Power Works Installing Ducts and Cable Audit
-
Site conductedany other assets or live services in the ground in the working area
-
Conducted on
-
Prepared by
-
Location
Documentations on site
-
Drawings of other assets on site in good order and legible and clearly marked showing locations and correct colour of drawings for services. Please note document numbers on the section showing we have these on site?
-
undefined
-
Has a site safety breifing been gave by the supervisor on site before starting works daily?
-
Emergency contacts on site?
-
All the team aware of what's required for the tasks for today works?
-
Any working restrictions on time and dates if any?
-
What works are being undertaken on site?
-
Do we have the drawings on site for the new install?
-
Are there any hold points we need to be aware of for further works from others?
-
Has everyone signed in the site attendance book on site?
-
Has all operatives on site have their training records with them for inspection for auditors?
-
Do the operatives know where their nearest accident and emergency department is located ?
Site Safety PPE
-
Do we have the safety critical items on site for the tasks to be undertaken on site?
-
Do we have Arc flame retardant overalls worn by operatives on site.
-
Do we have Safety footwear with in sole protection, and no bare toe cap showing on safety foot wear?
-
Do we have safety gloves with suitable cut level as per agreed?
-
Does the team have safety googles or safe glasses suitable for the task being undertaken?
-
Does the team a fully serviceable burns kit and First Kit on site ?
-
Do we have a fire extinguisher in date of one year in good serviceable condition ready for emergency use?
-
Does team have a well stocked Spill kit in vehicle or on site?
Site Hazards
-
Hazards from below ground known services in ground in working area?
-
Live Water hazard?
-
Live Power hazard
-
Live Media hazard?
-
Live Sewer hazard?
-
Live Gas hazards?
-
Live Fuel lines below ground?
-
Live vent pipes near to the works from fuel tanks?
-
Have the team Scanned the area for all assets in the ground?
-
Show the mark-up of the services found and marking on the ground showing sprayed marks?
-
Do we have any overhead hazards?
-
If so please explain and take pictures showing these and are they protected with goal posts?
Site setup SLG
-
Chapter 8 barriers in good condition and ready for safe use with securing clips?
-
Do we have Heras type fencing barriers with feet, clips, back propping stake secured, Signage warning of hazard?
-
Is all segregation secured to each other to prevent others gaining access tom site?
-
Is site using red gates for access into and out of site?
-
Access into and out of excavations safe for use and what are they using?
-
Safe access and egress to and from work area with no trip hazards?
-
Materials on site
-
Do we have sand and stone on site separated from each other?
-
Do we have marker tape on site and enough to cover the cables below ground we are installing?
-
Do we have ducts on site and fitting for installing in ground on site?
-
Do we have spoil that needs to be removed from site and has this been communicated to the yard for collection?
Plant & Tools
-
Tools in good serviceable condition ready for safe use with guards on plant and ready for use by operatives?
-
Does the Digger machine on site have its PUWER-LOLER certs?
-
Winch has this a Through examination of plant for safe use?
-
Moling plant on site in good serviceable condition?
-
Does the operators have their training proof on site?
-
Digger on site with thorough examination in date for the plant (yearly)
-
Power pack in good serviceable condition?
-
Petrol saw with guards and water suppression?
-
Lorry Hiab on site?
-
Cable trailer on site with thorough examination in date one year?
-
Cat & Genny with in date calibration?
Temporary Works
-
Is there any Temp works design on site?
-
Has the temporary works been installed as per the design?
-
Do we require any rescue equipment for these works and if so are these on site, please provide proof in photos and record what is on site with Serial numbers and paperwork for compliance.
Power cable pulling
-
Is the winch in use, and does this have thorough examination certs for the plant.
-
Winch trailer has jockey wheel and stabilising legs used when in use
-
Are the rollers for edge protection, roller skates for in trench to protect the cable when being pulled?
-
Is the cable capped to stop water or moisture ingress into cable?
Permits in place
-
Local authorities Permits
-
Permit to dig
-
Hot works permit
-
Site instructions, work pack.
Other assets
-
Do we have live LV/HV cables in the ground in the working area?
-
Do we have LP / HP/ MP/ LHP Gas mains in the working area?
-
Media
-
Water and Sewers
-
Scanned mark-up on floor before digging tasks start work.
-
Is the cat and genny scanning equipment in calibration dates of one year, please complete serial numbers for both items and date of expiry for calibration.
Site closed down for night
-
Site fencing for deep excavation does this have suitable fencing secured and signage of risk of deep excavation
-
Do we have safe access and egress in to and out the excavation?
-
Is the permit number clearly visible for visiting auditors or local enforcement council inspectors.
-
Is there a Heras fencing gate into the works, If so is this locked to prevent non-authorised from accessing the site.
-
Are any barriers missing securing safety clips to secure the chapter 8 fencing to eachbother and making a secure site?
-
Is there a safe walkway for safe passing past the works if we have footway closed and TM in place for pedestrians to bypass the works?
-
Has all materials been removed from site over night?
-
Do we require any extra protection if there is cables in ground which have not been jointed?