Title Page
-
Conducted on
-
Prepared by
-
Location
-
Project ID
-
Project Name
-
Service Provider
-
Contractor Onsite
Service Installation
-
Does installation meet MG Design / N1 / Shipper specifications?
-
Has the service been installed to a compliant location?
-
Have the correct service risers & valves been fitted?
-
Have all risers been capped?
-
Has the installation been secured / anchored adequately?
-
Has fabricated pipe work / meter rack been stamped with traceability reference?
-
Has adequate meter protection / bollards been provided?
-
Has internal service been installed to MG standard.
-
Has an external isolation valve been installed?
-
Have approved ID tags been installed on multiple meter installations?
Meter Room / Enclosure
-
Has enclosure / meter room been constructed of suitable materials?
-
Does the enclosure / room adequately secure the installation?
-
Is there 24 hour unhindered authority access?
-
Have the correct locks been fitted - S43 Gas Industry lock?
-
Does enclosure / room meet ventilation specifications for natural ventilation?
-
Does enclosure / room meet ventilation specifications for mechanical ventilation?
-
Have all clearances been achieved as per MG standards.
-
Have regulator relief / vent lines been installed and terminated to a compliant location?
-
Has adequate and compliant lighting been installed?
-
Has meter room signage been installed?
Site
-
Has the site been left in a clean safe condition?
-
Has any site excavation been backfilled and compacted adequately?
Temporary Reinstatement
-
INTERNAL - Has temporary reinstatement been completed adequately?
-
EXTERNAL - Has temporary reinstatement been completed adequately?
Permanent Reinstatement
-
INTERNAL - Has permanent reinstatement been completed adequately?
-
EXTERNAL - Has permanent reinstatement been completed adequately?
Administration
-
Has all SAP equipment including characteristics been updated?
-
Has all SAP equipment been installed correctly to the heirarchy?
-
Have the "As Laids" been submitted to MG?
-
Has GIS been updated?
-
Has Meter Room "pre-commissioning check list" been provided?