Title Page

  • Conducted on

  • Prepared by

  • Location
  • Project ID

  • Project Name

  • Service Provider

  • Contractor Onsite

Service Installation

  • Does installation meet MG Design / N1 / Shipper specifications?

  • Has the service been installed to a compliant location?

  • Have the correct service risers & valves been fitted?

  • Have all risers been capped?

  • Has the installation been secured / anchored adequately?

  • Has fabricated pipe work / meter rack been stamped with traceability reference?

  • Has adequate meter protection / bollards been provided?

  • Has internal service been installed to MG standard.

  • Has an external isolation valve been installed?

  • Have approved ID tags been installed on multiple meter installations?

Meter Room / Enclosure

  • Has enclosure / meter room been constructed of suitable materials?

  • Does the enclosure / room adequately secure the installation?

  • Is there 24 hour unhindered authority access?

  • Have the correct locks been fitted - S43 Gas Industry lock?

  • Does enclosure / room meet ventilation specifications for natural ventilation?

  • Does enclosure / room meet ventilation specifications for mechanical ventilation?

  • Have all clearances been achieved as per MG standards.

  • Have regulator relief / vent lines been installed and terminated to a compliant location?

  • Has adequate and compliant lighting been installed?

  • Has meter room signage been installed?

Site

  • Has the site been left in a clean safe condition?

  • Has any site excavation been backfilled and compacted adequately?

Temporary Reinstatement

  • INTERNAL - Has temporary reinstatement been completed adequately?

  • EXTERNAL - Has temporary reinstatement been completed adequately?

Permanent Reinstatement

  • INTERNAL - Has permanent reinstatement been completed adequately?

  • EXTERNAL - Has permanent reinstatement been completed adequately?

Administration

  • Has all SAP equipment including characteristics been updated?

  • Has all SAP equipment been installed correctly to the heirarchy?

  • Have the "As Laids" been submitted to MG?

  • Has GIS been updated?

  • Has Meter Room "pre-commissioning check list" been provided?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.