Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Audit Report
-
Has the previous audit report been closed out?
-
Have all previous issues been cleared?
Management Controls
-
Have appropriate signs/notices been erected around the site i.e. mandatory use of PPE, Incomplete Scaffolds, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc.
-
Are all operatives familiar with the requirements of the site safety rules and that they are complied with on site.
-
Are SCCIA activities adequately supervised, paying particular attention to work activities as undertaken by young persons and/or those which are high risk activities.
-
Are site safety rules are displayed in a prominent position e.g. reception, canteen, site office etc.
-
Ensure all subcontractors have been assessed and are adequately resourced and competent for the work they are undertaking.
-
Ensure all site operatives, including sub-contractors have a valid CSCS/SKILL card.<br>
-
Ensure operatives CSCS/SKILL cards/registration are appropriate for the work being undertaken
-
Management controls compliant?
Access and Egress
-
Is there safe access and egress to all working areas of the site?
-
Have pedestrian walkways been provided to protect them from moving vehicles?
-
Are walkways free from obstructions and stored materials?
-
Are access routes adequatelly lit?
-
Access and Egress compliant?
Cartridge Operated Tools
-
Are the manufactures instructions being followed?
-
Has the operator/s been properly trained?
-
Is the operator/s wearing eye protection?
-
Is the gun cleaned regularly?
-
Are the gun cartridges keep secure when not in use?
-
Is the use of cartridge tools compliant?
Consultation
-
Has a system been established for employees to comment and be consulted on health, safety and welfare issues.
-
Is there a site suggestion box?
-
Is there a safety joint committee / forum / Joint H&S meeting.
-
Are minutes and actions from meeting available and published on site?
-
Are Tool Box Talks given to all operatives and that the Tool Box Talks are appropriate and relevant to the work being undertaken.
-
Has an attendance register been maintained and signed by all persons present at each Tool Box Talk.
-
Consultation compliant?
Control of Substances Hazardous to Health (COSHH)
-
Have COSSH Assessments been carried out for all potentially hazardous materials and substances being used on the site.
-
Are material safety data sheets available to assist with COSHH assessments.
-
Have the hazards associated with the use of such materials been properly communicated to those affected.
-
Are alternative safer substances available which can be used as substitutes.
-
Ensure all dangerous/hazardous materials/Substances are clearly marked/identified and stored in a secure location appropriate to the substance.
-
Have the appropriate control systems and PPE been provided and is the PPE being used.
-
COSHH Compliant?
Electrical Equipment
-
Check that only 110v /battery/cartridge hand tool etc are in use.
-
Check that cables and leads are protected from damage.
-
Check that tools and equipment are visually checked and regularly inspected/tested by a competent person. (PAT)
-
Ensure that cables and trailing leads are not trip hazards.
-
Ensure that suitable and sufficient task lighting is provided to enable operatives to safely carry out their work.
-
Electrical Equipment compliant?
First Aid
-
An appropriate number of trained and qualified first aiders should be available on the site.
-
Check the number of first aiders required, this is dependent on the type of work or operations, the number of workers on site and any special or unusual hazards.
-
Are the names of all first aiders detailed on the site notice board?
-
All first aiders should be clearly identified on site through the use of an appropriate helmet sticker or labelled HiVis.
-
The location of the first aid box should be indicated on the site notice board and the door of the room in which it is contained. Are they clearly indicated?
-
The First Aid box should be;
-
Marked with a white cross on a green background.
-
Be placed where it can be seen and used.
-
Be checked and replenished on a regular basis.
-
Are new staff made aware of its location as part of their induction?
-
First Aid requirements compliant?
Housekeeping
-
Ensure all equipment and waste is removed from the work area upon completion of the work or at the end of each shift.
-
Ensure Debris is not be allowed to collect around the site.
-
Ensure staff adopt the philosophy of 'A tidy site is a safe site'.
-
Ensure materials are stored in an appropriate manner so as not to cause damage to the material.
-
Are damaged materials segregate to prevent them being used?
-
Ensure all waste receptacles are appropriately signed for their intended contents.
-
Housekeeping compliant?
Health & Safety Management
-
Is an emergency plan defined and in place complete with emergency contact numbers?
-
Is the plan meaningful and communicated to all parties, including sub contractors?
-
Health and Safety Management compliant?
Induction
-
Have all staff received a site specific safety induction before starting work.
-
Ensure all staff who have been inducted display an induction sticker on their safety helmet or wear a photo identification badge.
-
Are site safety inductions being adequately carried out both for staff and visitors?
Low Level Access Including Steps and Podiums
-
Are podiums used before steps are allowed?
-
Are operators trained in the use of podiums?
-
Are podiums maintained and inspected regularly and display tag.
-
Are podiums free from defects?
-
Are steps class 1 as defined in EN131?
-
Is there a risk assessment in place for the use of steps?
-
Is a permit system in place?
-
Low level access compliant?
Manual Handling
-
Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.
-
Check the suitability of using trollies, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.
-
Ensure all staff have received manual training.
-
Manual Handling compliant?
Mobile Scaffold Towers
-
Check that proprietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.
-
Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.
-
Are they tagged safe for use?
-
Mobile Towers compliant?
Occupational Health, HAV'S, Noise and Associated Health Risks
-
Check that workers have had information and training so that they know what the risks are from HAV.
-
Check that exposure to HAV has been reduced as much as possible by selecting suitable work methods and Plant.
-
Ensure reduced-vibration tools are used wherever possible.
-
Check vibration tools are properly maintained.
-
Limit the exposure of persons to HAV by ensuring that no person uses vibrating tools for longer than the manufactures guided times.
-
Noise - As a general rule, if you: - have to shout to be heard at a distance of 2m, the noise level is approx 85dB and you should consider wearing hearing protection.
-
- have to shout to be heard at a distance of 1m, the noise level is approx 90dB and you should definitely wear hearing protection.
-
Ensure that workers have had training so they are aware of the risks from noise on site and what they need to do to avoid these risks.
-
Check whether the noise can be reduced by using different working methods or selecting quieter plant e.g.: by fitting breakers and other plant or machinery with silencers.
-
Preventative maintenance can also help to reduce the noise caused by wear and tear on plant and machinery.
-
Ensure that people not involved in the work are kept away from the source of the noise.
-
Occupation health, HAV'S, Noise and associated risks compliant?
Permits to Work
-
Hot Works - Hot Works include welding, oxy-acetylene cutting, use of angle grinders/skill saws etc.
-
Ensure all Hot Works Permits have been checked and reviewed and are valid for the work conditions.
-
Ensure suitable and sufficient fire prevention measures are in place, including the removal of all combustible materials, the use of fire blankets and fire extinguishers.
-
Ensure old permits have been cancelled and closed.
-
Work at Height/Roof Permits
-
Ensure all Work at Height permits have been checked reviewed and are valid for the work conditions
-
Ensure that rescue plan is sufficient if necessary
-
Check old permits have been cancelled and closed.
-
Permits compliant?
Personal Protective Equipment (PPE)
-
PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.
-
Ensure that PPE is issued on an individual basis.
-
Ensure that it is suitable for the type of work being undertaken.
-
Check that the PPE is marked with the genuine 'CE' mark to help identify type of protection.
-
Check that it is kept in good condition.
-
Ensure that it is appropriately replaced.
-
Ensure all operatives are wearing Hi-Viz vests or jackets.
-
Eye Protection
-
Ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.
-
Check that it is kept in good condition.
-
Foot Protection
-
Ensure that footwear is fitted with steel toecaps and steel sole plates.
-
Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.
-
Are all gloves free from damage?
-
Ensure gloves are the correct size.
-
Ensure gloves are correct for their application and the activity being undertaken.
-
Check that hands are washed frequently after spells of work.
-
Hearing Protection
-
Ensure the correct type of protection is in use for the task.
-
Ensure that hearing protection is used as instructed.
-
Where ear plugs are in use ensure the correct size ear plugs are being worn.
-
Ensure that hearing protection is kept clean and checked regularly for damage.
-
Ensure Areas which are mandatory hearing protection zones are signed as such using the appropriate signs.
-
Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.
-
Ensure that the correct type of respiratory equipment is used for the works being undertaken.
-
Ensure that persons are trained for the use of the RPE and where applicable have a face fit test to ensure the effectiveness of the RPE.
-
Ensure that all equipment is cleaned and checked after use.
-
Safety Helmets
-
Ensure all operatives are wearing safety helmets.
-
Are all helmets found free from damage?
-
Ensure helmets are tethered where required.
-
Were helmets within their expiry date - helmets should be changed every 2-3 years.
-
PPE requirements compliant?
Equipment
-
Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.
-
Ensure towers and podiums are locked to prevent unauthorised use or theft.
-
Hand tools
-
Ensure that the right tools and equipment are being used for the right job.
-
Power Tools
-
Ensure operatives have been trained to use the tools/equipment they are using.
-
Were all hand tools found to be in good condition with no defects?
-
Check that all dangerous parts are guarded e.g. gears, chain, drives, projecting engine shafts etc.
-
Check that guards are secure and in good repair.
-
Ensure that the tools are in a good state of repair and carries appropriate safety symbol e.g. BS kite mark, CE Mark etc.
-
Check that safety devices are operating properly and that all cables are double insulated.
-
Check that tools are 110 volt and that a residual current device (RCD) is used for additional protection.
-
Ensure that the plug is of the correct type, undamaged and securely clamped to the cable.
-
Check the supply cable for cuts, splits or other damage. All all cables free from damage?
-
Ensure that all operators are trained and competent.
-
Equipment compliant?
Risk Assessments and Method Statements
-
Ensure all Method Statements have been prepared by a competent person and have been checked, reviewed and signed.
-
Are method statements adequate and suitable for the task?
-
Does the method statement offer the necessary controls and required level of protection?
-
Ensure all operatives are working in accordance with the method statement.
-
Risk Assessments and Method Statements compliant?
Site Set up
-
Are the following items displayed?
-
Latest H&S Policy?
-
Insurance Policy?
-
Fire Plan?
-
Emergency plan and contacts?
-
Signs for doors and cabins?
-
First aid location signs?
-
Assembly point signs?
-
Accident reporting process?
-
No Smoking signs?
-
Health & Safety Law poster ( what you should know)?
-
Is the site set up in accordance with CDM requirements.
Training and Skill Cards
-
Are all persons trained for their respective tasks?
-
Are Skill Cards available for inspection?
Welfare Facilities
-
Ensure a facility is provided to change, dry and store clothing.
-
Are welfare facilities of sufficient size for the number of employees on site and are provided with heating.
-
Ensure access to the welfare facilities are accessible to all persons on the site.
-
Ensure a supply of wholesome drinking water and cups are provided.
-
Are sufficient toilets readily available, maintained, kept clean & are properly lit.
-
Do toilet facilities include washbasins, hot and cold running water, soap and towels.<br>
-
Ensure that the washbasins are large enough to wash up to the elbow and are kept clean.<br>
-
Are welfare facilities cleaned on a daily basis?
-
Are welfare facilities compliant?
Working at Height
-
Check whether the work can be undertaken without working at height.
-
Check that access equipment is erected by competent persons and checked before use.
-
Ensure safe access and egress have been provided to areas.
-
Roof Work
-
Ensure that edge protection is provided to stop people or materials falling.
-
Ensure that precautions have been taken to stop people falling through fragile materials when working on roofs, e.g.: by providing barriers, covers or working platforms.
-
Ensure roof ladders are used in accordance with best practice requirements.
-
Ensure that people are kept away from areas below the roof work.
-
Ladders - Ladders should be used at an angle of 1:4 (75 degrees).
-
Ensure that ladders are in good condition, are not split, warped or have damaged rungs etc.
-
Check whether ladders are suitable for the purpose - only for short term work or for gaining access to another area.
-
Check that ladders rest against a solid level surface and that this is not a fragile or insecure material.
-
Check that ladders are secured to prevent them slipping sideways or backwards.
-
Check that ladders rise a sufficient height above their landing place (approx. 1m or 5 rungs).
-
Safe landing platforms to be provided where a ladder rises to a height of 9m or more.
-
Are work at height operations in accordance with the W@H Regulations?
Other
Summary
Audit Risk Level
-
Risk rating for this Audit.
Corrective Actions
Sign off
-
I confirm I have had the contents of this audit report explained to me.
-
Site operative/supervisor
-
Site operative
-
Site operative
-
Site Operative
-
Site Operative
-
Person conducting this Audit.
-
Audit concluded at:
Closure
-
All actions on this report have been completed on: