Titelpagina

  • PUTM

  • Discription

  • Executed on:

  • File code (year month day)

  • Supplier invited:

  • Supplier present:

  • Recorded by

Technical data transformer

  • EqId

  • Fabr Number

  • Foto nameplate

  • Nameplate to replace

  • Foto's transformer

  • Code reporting

  • PCB

  • NEW PCB report will be taken by Elia ASAP

Quote info

To be provided in the quotation for the works listed in this report:

  • A detailed price for the working hours

  • Language of quote:

  • A detailed price for the materials

  • A detailed price for the logistics resources

  • A detailed price for the extra costs in an emergency scenario (day and night/continuous work to put the transformer into service ASAP = refund time)

  • The estimated duration of unavailability of the transformer

  • The refund time per working day of the transformer, both during the day and at night, to be completed on the standard sheet xls

  • A detailed (recovery) price for the disposal of the residual oil

  • A detailed price for disposal/scrap of all materials, if applicable

  • A detailed price for the necessary measures regarding "working in confined spaces" if applicable

  • The quotation must be received no later than .... after the date of this report

  • ==>

  • Quote to be sent to all people from Elia in the mailinglist

  • The execution delivery date is:

  • FYI : All necessary safety documents (from contractor and subcontractors) have to be delivered at least 2 weeks before entering the substation:

  • Safety documents to deliver at :

To repair or deliver

PURCHAGE ORDER

  • KIND OF PO TO BE

  • Explanation

  • Year of build

  • Explanation

  • Imputation domain:

Specific Works to do (or global view)

  • Fotos

  • Dirciption

  • Grid ticket id

  • MR id

  • WO id

  • WS id

Leakage

LEAKS TO REPAIR

  • LEAKS present?

  • Replacement of all the gaskets (compleet leak-tight)

  • Always make attention to replace the gaskets of the boxes from the CT !!

    joints ti.png

Specific leaks

  • Elimination leakage on bushings VHV

  • To repair with placement of a "MP-kit"

  • Elimination leakage on bushings HV

  • To repair with placement of a "MP-kit"

  • Elimination leakage on bushings LV

  • To repair with placement of a "MP-kit"

  • Elimination leakage on radiators

  • Elimination of welding leakage

  • Elimination leakage on probes thermometers

  • Elimination leakage on valves

  • Elimination of lekkage on flanges, dresser, gaskets or other

  • Elimination of lekkage on cable box HV

  • Elimination of lekkage on lid flange with bolds

  • Elimination of leakage - bottom side of radiators and valves

  • Elimination of leakage on cable box of current transformer

  • Replacement oil seal angle reversal box (hoekomkeerkast)

  • Replacement oil seals of CT boxes

  • Varia

ELECTRICAL COMPONENTS

TO replace

  • replacement oil level gauge transformer, if yes device delivered by

  • replacement oil level gauge OLTC, if yes device delivered by

  • replacement of membrane conservator, if yes device delivered by

  • replacement dry grain reservoir transformer, if yes device delivered by

  • replacement dry grain reservoir OLTC, if yes device delivered by

  • replacement thermometer, if yes device delivered by

  • replacement thermal image, if yes device delivered by

  • Type:

  • replacement URF, if yes device delivered by

  • replacement Bucholz, if yes device delivered by

  • Repalce DGA equipment, if yes device delivered by

  • Change wiring, if yes wiring delivered by

  • Replacement ventilator, if yes device delivered by

  • Remplacement of pumps by new, if yes device delivered by

  • Remplacement of pumps (suplied by Elia), if yes device delivered by

  • Replacement 240V box, if yes device delivered by

  • Make 240V box AREI conform

  • other, if yes device delivered by

To remove

  • Remove Drycol

  • Remove qualitrol

  • other

To add

  • Installation of extra linking box

  • Other

Varia Electrical Equipments

  • Miscellanceous

BUSHINGS

  • Disconnection et Reconnection of HV. Bushings

  • replace gasket or tighten on top of bushing

  • replace gasket or tighten on bottom of bushing

  • To repair hotspot

  • undefined

  • Installation acces hole

To replace by HSP (above 70kV)

  • replacement bushing by new HSP (above 70 kV)

  • ZHV

  • HV

To replace by HSP (under 150kV)

  • replacement bushing by new (type to propose)

  • ZHV

  • HV

  • LV

To replace by DIN

  • Replacement by DIN

  • LV

  • Miscellaneous (varia)

OLTC

  • Disconnecting of the Motor drive unit.

  • Disconnect, replace and reconnect the selector of the OLTC

  • Remplacement of the OLTC Motor drive unit by a new unit MP10

  • Remplacement of the OLTC Motor drive unit by an up-graded MP10-1 unit ( MP10-3)

  • Remplacement of the OLTC Motor drive unit by an ETOS ED

  • Installation acces hole

  • number of

  • Miscellaneous (varia)

OIL

  • Oil drainage under dry air.

  • Oil treatment & Oil fill under vacuum.

  • Change Oil:

  • Oil to refill

  • explication:

  • Tonnage:

  • Refill oil

  • Purge complete by (ready to go into service)

  • Miscellaneous (varia)

  • Description

TANK

  • cleaning of the transformer

  • repaint damaged paint (following Elia procedures)

  • Replacement of valves

  • Dismounting of radiator

  • Installation (Cutting & welding) of an access hole on the tank

  • new aero placement

  • repair aero in factory

  • Miscellaneous (varia)

  • Description

Measurements & reporting

  • Final detailed report to deliver (last 10% of ordered amount)

  • Ratio measuremets

  • Resistance measurements

  • Isolation measurements

  • TG ∆ measurements Transformer

  • TG ∆ measurements Bushings

  • FRHA measurements

  • Special measurments

  • Oil sampling.

  • Oil sample of:

Varia about Measurements

  • Miscellaneous

Access on site

  • Project ongoing

  • Marcation on public road (to provide by supplier)

  • Need special adjustment acces road on site (to provide by supplier)

  • Stability surface (to provide by supplier)

  • Road plates needed (to provide by supplier)

  • Miscellaneous (varia)

Outage needed

  • Transformer outage neededTA

  • extra outage other feeld needed

  • PUTM

  • Miscellaneous (varia)

  • Description

Extra logistical issues

  • Sanitation to be provided or available by

  • Crane to be provided by

  • Scaffold (steiger) to be provided by

  • Platform (hoogtewerker) to be provided by

  • Electrical generator to be provided by

  • Power supply 240v 16 Amps to be provided by

  • varia

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.