Basic Project Information

Basic Project Information

  • Date Audit Conducted On

  • Location
  • Project Number

  • Project or Site Name

  • Division (s) working on Project

  • Description of Work

  • Audit Authored by:

Additional Project Information

  • tthis is he

Additional Project Information

  • Michels Management On Site

  • Personnel
  • Name of Manager

  • Number of Personnel on Project

  • Are Additional Personnel Assisting with this Audit

  • List Personnel Assisting with Audit

  • Personnel
  • Name

  • Are Michels Sub Contractors On Site

  • List Michels Sub Contractors Present

  • Sub Contractors
  • Sub Contractor

  • Are Contractors that are not Michels Subs On Site

  • List Other Contractors On Site

  • Contractors
  • Contractor

Postings and PPe

Postings and PPE

  • Does the Site have the Required Labor Postings?

  • Postings

  • Add media

  • Does the Site have the Required HSE Postings and Plans?

  • Postings

  • Add media

  • PPE Required on Project

  • Are the personnel properly fit tested

  • Is appropriate PPE being worn?

Environmental

Environmental

  • Does the Site have someone assigned to manage any spills that might occur?

  • Who is that Person?

  • Are there Environmentally Sensitive Features present?

  • Select the Sensitive Features

  • Are the features flagged, barricaded or otherwise delineated in the field.

  • Are Sensitive Features identified on construction drawings

  • Does the project have a Storm Water Pollution Plan (SWPPP) or similar?

  • Are the required inspections Michels Responsibility?

  • Are Spill Kits present

  • In all vehicles or at least immediately assessable to all crews

  • At all Fueling Stations

Incident Review

Incident Review

  • Draw the Incident

  • Take Pictures and Annotate Pictures

  • List the Personnel Involved with the Incident

  • Personnel Involved
  • List the Equipment that was involved in the Incident

  • Equipment Involved
  • List any Witnesses

  • Witnesses
  • Provide the Witness Contact Information

Corrective Actions Required

Corrective Actions Required

  • Does the Project Require Corrective Actions

  • List Corrective Actions Required

  • Corrective Action
  • Date When Corrective Actions should be Accomplished

  • List Personnel Required to Complete Corrective Action

  • Personnel

Certification

Certification

  • Date and Time Audit was Completed

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.