Titelpagina
-
PUTM
-
Discription
-
Executed on:
-
File code (year month day)
-
Supplier invited:
- NOVACEC
- TALENCO
- TARFOTECHNICS
- TECHNOLEC
- DE GROOTE
- ADENSOL
- VRM
- OTHER
-
Supplier present:
- NOVACEC
- TALENCO
- TARFOTECHNICS
- TECHNOLEC
- DE GROOTE
- ADENSOL
- VRM
- OTHER
-
Recorded by
- Stas Jos
- Van Dijck Bart
- Deldicque Michel
- Vloeberghs Niels
- Roelans Geert
- Moyson Jérôme
- David Perrault
- Heyse Frank
- a.i.
- !! Scope based on quote (no visit) !!
- Ancona Carmelo
- Haenen Larsen
- Dellmann Serge
- Bauraing Arnaud
- Geurts Brieuc
- Laffineur Martin
- Vannemberck Steve
- Dubois Sébastien
- Depestel Xavier
- De Greef Quentin
- Lebrun Nathan
Technical data transformer
-
EqId
-
Fabr Number
-
Foto nameplate
-
Nameplate to replace
-
Foto's transformer
-
Code reporting
-
PCB
-
NEW PCB report will be taken by Elia ASAP
Quote info
To be provided in the quotation for the works listed in this report:
-
A detailed price for the working hours
-
Language of quote:
- Nederlands
- Français
- English
-
A detailed price for the materials
-
A detailed price for the logistics resources
-
A detailed price for the extra costs in an emergency scenario (day and night/continuous work to put the transformer into service ASAP = refund time)
-
The estimated duration of unavailability of the transformer
-
The refund time per working day of the transformer, both during the day and at night, to be completed on the standard sheet xls
-
A detailed (recovery) price for the disposal of the residual oil
-
A detailed price for disposal/scrap of all materials, if applicable
-
A detailed price for the necessary measures regarding "working in confined spaces" if applicable
-
The quotation must be received no later than .... after the date of this report
-
==>
-
Quote to be sent to all people from Elia in the mailinglist
-
The execution delivery date is:
-
FYI : All necessary safety documents (from contractor and subcontractors) have to be delivered at least 2 weeks before entering the substation:
-
Safety documents to deliver at :
- MAC SUB NORTH
- MAC SUB SOUTH
- PRC
To repair or deliver
PURCHAGE ORDER
-
KIND OF PO TO BE
-
Explanation
-
Year of build
-
Explanation
-
Imputation domain:
- Nex
- GS
- GI
- SI
- TR
- TBD (unknown yet)
Specific Works to do (or global view)
-
Fotos
-
Dirciption
-
Grid ticket id
-
MR id
-
WO id
-
WS id
Leakage
LEAKS TO REPAIR
-
LEAKS present?
-
Replacement of all the gaskets (compleet leak-tight)
-
Always make attention to replace the gaskets of the boxes from the CT !!
Specific leaks
-
Elimination leakage on bushings VHV
-
To repair with placement of a "MP-kit"
-
Elimination leakage on bushings HV
-
To repair with placement of a "MP-kit"
-
Elimination leakage on bushings LV
-
To repair with placement of a "MP-kit"
-
Elimination leakage on radiators
-
Elimination of welding leakage
-
Elimination leakage on probes thermometers
-
Elimination leakage on valves
-
Elimination of lekkage on flanges, dresser, gaskets or other
-
Elimination of lekkage on cable box HV
-
Elimination of lekkage on lid flange with bolds
-
Elimination of leakage - bottom side of radiators and valves
-
Elimination of leakage on cable box of current transformer
-
Replacement oil seal angle reversal box (hoekomkeerkast)
-
Replacement oil seals of CT boxes
-
Varia
ELECTRICAL COMPONENTS
TO replace
-
replacement oil level gauge transformer, if yes device delivered by
-
replacement oil level gauge OLTC, if yes device delivered by
-
replacement of membrane conservator, if yes device delivered by
-
replacement dry grain reservoir transformer, if yes device delivered by
-
replacement dry grain reservoir OLTC, if yes device delivered by
-
replacement thermometer, if yes device delivered by
-
replacement thermal image, if yes device delivered by
-
Type:
- ETOS (IM module)
- CoreTec TM4
- Dynamic Rating BT100
- M-Tec
- TBD
- Other
-
replacement URF, if yes device delivered by
-
replacement Bucholz, if yes device delivered by
-
Repalce DGA equipment, if yes device delivered by
-
Change wiring, if yes wiring delivered by
-
Replacement ventilator, if yes device delivered by
-
Remplacement of pumps by new, if yes device delivered by
-
Remplacement of pumps (suplied by Elia), if yes device delivered by
-
Replacement 240V box, if yes device delivered by
-
Make 240V box AREI conform
-
other, if yes device delivered by
To remove
-
Remove Drycol
-
Remove qualitrol
-
other
To add
-
Installation of extra linking box
-
Other
Varia Electrical Equipments
-
Miscellanceous
BUSHINGS
-
Disconnection et Reconnection of HV. Bushings
-
replace gasket or tighten on top of bushing
-
replace gasket or tighten on bottom of bushing
-
To repair hotspot
-
undefined
- U (HV)
- V (HV)
- W (HV)
- N (HV)
-
Installation acces hole
-
To replace by HSP (above 70kV)
-
replacement bushing by new HSP (above 70 kV)
-
ZHV
- U (ZHV)
- V (ZHV)
- W (ZHV)
- N (ZHV)
-
HV
- U (HV)
- V (HV)
- W (HV)
- N (HV)
To replace by HSP (under 150kV)
-
replacement bushing by new (type to propose)
-
ZHV
- U (ZHV)
- V (ZHV)
- W (ZHV)
- N (ZHV)
-
HV
- U (HV)
- V (HV)
- W (HV)
- N (HV)
-
LV
- u (LV)
- V (LV)
- w (LV)
- n (LV)
To replace by DIN
-
Replacement by DIN
-
LV
- u (LV)
- V (LV)
- w (LV)
- n (LV)
-
Miscellaneous (varia)
OLTC
-
Disconnecting of the Motor drive unit.
-
Disconnect, replace and reconnect the selector of the OLTC
-
Remplacement of the OLTC Motor drive unit by a new unit MP10
-
Remplacement of the OLTC Motor drive unit by an up-graded MP10-1 unit ( MP10-3)
-
Remplacement of the OLTC Motor drive unit by an ETOS ED
-
Installation acces hole
-
number of
-
Miscellaneous (varia)
OIL
-
Oil drainage under dry air.
-
Oil treatment & Oil fill under vacuum.
-
Change Oil:
-
Oil to refill
- New oil Nynas Lyra X
- Recycled oil Germany IEC293
- Recycled oil EOS (UK) IEC296
- Recycled oil from Elia coming from Mervilde
- TBD (please give all options in qoute)
- To deliver; certificate of the total weight of the scrapped pcb containing oil, and not pcb containing oil
- Other
-
explication:
-
Tonnage:
-
Refill oil
-
Purge complete by (ready to go into service)
-
Miscellaneous (varia)
-
Description
TANK
-
cleaning of the transformer
-
repaint damaged paint (following Elia procedures)
-
Replacement of valves
-
Dismounting of radiator
-
Installation (Cutting & welding) of an access hole on the tank
-
new aero placement
-
repair aero in factory
-
Miscellaneous (varia)
-
Description
Measurements & reporting
-
Final detailed report to deliver (last 10% of ordered amount)
-
Ratio measuremets
- YES before intervention
- YES after intervention
- NO
-
Resistance measurements
- YES before intervention
- YES after intervention
- NO
-
Isolation measurements
- YES before intervention
- YES after intervention
- NO
-
TG ∆ measurements Transformer
- YES before intervention
- YES after intervention
- NO
-
TG ∆ measurements Bushings
- YES before intervention
- YES after intervention
- NO
-
FRHA measurements
- YES before intervention
- YES after intervention
- NO
-
Special measurments
- YES before intervention
- YES after intervention
- NO
-
Oil sampling.
- YES before intervention
- YES after intervention
- NO
-
Oil sample of:
Varia about Measurements
-
Miscellaneous
Access on site
-
Project ongoing
-
Marcation on public road (to provide by supplier)
-
Need special adjustment acces road on site (to provide by supplier)
-
Stability surface (to provide by supplier)
-
Road plates needed (to provide by supplier)
-
Miscellaneous (varia)
Outage needed
-
Transformer outage neededTA
-
extra outage other feeld needed
-
PUTM
-
Miscellaneous (varia)
-
Description
Extra logistical issues
-
Sanitation to be provided or available by
-
Crane to be provided by
-
Scaffold (steiger) to be provided by
-
Platform (hoogtewerker) to be provided by
-
Electrical generator to be provided by
-
Power supply 240v 16 Amps to be provided by
-
varia