Speed Tesst sent to BT? venue.wi-fi@bt.com
Snagging
-
Any outstanding issues / snagging
-
Please outline
System Design
-
Generic System Design
-
Photograph of as built cable (hand drawn sketch on white paper)
Sign Off
Sign Off
-
Customer Name
-
Customer Job Title
-
Date
-
SCCI Engineer
-
Completed Sign Off