Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Audit prepared by
- Donald Kempf
-
Location
-
Crane identification number
-
Time on site
-
Hoist manufacturer?
-
Maximum Rated Capacity MRC Working Load Limit WLL
-
Visitor Pass number
-
Hour meter reading
-
Job number
-
Any other comments
-
Any delays in access to the site
JOB SAFETY ANALYSIS ( JSA )
-
Work permit number
-
Working at a height above 1.3 meters from the floor
-
Working at heights permit number
-
Controls to be used
- use the Crows Nest
- use an EWP
- access via a ladder
- other
- N/A
-
Harness required?
-
Working on or near live electrical power?
-
Controls to be used for eletrical work
- isolate on the Crane as required
- isolate and lock out
- isolate at DB and lock out
- testing live, follow std SOP
- N/A
-
Traffic and staff in the area ?
-
Controls to be used
- advise staff in the work area
- place bollards
- Barricade the area
- other
- work conducted outside std hours
-
Any other comments
HOIST
-
Chain condition
-
Gypsy gear condition
-
Hook and safety catch
-
Chain Anchor
-
Overload clutch condition
-
Working height limit adjustment
- Checked No Adjustment made
- Adjustment made
- Adjustment required
- Repairs required
- N/A
-
Working height limit switches
-
Motors
-
Air gap
- Checked No Adjustment made
- Adjustment made
- Adjustment required
- Repairs required
- N/A
-
Couplings
-
Transmission noise and vibration
-
Mountings
CROSS TRAVEL
-
Cross travel wheels
-
Trolley type
- eletric trolley
- continuous chan drive
- push pull trolley
-
Anchor point
-
Fit to rail
-
Continuous chain condition
-
Gear condition
-
Fit to rail
-
Anchor point
-
Motors
-
Air gap
- Checked No Adjustment made
- Adjustment made
- Adjustment required
- Repairs required
- N/A
-
Transmission free from noises and vibrations
-
Gearboxes free from oil leaks
-
Gears and keyways
-
Limit switches and control sensors
-
Couplings
-
Fit to rail
-
Anchor point
-
Mountings
-
Buffers
ELECTRICAL
-
Power Supply system
- Bus bar system
- Reeled cable system
- Catenary system
- Double ring system
-
Hard drawn wire wear
-
Double ring wear
-
Cable condition
-
Tow arm
-
trolley condition
-
Cable condition
-
Cable condition
-
tension and reaction time
-
cable tray area clean
-
Pic of collector heads and bus bar
-
Collector Arms
-
Bus bar Signage
-
Control box
-
Control box condition
-
Contactors
-
Pendant / Radio TX unit
-
Isolators
-
Isolator signage
STRUCTURAL CONDITION
-
Year of manufacture or the year of the last major inspection
-
Hoist is over 10 years old?
-
Is the crane in a suitable condition to return into operation safely
-
Crane removed from service and has been tag out.
-
How old do you think the crane may be?
-
Please note the working life of a crane is as per the manufacturer specifications or a maximum of 10 years of service. Which ever is the lesser
-
7.4 ASSESSMENT FOR SUITABILITY FOR CONTINUED SAFE USE
7.4.1 Assessment for continued safe operation
Cranes that have reached the end of their design life shall be assessed to ensure their suitability for continued use. Where the design life is unknown, this assessment should be carried out at 10-year intervals for the mechanical components and at 25-year intervals for the structure.
The assessment shall also be undertaken where maintenance records indicate repeated failures of any critical component or where the crane has been subjected to an overload greater than 10% of the safe working load for either or both the structure and hoist.
Persons carrying out such an assessment should be supervised by a professional engineer.
NOTES.
1. a cranes design life may not be the same as its actual life and depends on such factors as its classification, usage and its operating environment.
2 Devices are available to record the actual usage of a crane to enable assessment of its remaining design life. Guidance on such devices is given in ISO 12452, 1.
3 Appendix 1. provides guidance on items that may be included in such an assessment.
As part of the assessment, a major inspection of the crane may be necessary (see Clause 7.3.4). -
Is the crane over 25 years old
-
A Crane has a structural Service life of 25 years maximum. After this time period the Crane must be removed from service and full dismantled, internally inspected and repaired and modified to comply with the latest Australian standards or just scrapped.
-
7.4 ASSESSMENT FOR SUITABILITY FOR CONTINUED SAFE USE
7.4.1 Assessment for continued safe operation
Cranes that have reached the end of their design life shall be assessed to ensure their suitability for continued use. Where the design life is unknown, this assessment should be carried out at 10-year intervals for the mechanical components and at 25-year intervals for the structure.
The assessment shall also be undertaken where maintenance records indicate repeated failures of any critical component or where the crane has been subjected to an overload greater than 10% of the safe working load for either or both the structure and hoist.
Persons carrying out such an assessment should be supervised by a professional engineer.
NOTES.
1. a cranes design life may not be the same as its actual life and depends on such factors as its classification, usage and its operating environment.
2 Devices are available to record the actual usage of a crane to enable assessment of its remaining design life. Guidance on such devices is given in ISO 12452, 1.
3 Appendix 1. provides guidance on items that may be included in such an assessment.
As part of the assessment, a major inspection of the crane may be necessary (see Clause 7.3.4). -
Jib is free from any signs of structural deformation?
-
is the crane suitable to be returned into continued service
-
Locked out and removed from service
-
All structural bolts tight and corrosion free?
-
Protective coatings are in a sound and serviceable condition?
-
All mating flanges are free from corrosion
-
Jib is well balanced with no run away motion?
-
All foundations are in a good condition?
GENERAL ITEMS
-
Signage
-
Compass signage
-
Crows nest / service access
-
Access ladder condition
-
Any comments
-
Any sketch that may help?
-
Inspection technician to sign. All work has been done to comply with the relevant Australian Standards.
-
Next routine inspection and service due.
-
Time off site
-
Customer to sign